Health <strong>and</strong> <strong>Safety</strong><br />

Executive<br />

39 You can f<strong>in</strong>d fur<strong>the</strong>r guidance on manual h<strong>and</strong>l<strong>in</strong>g on <strong>the</strong> <strong>HSE</strong> website <strong>at</strong><br />

www.hse.gov.uk/msd.<br />

Safe worker<br />

Safe equipment<br />

40 The contract between <strong>the</strong> br<strong>in</strong>g-site owner <strong>and</strong> <strong>the</strong> recycl<strong>in</strong>g company<br />

should stipul<strong>at</strong>e who is responsible for <strong>the</strong> safety <strong>and</strong> <strong>in</strong>tegrity of any<br />

receptacles.<br />

41 Equipment should be ma<strong>in</strong>ta<strong>in</strong>ed <strong>in</strong> a safe condition <strong>and</strong> may need to be<br />

regularly <strong>in</strong>spected by a competent person. They have been known to fail<br />

because progressive wear or deterior<strong>at</strong>ion <strong>in</strong> <strong>the</strong>ir condition has not been<br />

noticed.<br />

42 The cha<strong>in</strong>s, wire ropes, lift<strong>in</strong>g rods etc <strong>at</strong>tached to conta<strong>in</strong>ers such as<br />

bottle banks are considered to be part of <strong>the</strong> load <strong>and</strong>, as such, <strong>the</strong>ir <strong>in</strong>spection<br />

is not a direct requirement under <strong>the</strong> Lift<strong>in</strong>g Oper<strong>at</strong>ions <strong>and</strong> Lift<strong>in</strong>g Equipment<br />

Regul<strong>at</strong>ions 1998 (LOLER). 7<br />

43 However, an <strong>in</strong>spection under <strong>the</strong> Provision <strong>and</strong> Use of Work Equipment<br />

Regul<strong>at</strong>ions 1998 (PUWER) 8 is a requirement because if <strong>the</strong> cha<strong>in</strong>s/ropes/rods<br />

were to fail <strong>the</strong> contents of <strong>the</strong> bottle bank would be dropped, putt<strong>in</strong>g anyone <strong>in</strong><br />

<strong>the</strong> vic<strong>in</strong>ity <strong>at</strong> risk. The scope of <strong>the</strong> PUWER <strong>in</strong>spection would be similar or<br />

identical to th<strong>at</strong> of a thorough exam<strong>in</strong><strong>at</strong>ion under LOLER; <strong>the</strong> significant<br />

difference is th<strong>at</strong> under PUWER <strong>the</strong>re is no requirement for a written report of<br />

<strong>the</strong> <strong>in</strong>spection.<br />

Mechanical lift<strong>in</strong>g oper<strong>at</strong>ions<br />

Table 4 summarises some actions you can take to m<strong>in</strong>imise <strong>the</strong> risks from <strong>the</strong><br />

lift<strong>in</strong>g <strong>and</strong> empty<strong>in</strong>g of recycl<strong>in</strong>g receptacles.<br />

Table 4 Some ways to m<strong>in</strong>imise risks from lift<strong>in</strong>g <strong>and</strong> empty<strong>in</strong>g receptacles<br />

Potential hazards<br />

Receptacle or load-bear<strong>in</strong>g po<strong>in</strong>ts<br />

could fail due to:<br />

■■<br />

wear <strong>and</strong> tear<br />

■■<br />

corrosion<br />

■■<br />

overload<strong>in</strong>g<br />

Destruction or c<strong>at</strong>astrophic failure<br />

of lift<strong>in</strong>g equipment or unexpected<br />

movement of <strong>the</strong> receptacle when<br />

released<br />

Collision risks to pedestrians<br />

dur<strong>in</strong>g pick-up/exchange<br />

oper<strong>at</strong>ions<br />

Risks of receptacle over-run<br />

outside <strong>the</strong> design<strong>at</strong>ed area<br />

Preventive fe<strong>at</strong>ures<br />

Inspection to check <strong>the</strong> <strong>in</strong>tegrity of <strong>the</strong>:<br />

■■<br />

recycl<strong>in</strong>g receptacles<br />

■■<br />

lift<strong>in</strong>g equipment<br />

■■<br />

lift<strong>in</strong>g po<strong>in</strong>ts<br />

The skip should be able to move freely as <strong>in</strong>tended – ensure <strong>the</strong>re is<br />

no snagg<strong>in</strong>g of cha<strong>in</strong>s<br />

Ensure pedestrians are excluded from areas where <strong>the</strong>se oper<strong>at</strong>ions<br />

are tak<strong>in</strong>g place<br />

Some premises have made this task easier by provid<strong>in</strong>g raised floor<br />

guides <strong>and</strong> ‘wheel stops’ to ease skip loc<strong>at</strong>ion <strong>and</strong> prevent over-run<br />

(ie <strong>the</strong> receptacle skidd<strong>in</strong>g when placed, <strong>and</strong> mov<strong>in</strong>g outside <strong>the</strong><br />

<strong>in</strong>tended area)<br />

<strong>Safety</strong> <strong>at</strong> ‘br<strong>in</strong>g-sites’ <strong>in</strong> <strong>the</strong> <strong>waste</strong> <strong>management</strong> <strong>and</strong> recycl<strong>in</strong>g <strong>in</strong>dustry Page 10 of 13