16.11.2013 Views

International Consultants' Training Course - GHDonline

International Consultants' Training Course - GHDonline

International Consultants' Training Course - GHDonline

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

21 February 2008<br />

Assessment of the DOT Area<br />

Date: 21 February 2008_____________________ Time: __________________<br />

Location: Old Naledi Clinic___________________ Room number: ___________<br />

Purpose of room: ________________________________________________________<br />

General background information:<br />

Number of patients (planned)<br />

Composition of patients (drug susceptible or drug resistant)<br />

Number increasing, steady, decreasing<br />

Perceived risk<br />

TB incidence among staff<br />

Contact with patients<br />

IC procedures and policies in place<br />

Other . . . __________________________________________________<br />

__________________________________________________________<br />

__________________________________________________________<br />

__________________________________________________________<br />

Draw the room:<br />

Room dimensions: Width ____________ Depth ____________ Ceiling _________<br />

(List all dimensions on drawing)<br />

Mark ventilation pipes/grilles on drawing. Label as supply air or exhaust air.<br />

Air Exchange Rate Calculations:<br />

Dimensions of Window openings: Width (W) ____m<br />

Width (W) ____m<br />

Width (W) ____m<br />

Height (H) ____m<br />

Height (H) ____m<br />

Height (H) ____m<br />

Area (W • H): ________ m 2<br />

Area (W • H): ________ m 2<br />

Area (W • H): ________ m 2<br />

Velocity measurements: Window 1<br />

Velocity #1 ________ m/s Velocity #2 ________ m/s<br />

Velocity #3 ________ m/s Velocity #4 ________ m/s<br />

Velocity #5 ________ m/s Velocity #6 ________ m/s<br />

Velocity #7 ________ m/s Velocity #8 ________ m/s<br />

Velocity #9 ________ m/s Velocity #10 ________ m/s<br />

Average Velocity: ________ m/s<br />

Average Airflow Rate:<br />

19

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!