Cityscope July 2010 (PDF - 1.2MB) - City of Greater Geelong
Cityscope July 2010 (PDF - 1.2MB) - City of Greater Geelong
Cityscope July 2010 (PDF - 1.2MB) - City of Greater Geelong
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
projects completed in<br />
the last 12 months<br />
> Barwon Water has commissioned the Anglesea Borefield. The $55m project, which was<br />
complete in late 2009, will supply an average 7,000m litres <strong>of</strong> drinking water a year, or<br />
20% <strong>of</strong> the region’s current demand.<br />
> Stage Two <strong>of</strong> the Promenade Towers Apartments has been completed. The $40m ninestorey<br />
residential development along Waterfront <strong>Geelong</strong> includes 37 apartments.<br />
> Major refit and repair work has been completed on two major oil rigs the Kan Tan V1<br />
and the Ocean Patriot. The work carried out at the Port <strong>of</strong> <strong>Geelong</strong> is estimated at more<br />
than $40m.<br />
> Construction work has been completed on the $35m 6,000sqm redevelopment <strong>of</strong><br />
Queenscliff Harbour. The new 24-hour facility accommodates 280 wet-berths, 100 dryberths,<br />
30 land storage berths and a retail component.<br />
<strong>Geelong</strong> Technology Precinct, Deakin University<br />
> Work has been completed on the $30m <strong>Geelong</strong> Private Medical Centre adjacent to<br />
the <strong>Geelong</strong> Private Hospital. The five-storey facility by developers Argyle Street Central<br />
includes consulting suites, a pharmacy, a café and a pathology centre.<br />
> Work on the <strong>Geelong</strong> Football Club’s $28m refurbishment <strong>of</strong> Skilled Stadium has been<br />
completed. Redevelopment <strong>of</strong> the Ross Drew Stand has increased capacity at the facility<br />
to 30,000 people.<br />
> Construction <strong>of</strong> Stage One <strong>of</strong> <strong>Geelong</strong>’s new $20m Clinical Teaching Unit in Ryrie Street<br />
has been completed. The Deakin University – Barwon Health initiative provides three<br />
above ground levels for dedicated teaching and research and two levels <strong>of</strong> basement<br />
parking. Completion <strong>of</strong> the facility coincides with the progression <strong>of</strong> third year medical<br />
students undertaking their twelve months with <strong>Geelong</strong> Hospital.<br />
> The Port <strong>of</strong> <strong>Geelong</strong> has <strong>of</strong>ficially opened the $28m extension <strong>of</strong> the Corio Quay North<br />
ship loading facility. The expansion almost doubles the wharf’s length to 675m to<br />
create a dedicated berth for woodchip exports and frees up existing berths for other<br />
cargo such as steel, aluminium ingots, mineral sands and timber products.<br />
> Ford Australia has completed $21m upgrades to its <strong>Geelong</strong> plant for the development<br />
and construction <strong>of</strong> the I6 engine.<br />
> Deakin University has completed its $13m expansion <strong>of</strong> the <strong>Geelong</strong> Technology<br />
Precinct. The new building accommodates a new design, pro<strong>of</strong> <strong>of</strong> concept and<br />
manufacturing research centre.<br />
> Target Australia has opened its $10m Ocean Grove store.<br />
> <strong>Geelong</strong> Grammar has <strong>of</strong>ficially opened the $9m Dame Elisabeth Murdoch girl’s<br />
boarding house at its Corio Campus. The new facility accommodates 68 students and is<br />
part <strong>of</strong> the school’s ongoing commitment to co-education.<br />
> The $5m Eureka Hotel refurbishment has been completed.<br />
> Work has been completed on the $4.9m redevelopment <strong>of</strong> the <strong>Geelong</strong> Fire Station on<br />
the corner <strong>of</strong> Yarra and McKillop Streets, <strong>Geelong</strong>.<br />
> The Gordon has completed work on its new $3.9m library and bookshop at the East<br />
<strong>Geelong</strong> campus. The facility is part <strong>of</strong> the overall redevelopment <strong>of</strong> the campus.<br />
> Work has been completed on the <strong>Geelong</strong>’s Performing Arts Centre’s $3m upgrade <strong>of</strong><br />
the Ford Theatre.<br />
> Avalon Airport has completed a $2m upgrade to its terminal and kitchen facilities.<br />
> The 16,000sqm <strong>Geelong</strong> Gateway project has been <strong>of</strong>ficially opened. The development<br />
includes 11 retail stores at <strong>Geelong</strong>’s entrance in Corio.<br />
projects completed<br />
THE facts<br />
• $348m worth <strong>of</strong><br />
construction projects<br />
completed across a wide<br />
range <strong>of</strong> sectors<br />
<strong>Geelong</strong> <strong>City</strong>Scope is one <strong>of</strong> many<br />
publications outlining opportunities in<br />
<strong>Geelong</strong>. More information can be obtained<br />
by visiting our website or contacting us<br />
directly via phone or email.<br />
Our other materials include:<br />
- <strong>Geelong</strong> Economic Indicators Bulletin<br />
- <strong>Geelong</strong> Open for Business<br />
- Invest <strong>Geelong</strong><br />
- Lifestyle <strong>Geelong</strong><br />
- Discover <strong>Geelong</strong> DVD<br />
- <strong>Geelong</strong> Employment Land Opportunities<br />
- Waterfront <strong>Geelong</strong> Positioned<br />
for Success<br />
<strong>City</strong> <strong>of</strong> <strong>Greater</strong> <strong>Geelong</strong><br />
Economic Development,<br />
Planning & Tourism<br />
131 Myers Street<br />
<strong>Geelong</strong> Victoria 3220<br />
PO BOX 104 <strong>Geelong</strong> Victoria 3220<br />
Telephone: (03) 5272 4888<br />
Facsimile: (03) 5272 4855<br />
Email: ecoinfo@geelongcity.vic.gov.au<br />
GSDM 9830<br />
WWW.GEELONGAUSTRALIA.COM.AU<br />
WWW.GEELONGAUSTRALIA.COM.AU