18.12.2013 Views

Halifax Harbour Cleanup Inc. - Halifax Regional Municipality

Halifax Harbour Cleanup Inc. - Halifax Regional Municipality

Halifax Harbour Cleanup Inc. - Halifax Regional Municipality

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Issues 19<br />

Table 2b<br />

Advantages<br />

Advantages and Disadvantages of Diffuser Site West of McNabs Island<br />

Disadvantages<br />

• Cleared by port authorities for use . Fewer toxic organic and metal contaminants associated with<br />

fine particulates will be contained in the Inner <strong>Harbour</strong><br />

• Offers good dilution and dispersion characteristics<br />

• Toxic organic and metal contaminants associated with fine<br />

• Little chance of deleterious phytoplankton blooms<br />

particulates coming to rest in the Outer <strong>Harbour</strong> have potential<br />

• Liffle danger of impacts from anchoring for long-term bioaccumulation and biomagnification in<br />

commercially important fish and lobsters, and other marine<br />

species<br />

• Located less than 1 km from Black Rock Beach and 2 km from<br />

Maugher Beach, so higher probability of swimming beach<br />

closure<br />

Table 3a<br />

Advantages<br />

Advantages and Disadvantages of Dartmouth Ocean Terminal STPlOFS Site<br />

Disadvantages<br />

0 Site is at sea level a Availability of site is unknown<br />

• Lower site development costs • Existing land USBS will have to be replaced<br />

0 Lower operating costs • Community acceptance may be difficult<br />

• Area zoned industrial, and has been surrounded by • Site has not been subject to full environmental assessment<br />

industrial and commercial sites for many years<br />

and public consultation<br />

• Site is underutilized<br />

• Direct access from major transportation routes<br />

• STP could be built into site, backsloped, tiered and<br />

landscaped to mitigate aesthetic impacts<br />

• Services, including utilities and emergency response,<br />

nearby<br />

0 Lower operating costs for energy<br />

• Should OFS technology fail, onshore site provides<br />

flexibility for alternative sludge management systems<br />

• When expansion is required, site can be filled out to<br />

approximately 12 m depth using wharf retaining<br />

walls instead of creating earth-filled site out to<br />

greater depths<br />

• Proximity to Georges Island diffuser site (750 m)<br />

• Overland collection system\from Eastern Passage to<br />

STP is less costly and safer than from Eastern<br />

Passage to Ives Island<br />

• Good opportunity for public education and<br />

interpretation of STP/OFS facility, as access is not a<br />

problem

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!