Water and Sanitation <strong>Project</strong><br />
in<br />
Monkey Bay Health Zone, Mangochi District, <strong>Mal</strong>awi<br />
<strong>Project</strong> Description <strong>Document</strong><br />
November <strong>2006</strong><br />
The Icelandic International<br />
Development Agency (ICEIDA)<br />
The Government of the<br />
Republic of <strong>Mal</strong>awi
Table of Contents<br />
ACRONYMS ................................................................................................................................................ 3<br />
PROJECT SUMMARY SHEET................................................................................................................. 6<br />
FOREWORD ................................................................................................................................................ 9<br />
1. INTRODUCTION ........................................................................................................................... 11<br />
1.1 Socio Economic Situation in <strong>Mal</strong>awi.................................................................................... 11<br />
1.2 Population ............................................................................................................................ 11<br />
1.3 Description of Current Situation of the Water and Sanitation Sector .................................. 12<br />
1.4 The Government Policy and Strategy in the Water and Sanitation Sector ........................... 12<br />
1.5 Previous and Ongoing Aid to the Sector............................................................................... 13<br />
1.6 Institutional Framework for Development Efforts in the Sector........................................... 13<br />
2. PROJECT BACKGROUND AND JUSTIFICATION................................................................. 15<br />
2.1 Problem to be Addressed...................................................................................................... 15<br />
2.2 Expected end of <strong>Project</strong> Situation......................................................................................... 15<br />
2.3 Target Group ........................................................................................................................ 16<br />
2.4 <strong>Project</strong> Site ........................................................................................................................... 16<br />
2.5 Roles and Functions of the Water, Environment and Sanitation Taskforce (WEST)............ 17<br />
2.6 Cross Cutting Issues for Special Consideration ................................................................... 19<br />
3. DEVELOPMENT OBJECTIVE .................................................................................................... 19<br />
4. SPECIFIC OBJECTIVES .............................................................................................................. 19<br />
5. MAIN OUTPUTS ............................................................................................................................ 20<br />
6. THE PROJECT STRATEGY ........................................................................................................ 20<br />
7. ACTIVITIES.................................................................................................................................... 22<br />
8. MAIN INPUTS................................................................................................................................. 24<br />
9. ASSUMPTIONS .............................................................................................................................. 26<br />
10. RISKS AND CONSTRAINTS........................................................................................................ 26<br />
11. ORGANISATION, ADMINISTRATION AND MONITORING OF THE PROJECT ............ 26<br />
12. INDICATORS AND MEANS OF VERIFICATION.................................................................... 29<br />
13. MONITORING, REPORTING AND EVALUATION ................................................................ 30<br />
14. SKELETON BUDGET.................................................................................................................... 32<br />
15. DISBURSEMENT OF FUNDS, ACCOUNTING AND AUDITING .......................................... 33<br />
16. PROJECT IMPLEMENTATION PLAN...................................................................................... 33<br />
17. REFERENCES ................................................................................................................................ 34<br />
Annex 18.1 Logical Framework Matrix (LFWM) for the <strong>Project</strong> .................................................. 35<br />
Annex 18.2 Numbers of Boreholes and Latrines in the Monkey Bay Health Zone ........................ 37<br />
Annex 18.3 Terms of Reference for the ICEIDA <strong>Project</strong> Advisor .................................................. 38<br />
Annex 18.4 Draft <strong>Project</strong> Agreement with Communities. .............................................................. 40<br />
Annex 18.5 <strong>Project</strong> Implementation Plan ...................................................................................... 42<br />
Annex 18.6 Organogram/organisational Chart ............................................................................. 47<br />
Annex 18.7 ICEIDA’s Implementation Unit................................................................................... 48<br />
Annex 18.8 <strong>Project</strong> Reporting Structure ........................................................................................ 49<br />
Annex 18.9 Terms of Reference for the <strong>Project</strong> Steering Committee (PSC) .................................. 50<br />
1
Annex 18.10 Terms of Reference for the <strong>Project</strong> Supervisory Board (PSB) .................................... 51<br />
Annex 18.11 Terms of Reference for the ICEIDA <strong>Project</strong> Co-ordinator ......................................... 52<br />
FIGURE 1 MAP OF THE PROJECT AREA .......................................................................................................... 16<br />
FIGURE 2 ORGANISATIONAL HIERARCHY FOR PROJECT IMPLEMENTATION ................................................... 27<br />
Front cover photo of community based maintenance by Jo Tore Berg.<br />
2
Acronyms<br />
AEHO<br />
AHSA<br />
AIDS<br />
BOQ<br />
CBM<br />
CBO<br />
CDA<br />
DA<br />
DANIDA<br />
DEC<br />
DEHO<br />
DEO<br />
DHO<br />
DPD<br />
DWC<br />
EMRWSS<br />
EU<br />
GDP<br />
GOM<br />
HIV<br />
HSA<br />
ICEIDA<br />
JICA<br />
Assistant Environmental Health Officer<br />
Acting Hospital Service Administrator<br />
Acquired Immunodeficiency Syndrome<br />
Bill of Quantities<br />
Community Based Management<br />
Community Based Organisation<br />
Community Development Assistant<br />
District Assembly<br />
Danish International Development Agency<br />
District Executive Committee<br />
District Environmental Health Officer<br />
District Environmental Officer<br />
District Health Officer<br />
District Director of Planning and Development<br />
District Water Coordinator<br />
East Mangochi Rural Water Supply and Sanitation Programme<br />
European Union<br />
Gross Domestic Product<br />
Government of <strong>Mal</strong>awi<br />
Human Immunodeficiency Virus<br />
Health Surveillance Assistant<br />
Icelandic International Development Agency<br />
Japanese International Cooperation Agency<br />
3
KFW<br />
KGP<br />
LFWM<br />
MASAF<br />
MEGS<br />
MGDS<br />
MIS<br />
MPRS<br />
MOH<br />
M & E<br />
M & R<br />
M S M E<br />
PASU<br />
PCM<br />
PHAST<br />
PIM<br />
PIU<br />
PM<br />
PPM<br />
SWAP<br />
TA<br />
TBA<br />
TMT<br />
UNDP<br />
VCT<br />
Kredit fuer Wiederaufbau<br />
Kalembo Groundwater <strong>Project</strong><br />
Logical Framework Matrix<br />
<strong>Mal</strong>awi Social Action Fund<br />
<strong>Mal</strong>awi Economic Growth Strategy<br />
<strong>Mal</strong>awi Growth and Development Strategy<br />
Management Information System<br />
<strong>Mal</strong>awi Poverty Reduction Strategy<br />
Ministry of Health<br />
Monitoring and Evaluation<br />
Monitoring and Reporting<br />
Micro, Small and Medium Scale Enterprises<br />
<strong>Project</strong> Advisory Service Unit<br />
<strong>Project</strong> Cycle Management<br />
Participatory Hygiene and Sanitation Transformation<br />
Participatory Impact Monitoring<br />
<strong>Project</strong> Implementation Unit<br />
<strong>Project</strong> Manager<br />
<strong>Project</strong> Planning Matrix<br />
Sector Wide Approach<br />
Traditional Authority<br />
Traditional Birth Attendant<br />
Technical Management Team<br />
United Nations Development Programme<br />
Voluntary Counselling and Testing<br />
4
WES<br />
WEST<br />
VHWC<br />
WHO<br />
WMA<br />
Water and Environmental Sanitation<br />
Water Environment and Sanitation Task Force<br />
Village Health and Water Committee<br />
World Health Organisation<br />
Water Monitoring Assistant<br />
5
<strong>Project</strong> Summary Sheet<br />
Country:<br />
Sector:<br />
<strong>Project</strong> Title:<br />
<strong>Mal</strong>awi<br />
Water and Sanitation<br />
Water and Sanitation <strong>Project</strong><br />
Monkey Bay Health Zone<br />
Estimated Duration: <strong>2006</strong> to 31.12.<strong>2010</strong><br />
Estimated Total Cost: US$ 3 275 500<br />
ICEIDA Contribution: US$ 2 729 500<br />
Government of <strong>Mal</strong>awi Contribution: US$ 546 000<br />
Development Objective:<br />
The overall objective of the <strong>Project</strong> is to assist the <strong>Mal</strong>awi Government in its efforts to<br />
achieve the Millennium Development Goals, (herein referred to as MDGs), and its<br />
national development goal of economic growth as laid down in the <strong>Mal</strong>awi Growth and<br />
Development Strategy, (herein referred to as MGDS), in order to ensure that water<br />
resources are well protected and managed as well as reducing water and sanitation related<br />
diseases in the Monkey Bay Health Zone. This project is expected to contribute to<br />
improved health standards and an increase in the quality of life of the most vulnerable<br />
part of the population.<br />
Specific Objectives:<br />
1. Increasing the number of functioning boreholes in the Monkey Bay Health Zone;<br />
2. Building capacity among staff at district level on Water and Sanitation and the<br />
communities on Community Maintenance of boreholes and pumps by offering<br />
training;<br />
3. Increasing knowledge and information about hygiene and sanitation among the<br />
target group;<br />
4. Increasing numbers of shallow wells in the target area and improving shallow<br />
well protection;<br />
5. Putting to good use two natural springs in Mvunguti Village before the end of<br />
2007, and to build up well functioning Community Based Management system<br />
there;<br />
6. Improving the Community Based Management of the various water resources by<br />
offering training courses for the target group;<br />
7. Promoting networking and a functional coordination, monitoring and reporting<br />
system between stakeholders.<br />
Expected Outputs:<br />
In order to achieve the specific objectives the project will have to deliver the following<br />
results:<br />
1. Up to 100 new boreholes drilled and functional, 50 boreholes repaired and civil<br />
works on or around those areas done according to national standards by end of<br />
<strong>2010</strong>.<br />
6
2. Adequate and properly trained water point committees established and, qualified<br />
to maintain boreholes and pumps (committees capable of Community Based<br />
Maintenance and repair work).<br />
3. Adequate and properly trained committees on hygiene and sanitation that can<br />
train and sensitize the target group.<br />
4. Up to 300 shallow wells protected at household level on a self help basis.<br />
5. Two natural springs protected and improved for supply of safe drinking water on<br />
a community participatory basis.<br />
6. Trained committees and leaders in Community Based Management.<br />
7. A functioning system put in place regarding, “Planning, coordination, monitoring<br />
information sharing and reporting system” between stakeholders through DEC<br />
and District Assembly.<br />
The <strong>Mal</strong>awi Government commits itself to:<br />
1. Provide a number of professional extension staff (CDA, HSA, WMA) in the<br />
project area, and shall ensure timely execution of the project’s activities;<br />
2. Pay salaries of all Government staff on the project;<br />
3. Make necessary provisions and allocations in the Annual Budgets (Public<br />
Investment Plan) from 2007/08 to <strong>2010</strong> for paying allowances and other expenses<br />
for staff from the Ministry of Irrigation and Water Development for supervision<br />
of the <strong>Project</strong> activities in accordance with <strong>Mal</strong>awi Government Rules and<br />
Regulations;<br />
4. Ensure regular and appropriate supervision of extension staff from the Mangochi<br />
District Office;<br />
5. Designate a Government Officer at district level in Mangochi (Director of<br />
Planning or any other appropriate officer) who shall work in close collaboration<br />
with the ICEIDA’s <strong>Project</strong> Manager;<br />
6. Ensure that at the end of the <strong>Project</strong> Government will make efforts to employ<br />
additional extension staff who were under the <strong>Project</strong> but on ICEIDA’s payroll.<br />
ICEIDA commits itself to:<br />
1. Provide technical and financial assistance to the <strong>Mal</strong>awi Government as detailed<br />
in the <strong>Project</strong> Description <strong>Document</strong>;<br />
All fees, salaries and operational costs for the <strong>Project</strong> Advisor/<strong>Project</strong> Manager<br />
and ICEIDA’s <strong>Project</strong> - Coordinator shall be paid by ICEIDA in accordance with<br />
ICEIDA’s Rules and Regulations;<br />
2. Procure and fund all relevant utilities (i.e. equipment and materials as well as<br />
vehicles and motor Cycles) that will be used for the implementation of the<br />
<strong>Project</strong>;<br />
3. Cost and provide consultancies to assist in the project implementation as and<br />
when need arises;<br />
4. Provide funds for construction of boreholes and rehabilitation of older ones;<br />
5. Fund and facilitate training at all levels and other capacity building for<br />
extensional staff and communities during the <strong>Project</strong>;<br />
7
6. Provide support for surveys (boreholes and shallow wells) and other studies found<br />
appropriate to implement the <strong>Project</strong>’s objectives;<br />
7. Pay necessary allowances and transport costs for local staff to attend scheduled<br />
meetings, events or activities related to the delivery of the project activities, as<br />
well as allowances for representatives from relevant Ministries for <strong>Project</strong><br />
meetings. Allowances shall be paid in accordance with ICEIDA’s Rules and<br />
Regulations;<br />
8. Pay salaries of locally hired experts and cover contingency (e.g. transport and<br />
stationary) regarding the <strong>Project</strong>, as found appropriate;<br />
9. Recruit and pay salaries for additional staff, water and health assistants whose<br />
services needed in order to fulfil the Objectives of the <strong>Project</strong>.<br />
Expected contribution by local communities:<br />
1. Provision of locally available materials and labour (e.g. construction of water and<br />
sanitation facilities);<br />
2. Organisation in the villages/sites and participation in finding places for boreholes;<br />
3. Organising of Water Point Committees for implementation of the <strong>Project</strong>;<br />
4. Carrying out local organisational tasks such as collection and delivery of local<br />
construction materials (e.g. sand, stone, water);<br />
5. Providing safe place(s) for storage of construction materials;<br />
6. Reporting regular of the various stages of construction;<br />
7. Assuming ownership and taking full responsibility of management and<br />
maintenance of the water points through the Water Point Committees;<br />
8. Establishing a local fund for maintenance and spare parts of the water and<br />
sanitation infrastructure.<br />
A Borehole Users <strong>Project</strong> Agreement will be signed between the <strong>Project</strong> Implementation<br />
Unit and the communities involved in the <strong>Project</strong>. (See draft agreement in Annex no<br />
18.4)<br />
8
Foreword<br />
This <strong>Project</strong> <strong>Document</strong> for the Water and Sanitation <strong>Project</strong> for Monkey Bay Health<br />
Zone in Mangochi District, <strong>Mal</strong>awi is the outcome of a number of events and the<br />
collaboration of different institutions and persons.<br />
In June 2004, during a visit by an ICEIDA delegation to Monkey Bay Community<br />
Hospital, the Environmental Health Officer put forward an informal proposal for<br />
ICEIDA’s consideration regarding possible support by the agency of the Water and<br />
Sanitation sector as a measure to reduce water and sanitation related diseases. This<br />
matter was discussed among members of the delegation and the ICEIDA staff members<br />
in <strong>Mal</strong>awi. It was then decided that the suggestion be forwarded to the board of ICEIDA<br />
for consideration. Ms Þórdís Sigurðardóttir, ICEIDA Country Director at that time and<br />
Mr Jóhann Pálsson ICEIDA <strong>Project</strong> Manager in the Fisheries <strong>Project</strong>, submitted a memo<br />
to the General Director of ICEIDA, Mr Sighvatur Björgvinsson where it was suggested<br />
that a survey should be conducted before ICEIDA made a decision to embark on such a<br />
project.<br />
Between October and December 2004 an appraisal team was organised comprising of<br />
Mr Guðni M. Eiríksson as a Consultant from ICEIDA and Mr Richard Chola, a Senior<br />
Assistant District Environmental Health Officer based in Monkey Bay. The results of the<br />
appraisal were presented to ICEIDA Board of Directors. After careful consideration of<br />
the appraisal report and the recommendations therein the Board agreed to embark on a<br />
project on Water and Sanitation activities in the Monkey Bay Health Zone.<br />
On October 12 th 2005, Dr W.O.D Sangala, the Principal Secretary of the Ministry of<br />
Health and Population affirmed support to the planned project on behalf of his ministry.<br />
In December 2005, Africa-South <strong>Project</strong> Partners, represented by Mr Z.C.N Zana were<br />
hired as a consultant to formulate this particular <strong>Project</strong> <strong>Document</strong>, based on the appraisal<br />
study document of December 2004, field analysis and a two day participatory workshop<br />
with the local partners. The consultancy was commissioned by the ICEIDA Country<br />
Director, Mrs Margrét Einarsdóttir.<br />
The consultant worked closely with the following team:<br />
• Zacharia Solomoni – Assistant Environmental Health Officer Monkey Bay<br />
• Bright Siwale – Health Assistant Monkey Bay<br />
• Richard Chola – Senior Assistant Environmental Health Officer Monkey Bay<br />
• Harry Chipeni – Director of Planning and Development for Mangochi District<br />
• Beatrice Mtotha – Environmental Health Officer Water & Sanitation for<br />
Mangochi District<br />
• Kiswell Phiri –Water Coordinator for Mangochi District<br />
• Chief Nankumba – Traditional Authority<br />
• Pondeponde –Water Officer for Mangochi District<br />
• Phaless Chizule – District Community Development Officer<br />
• Ársæll Kristófer Ársælsson – <strong>Project</strong> Manager ICEIDA<br />
9
• Ragnhildur Rós Indridadóttir – Reproductive Health Adviser ICEIDA<br />
• Lovísa Leifsdóttir – Medical Adviser, ICEIDA<br />
• Annie Kagone – Health Surveillance Assistant<br />
• Getrude Kachepatsinga – Health Surveillance Assistant<br />
• Faniza Kaulembe - Community Development Assistant<br />
• Sylvia Hamadziripi – Moderation Assistant to Consultant<br />
The first skeleton draft was presented to the partners at national level who made<br />
significant contributions to his document. Present at the meeting were the following:<br />
• W. O Sangala - Principal Secretary Ministry of Health – Chairman<br />
• M. Einarsdóttir - Country Director, ICEIDA<br />
• Z C N Zana - Senior Partner Africa-South <strong>Project</strong> Partners – Consultant<br />
• Á. Kristófer Ársælsson - <strong>Project</strong> Manager, ICEIDA<br />
• H Masuku - Chief Environmental Health Officer Ministry of Health<br />
• O M Kankhulungo - Ministry of Irrigation & Water Development<br />
• J Kazombo - Ministry of Irrigation & Water Development<br />
• G W <strong>Mal</strong>unga - Principal Secretary Ministry of Irrigation & Water Development<br />
• S Hamadziripi - Moderation Assistant to Consultant<br />
The draft document was revised and elaborated further by Mrs Margrét Einarsdóttir, -<br />
ICEIDA Country Director, Mr. Ársæll Kristófer Ársælsson - ICEIDA <strong>Project</strong> Manager<br />
for the Fisheries <strong>Project</strong> and Mr. Boniface N.C. Gondwe, Director in the Ministry of<br />
Irrigation and Water Development. Others that read the document and gave valuable<br />
comments were Ms Þórdís Sigurðardóttir Reykjavík - ICEIDA Deputy Director, Mr.<br />
Kelvin Sentala - Legal Practitioner, Mr. James Mambulu -Water and Environmental<br />
Specialist at CIDA <strong>Mal</strong>awi, Mr. Jo Tore Berg - BA in Anthropology and Intern at<br />
ICEIDA in <strong>Mal</strong>awi and Mrs. Sigfríður Gunnlaugsdóttir - ICEIDA <strong>Project</strong> Manager for<br />
Social <strong>Project</strong> in <strong>Mal</strong>awi.<br />
10
1. Introduction<br />
1.1 Socio Economic Situation in <strong>Mal</strong>awi<br />
More than 52% of the population of <strong>Mal</strong>awi, which is currently estimated at 12.5 (2005)<br />
million, live under the income poverty line and of these 22.4% live in extreme poverty. 1<br />
In terms of employment, farming is the main activity in the rural areas (81.4%). 2<br />
Although agriculture is the main activity, agricultural sales do not contribute the most<br />
important source of cash income. Generally, rural households spend about 58.7% 3 of<br />
their income on food and there is inadequate income spent on other basic needs and<br />
productive means.<br />
Health indicators have shown that life expectancy in <strong>Mal</strong>awi dropped from 41.8 years in<br />
1970-75 to 39.6 years in 2000-05. 4 The HIV/AIDS epidemic has contributed to the<br />
decreased life expectancy in <strong>Mal</strong>awi. The Infant mortality rate for the under five is<br />
estimated to be 112 deaths per 1000 live births (2003). 5<br />
Due to these poor socio-economic indicators, the new <strong>Mal</strong>awi Growth and Development<br />
Strategy (MGDS) maps improved access to water supply and sanitation out as one of its<br />
key strategies to achieve economic growth. The <strong>Project</strong> is aimed at achieving this partly<br />
by establishing water supply and sanitation systems using demand driven approaches and<br />
participatory hygiene and sanitation transformation. 6<br />
The <strong>Mal</strong>awi Government, in consultation with its stakeholders, has developed the MGDS<br />
as a single Strategy that consolidates the MPRS (<strong>Mal</strong>awi Poverty Reduction Strategy),<br />
the MEGS (<strong>Mal</strong>awi Economic Growth Strategy), the Health SWAP (Sector Wide<br />
Approach) and various sector strategies. The MGDS has been developed for the next five<br />
years and is linked to the <strong>Mal</strong>awi Millennium Development Goals, where MGDS<br />
assesses economic growth as central to achieving the MDG. The MGDS seeks to achieve<br />
the MDG of access to clean water and sanitation. 7<br />
1.2 Population<br />
It is estimated that 83.6% 8 of the population of <strong>Mal</strong>awi lives in the rural areas whereby<br />
55.9% of the rural population live in poverty. 9 The Southern Region Rural has the<br />
highest proportion of poor households (64.4%) compared to the Northern Region Rural<br />
(56.3%) and Central Region Rural (46.7%). 10 Mangochi district forms part of the<br />
southern region and has a population of approximately 600,000. The ethnic composition<br />
1 National Statistic Office. 2005. Integrated Household Survey 2004-2005, p. 8 and 143.<br />
2 National Statistic Office. 2005. Integrated Household Survey 2004-2005, p 61.<br />
3 National Statistic Office. 2005. Integrated Household Survey 2004-2005, p 69.<br />
4 UNDP. 2005. Human Development Report 2005, p. 253.<br />
5 UNDP. 2005. Human Development Report 2005, p. 253<br />
6 Government of <strong>Mal</strong>awi. 2005. <strong>Mal</strong>awi Growth and Development Strategy. Volume 1, p. 60.<br />
7 Government of <strong>Mal</strong>awi. 2005. <strong>Mal</strong>awi Growth and Development Strategy. Volume 1, p. 5-7.<br />
8 UNDP. 2005. Human Development Report 2005, p. 235<br />
9 National Statistic Office. 2005. Integrated Household Survey 2004-2005, p. 145.<br />
10 National Statistic Office. 2005. Integrated Household Survey 2004-2005, p. 145.<br />
11
of Mangochi District is dominated by the Yao and other smaller ethnic groups of Chewa,<br />
Thumbuka, Tonga, Ngoni and Lomwe. The Monkey Bay Health Zone is, however,<br />
dominated by the Chewa.<br />
The target area for the project is the Monkey Bay Peninsula which falls under T.A.<br />
Nankumba, composed of 98 villages with 21,300 households and a population of about<br />
107,000. The majority of the households in the peninsula are smallholders, but fish<br />
businesses form an important part of the economy in the villages closest to the lake.<br />
1.3 Description of Current Situation of the Water and Sanitation Sector<br />
The Integrated Household Survey 2004-2005 showed that only 66.4% of <strong>Mal</strong>awian<br />
households have access to improved water source with lower access in rural (63.9%) than<br />
in urban (85.1%) areas. According to this survey 73.3% of households in the whole of<br />
Mangochi District have access to an improved water source. 11 Many people whose<br />
borehole pumps are non functional simply resort to unsafe drinking water sources like<br />
lakeshore and river waters. There have been a number of cholera outbreaks along the<br />
lakeshore due to unsafe water. This trend culminated in the 2001/02 cholera outbreak<br />
that reported over 33,000 cases and 100 deaths. Cholera cases were normally associated<br />
with the rainy period but in Monkey Bay, cholera cases have been reported even during<br />
the dry season signalling the seriousness of the situation.<br />
The provision of equitable access to potable water supplies and good sanitation facilities<br />
is pivotal to poverty reduction as this has a direct impact on health status of the<br />
population and therefore their productivity. Preventive health care areas are mainly<br />
nutrition, water and sanitation and prevention of common diseases such as malaria.<br />
1.4 The Government Policy and Strategy in the Water and Sanitation Sector<br />
In the MGDS the overall goals of the Government of <strong>Mal</strong>awi are to:<br />
• Ensure that water resources are well protected and managed in order to reduce<br />
manufacturing cost and increase ability to engage in different forms of<br />
manufacturing that require water.<br />
• Reduce water borne diseases. 12<br />
The key strategies in order to achieve these goals are to:<br />
• Empower national authorities to manage water resources using Integrated Water<br />
Resources Management approach and establish good monitoring system.<br />
• Improve the quality of surface and ground water.<br />
• Improve sustainable access to water supply and sanitation so that among others,<br />
every <strong>Mal</strong>awian has access to potable water within a maximum distance of 500m.<br />
• Integrate rural water supply and participatory hygiene and sanitation<br />
transformation. 13<br />
11 National Statistic Office. 2005. Integrated Household Survey 2004-2005, p. 87.<br />
12 Government of <strong>Mal</strong>awi. 2005. <strong>Mal</strong>awi Growth and Development Strategy. Volume 1, p. 60.<br />
12
1.5 Previous and Ongoing Aid to the Sector<br />
The Government of <strong>Mal</strong>awi has put a great deal of effort into improving the quality of<br />
drinking water by providing piped water schemes and borehole pumps throughout the<br />
country. A number of development organisations have been involved in the promotion of<br />
Water and Sanitation in Mangochi District, including MASAF, EU Micro projects, JICA,<br />
KFW through GITEC, DANIDA and World Vision through MICAH <strong>Project</strong>s. There are<br />
considerable examples of water and sanitation projects within the district, both positive<br />
and negative, that the <strong>Mal</strong>awi Government has learned from and takes into account in the<br />
new Policy paper MGDS where the focus is, among other things, on establishing and<br />
maintaining a register of all actors in the water and sanitation field, and on conducting<br />
research aimed at establishing resource potential and guides. The Government also<br />
focuses on incorporating local governments and communities in planning and<br />
management of water supplies and sanitation. 14<br />
<strong>Mal</strong>awi Social Action Fund, hereinafter referred to as MASAF, financed by the World<br />
Bank, is the most important individual programme working within the water and<br />
sanitation sector in <strong>Mal</strong>awi. MASAF projects are implemented through the District<br />
Assembly in terms of coordination, management of implementation, while the financial<br />
administration is done through a special MASAF implementation unit.<br />
The Government of <strong>Mal</strong>awi and KFW, through GITEC, have been involved in the East<br />
Mangochi Rural Water Supply and Sanitation Programme (EMRWSS) from 1999 to<br />
<strong>2006</strong> constructing 943 water points and installing 41,350 sanplats. The preceding<br />
Kalembo Groundwater <strong>Project</strong> (KGP) from 1995 to 1998 constructed 380 water points<br />
and installed 9,950 sanplats. The boreholes were fitted with AFRIDEV hand pumps.<br />
Through its focus on community participation during all project phases – planning,<br />
implementation and operation, strong emphasis on creating community ownership of the<br />
boreholes, community training in maintenance and the use of the demand driven<br />
approach, the projects have achieved a high percentage of functioning boreholes with<br />
96% of boreholes working in the KGP (2005) and 99 % in EMRWSS (<strong>2006</strong>). 15<br />
1.6 Institutional Framework for Development Efforts in the Sector<br />
For this <strong>Project</strong> a bilateral agreement between ICEIDA and the Government of <strong>Mal</strong>awi<br />
will be signed through a Memorandum of Understanding in accordance with the General<br />
Agreement of Forms and Procedures between the Government of the Republic of Iceland<br />
and the Government of the Republic of <strong>Mal</strong>awi. The project will be financed jointly by<br />
ICEIDA and the Government of <strong>Mal</strong>awi. The communities will be responsible for the<br />
supply of local materials, labour and long term maintenance of the facilities.<br />
13 Government of <strong>Mal</strong>awi. 2005. <strong>Mal</strong>awi Growth and Development Strategy. Volume 1, p. 60.<br />
14 Government of <strong>Mal</strong>awi. 2005. <strong>Mal</strong>awi Growth and Development Strategy. Volume 2, p.55.<br />
15 Gitec. <strong>2006</strong>. Rural Water Supply and Sanitation <strong>Project</strong>s 1995-<strong>2006</strong>, p.1- 9.<br />
13
An Annual Activity Plan for the <strong>Project</strong> will be prepared along with the Annual Budget<br />
in October of each year in accordance with this <strong>Project</strong> Description <strong>Document</strong> and the<br />
skeleton budget. It will be done in a participatory manner by involving all stakeholders<br />
including the District Assembly, as well as district representatives of the Ministry of<br />
Health, Ministry of Irrigation and Water Development, Ministry of Women and Child<br />
Welfare, Local Leaders and ICEIDA.<br />
The responsibility of implementing this <strong>Project</strong> will lie mainly with the Ministry of<br />
Irrigation and Water Development at district level as that Ministry have been designated<br />
by the government to be responsible for all issues relating to water and sanitation in the<br />
country. It has been noted however that the Ministry of Irrigation and Water<br />
Development has limited resources as far as personnel at district level is concerned, with<br />
only three technical members of staff. Lack of extension workers is also foreseeable. In<br />
order to fulfil the objectives of the <strong>Project</strong> ICEIDA shall commit itself to recruit and pay<br />
salaries of additional staff i.e. water and health assistants when deemed necessary. As<br />
ICEIDA phases out its support the Government of <strong>Mal</strong>awi undertakes to employ any<br />
additional extension staff employed by ICEIDA for the <strong>Project</strong>.<br />
The coordination of the different stakeholders shall be the responsibility of the District<br />
Director of Planning and Development (DPD) of the Local Government. This complies<br />
with the decentralisation policy of the Government of <strong>Mal</strong>awi. On the national level the<br />
Water and Environmental Sanitation (WES) Aid Coordination Sub Group is responsible<br />
for coordinating efforts in the sector. The group, of which ICEIDA is a member, holds<br />
regular meetings chaired by the Principal Secretary responsible for Water and Sanitation,<br />
has proven a valuable forum for knowledge exchange, discussions and coordination. A<br />
special task force is currently working on SWAP for the Water and Sanitation sector.<br />
14
2. <strong>Project</strong> Background and Justification<br />
2.1 Problem to be Addressed.<br />
The Integrated Household Survey 2004-2005 showed that only 66.4% of households have<br />
access to improved water source in <strong>Mal</strong>awi with lower access in rural (63.9%) than in<br />
urban (85.1%) areas. 16 In many villages in <strong>Mal</strong>awi the drinking water source is very<br />
poor, and many are prone to surface water pollution, especially during the rainy season.<br />
The situation is aggravated by low hygiene standards and poor sanitation facilities. This<br />
leads to regular outbreaks of waterborne diseases, e.g. diarrhoea and cholera. It is<br />
generally recognised that access to improved drinking water sources and improved<br />
sanitation is essential to preventing people from getting sick. It is estimated that 73.3% of<br />
households in the whole of Mangochi District have access to an improved water source. 17<br />
Piped water supply is restricted to urban areas in Mangochi (Monkey Bay, Boma and<br />
Namwera). For the people in T/A Nankumba the common sources of water are the lake,<br />
rivers, shallow wells and boreholes.<br />
According to national statistics, approximately 30% of the borehole pumps are not<br />
functioning due to various reasons such as lack of spare parts, vandalism, drying up or<br />
salinity. 18 Many communities are unable to maintain the existing boreholes, dig new<br />
wells or deepen existing ones or upgrade them to improve water quality, due to, limited<br />
financial resources and lack of knowledge on maintenance. The communities have no<br />
option therefore but to rely on contaminated water. In some villages women and children<br />
spend considerable time fetching water from far away sources. In Monkey Bay a number<br />
of cholera outbreaks are reported almost every year.<br />
In Annex 18. 2 shows the number of functioning boreholes and protected shallow wells<br />
as well as the number of pit latrines in the areas of the Monkey Bay health zone.<br />
2.2 Expected End of <strong>Project</strong> Situation<br />
The focus of the project shall be on improving hygiene among the target group,<br />
increasing the sanitation facilities and providing access to potable water supplies. In that<br />
way the <strong>Project</strong> is going to have an impact on the health status of the population together<br />
with agricultural and economical productivity. It is envisaged that at the end of the<br />
project period there will be great improvement in sanitation and access to safe drinking<br />
water within a maximum radius of 500m from the inhabitants’ homes in over 20,000<br />
households (90%) in the Monkey Bay Health Zone.<br />
16 National Statistic Office. 2005. Integrated Household Survey 2004-2005, p. 87.<br />
17 National Statistic Office. 2005. Integrated Household Survey 2004-2005, p. 87.<br />
18 Eríksson and Chola. 2004. Improved Access to Safe Drinking Water and Improved Sanitation in the<br />
Monkey Bay Health Zone, p. 7.<br />
15
2.3 Target Group<br />
The target group for this project is the people in the communities of T/A Nankumba area,<br />
known as Monkey Bay Health Zone. The Monkey Bay Health Zone includes four health<br />
care centres as well as the Monkey Bay Community Hospital.<br />
The target communities of this <strong>Project</strong> will be those rural communities in the project area,<br />
which have inadequate sanitation facilities and insufficient access to safe drinking water,<br />
whether in terms of quantity, quality or distance from home.<br />
2.4 <strong>Project</strong> Site<br />
The majority of the population live along the lakeshore and they mainly depend on<br />
subsistence farming and fishing. The project area is located within the Nankumba<br />
Peninsula on the western part of the South East Arm (SEA) (Figure 1) which falls under<br />
the jurisdiction of Traditional Authority (TA) Nankumba with Group Village Heads<br />
(GVHs) Mwanyama, Chiwalo, Chamba, Nankumba, Kasankha, Mputa, Zimbayuta,<br />
Kapichi, Chembe, Mwalembe and Matekwe.<br />
The project villages include Sumbi I and Madzedze in GVH Mwanyama and Nkope in<br />
Chiwalo<br />
Figure 1 Map of the <strong>Project</strong> Area<br />
There are 98 villages with about 22,762 households and a population of approximately<br />
109,245. The project covers 5 health centres namely Nankumba, <strong>Mal</strong>embo, Nkope,<br />
Nankwali and Monkey Bay with the following population distribution:<br />
16
Health Centre No. of Villages No. of Households Population<br />
Nankumba 22 5,135 30,059<br />
<strong>Mal</strong>embo 22 4,004 17,653<br />
Nkope 23 4,582 24,045<br />
Nankwali 14 1,315 8,732<br />
Monkey Bay 16 6,426 28,756<br />
TOTAL 97 22,762 109,245<br />
(Source: Z. Solomoni, April <strong>2006</strong>)<br />
2.5 Roles and Functions of the Water, Environment and Sanitation<br />
Taskforce (WEST)<br />
The existing Water, Environment and Sanitation Taskforce in Mangochi is comprised of:<br />
the District Director of Planning and Development, the District Water Coordinator, the<br />
Assistant Environmental Health Officer, the District Community Development Officer<br />
and the District Environmental Officer.<br />
The roles and functions of the existing Water, Environment and Sanitation Taskforce<br />
(WEST) for community based Water and Sanitation <strong>Project</strong>s can be summarized as<br />
follows:<br />
• Promoting community identification of demand driven projects.<br />
• Providing staff members to implement the project (CDA, HAS, Water and Sanitation<br />
people)<br />
• Planning and co-ordination of the activities of the Water and Sanitation <strong>Project</strong><br />
Sector.<br />
• Training of Government Field Officers, Village Health and Water Committees,<br />
village communities and artisans on specific issues of water and sanitation.<br />
• Supervision of project implementation and monitoring of the progress.<br />
• Meeting quarterly to discuss progress and make recommendations for improvement. .<br />
The specific tasks of each member of the Taskforce of the <strong>Mal</strong>awian Authorities in<br />
Mangochi are listed in the table below:<br />
17
Institution Title Roles and Functions<br />
District<br />
Assembly<br />
District<br />
Director of<br />
Planning &<br />
Development<br />
(DPD)<br />
• Chairperson of WEST<br />
• Planning and Co-ordination of activities of the Water, Environment and<br />
Sanitation Taskforce<br />
• Providing policy guidelines for the Water and Sanitation activities<br />
• Linking the WATSAN activities to District Assembly and DEC<br />
• Monitoring of progress<br />
Min of<br />
Environmental<br />
Affairs<br />
Community<br />
Development<br />
Min. Of<br />
Health<br />
Min. of<br />
Irrigation and<br />
Water<br />
Development<br />
DEO<br />
District<br />
Environmental<br />
Officer<br />
District<br />
Community<br />
Development<br />
Officer<br />
(DCDO)<br />
District<br />
Assistant<br />
Environmental<br />
Health Officer<br />
(DEHO)<br />
District Water<br />
Coordinator<br />
(DWC)<br />
Water<br />
Monitoring<br />
Assistants<br />
(WMAs)<br />
• Member of WEST.<br />
• Participating in planning workshops.<br />
• Awareness campaign on linkages between water and sanitation project<br />
and environmental issues.<br />
• Environmental Education of communities.<br />
Reporting to DEC.<br />
• Member of WEST.<br />
• Participating in planning workshops.<br />
• Organising communities for self help participation.<br />
• Conducting community needs assessment.<br />
• Conduct awareness campaigns.<br />
• Training of local leaders and committees on leadership and works<br />
organisation.<br />
• Assisting project committees in preparing site specific work schedules.<br />
• Co-ordinating activities of the CDAs.<br />
• Monitoring of progress on sites in terms of gender and self-help<br />
participation.<br />
• Reporting to DEC on a quarterly basis.<br />
• Member of WEST.<br />
• Participating in planning workshops.<br />
• Facilitating community mobilisation and awareness meetings.<br />
• Training HSAs and VHWCs.<br />
• Coordination, Management and Supervision of HSA’s activities.<br />
• Preparing of monthly reports to DHO.<br />
• Monitoring of progress and reporting to WEST and DEC.<br />
• Member of WEST.<br />
• Participating in planning workshops.<br />
• Community awareness and mobilisation.<br />
• Coordination, management and supervision of WMA’s activities.<br />
• Monitoring of borehole pump performance and keeping data.<br />
• CBM Training and Maintenance of borehole pumps.<br />
• Site agents for contractors.<br />
• Reporting to Senior Water Officer at Head Quarters.<br />
• Reporting to DEC.<br />
18
2.6 Cross Cutting Issues for Special Consideration<br />
Water is recorded as one of the basic resources for human beings. Issues of water and<br />
sanitation have a human rights dimension which need special attention. This was<br />
highlighted by the DPD during the strategy formulation workshop in Mangochi.<br />
Gender issues are an integral part of the overall national development agenda in <strong>Mal</strong>awi.<br />
Therefore the overall priority in the MGDS is to mainstream gender in the national<br />
development process to enhance participation of women and men, girls and boys for<br />
sustainable and equitable development.<br />
In the scope of this project it will be necessary to carry out gender analysis with regard to<br />
hygiene, water and sanitation before the project starts in order to integrate the gender<br />
issues into the project management cycle. Other cross-cutting issues will be actively<br />
integrated in the project’s activities including environmental protection as well as<br />
HIV/Aids awareness and prevention.<br />
3. Development Objective<br />
(<strong>Project</strong> Matrix Annex no.18.1)<br />
The overall development objective of this project is to reduce water and sanitation related<br />
diseases in the Monkey Bay Health Zone. This will contribute to improved health<br />
standards of the population of Mangochi. Therefore, the main purpose of this project<br />
shall be to increase access to sustainable safe drinking water and improve sanitation in<br />
the Monkey Bay Health Zone.<br />
This is in line with the Policy of the <strong>Mal</strong>awian Government as can be seen in the new<br />
policy paper: “<strong>Mal</strong>awi Growth and Development Strategy” which provides that <strong>Mal</strong>awi<br />
remains committed to achieving the Millennium Development Goals (MDGs), one of<br />
which is access to clean water and sanitation. 19 In order to achieve the goals there are<br />
several strategies. One of them is integrated rural water supply and participatory hygiene<br />
and sanitation transformation. 20<br />
4. Specific Objectives<br />
The Contracting Parties, ICEIDA and the Government of <strong>Mal</strong>awi (through the Ministry<br />
of Irrigation and Water Development, the Ministry of Women and Child Welfare and the<br />
Ministry of Health in Mangochi District) agree to work towards achieving the following<br />
specific objectives<br />
Specific Objectives:<br />
19 Government of <strong>Mal</strong>awi. 2005. <strong>Mal</strong>awi Growth and Development Strategy, p. 7.<br />
20 Government of <strong>Mal</strong>awi. 2005. <strong>Mal</strong>awi Growth and Development Strategy, p. 60.<br />
19
1. Increasing the number of functioning boreholes in the Monkey Bay Health Zone;<br />
2. Building capacity among staff at district level on Water and Sanitation and the<br />
communities on Community Maintenance of boreholes and pumps by offering<br />
training;<br />
3. Increasing knowledge and information about hygiene and sanitation among the<br />
target group;<br />
4. Increasing numbers of shallow wells in the target area and improve shallow well<br />
protection;<br />
5. Putting to good use 2 natural springs in Mvunguti Village before the end of 2007,<br />
and to build up well functioning Community Based Management system there;<br />
6. Improving the Community Based Management of various water resources by<br />
offering training courses for the target group;<br />
7. Promoting networking and a functional coordination, monitoring and reporting<br />
system between stakeholders.<br />
5. Main Outputs<br />
The Contracting Parties expect the <strong>Project</strong>’s inputs and activities to result in:<br />
1. Up to 100 new boreholes drilled and functioning and 50 boreholes repaired and<br />
civil works on or around those areas done according to national standards by end<br />
of <strong>2010</strong><br />
2. Adequate and properly trained water point committees established and qualified<br />
to maintain boreholes and pumps (committees capable of Community Based<br />
Maintenance and repair work).<br />
3. Adequate and properly trained committees on hygiene and sanitation, that can<br />
train and sensitize the target group.<br />
4. Up to 300 shallow wells protected at household level on a self-help basis.<br />
5. Two natural springs protected and improved for supply of safe drinking water on<br />
a community participatory basis.<br />
6. Committees and leaders trained in Community Based Management<br />
7. A functioning system in place regarding, “Planning, coordination, monitoring<br />
information and reporting system” between stakeholders through DEC and<br />
District Assembly.<br />
6. The <strong>Project</strong> Strategy<br />
The strategy of this project will be to increase the accessibility to safe drinking water and<br />
sanitation and promote better hygiene practices through construction of new boreholes<br />
and rehabilitation of older ones as well as promoting community based management and<br />
conservation principles.<br />
The main emphasis of the project will be on two components:<br />
1. Infrastructure (hardware): Construction of new boreholes and rehabilitation of<br />
older ones.<br />
20
2. Community work and training (software) that will focus on managerial and<br />
maintenance skills, implementation competency, and adoption of technologies.<br />
The project will be implemented in two phases of which the second phase will be<br />
dependent on the success of the first phase. The first phase will take place from <strong>2006</strong> to<br />
<strong>2010</strong> and the second phase will be a possible extension to 2015. The first phase will<br />
incorporate:<br />
• Preparation (surveys and sensitisation meetings in the villages).<br />
• Training of extension staff at district level when needed and training of the local<br />
communities.<br />
• Drilling of up to 100 new boreholes and rehabilitation of 50 major boreholes in<br />
the Monkey Bay Health Zone.<br />
The project’s outputs will be achieved through the following steps:<br />
Surveys<br />
Where data is not currently available it will be necessary to carry out the following<br />
surveys:<br />
(i) Hydro-geological survey.<br />
(ii)<br />
(iii)<br />
Baseline survey on existing boreholes that require major repairs.<br />
Baseline survey and gender analysis with regard to hygiene, water and<br />
sanitation.<br />
Training Courses<br />
Extension staff will be provided with training in water and sanitation issues and the<br />
community members and the local leaders will receive the necessary training to enable<br />
them to take responsibility for the pumps, boreholes and sanitation facilities.<br />
Village Meetings<br />
The implementing team shall hold regular village meetings to listen to the views of the<br />
community members and discuss plans, schedules, strategies and progress. The village<br />
meetings might be in form of group meetings, door-to-door household visits, drama<br />
sessions, water point gatherings and any other gatherings that are convenient for the<br />
target groups.<br />
Demonstrations and Training<br />
Demonstration sanitation facilities of latrines, hand-washing devices, refuse pits and<br />
bathrooms shall be built at strategic houses as examples. The demonstration locations<br />
will be democratically selected at village meetings. The demonstration sanitation<br />
facilities will be used for training the local artisans and HSAs.<br />
Construction and Supervision of Sanitation Facilities<br />
Most sanitation facilities shall be constructed by the owners themselves. The supervision<br />
of the construction will be done by the HSAs. In the eventuality that not enough HSAs<br />
are stationed or available in the area, the project will hire local temporary staff with<br />
qualifications to be trained as HSAs, CDAs, WMAs. These will undergo an “on the job<br />
21
training” while working on the project. An arrangement shall be made with the relevant<br />
Ministry to provide them with formal training.<br />
Water Supply Technologies<br />
The best way to supply safe water in a cost effective and sustainable way is a question,<br />
which is still subject to research and debate. Much faith has been placed on the use of<br />
AFRIDEV hand pumps. These were believed to be village level operation and<br />
maintenance pumps, but as yet the pumps have not proven totally suitable.<br />
Even though the AFRIDEV is termed simple technology, it has proved difficult for many<br />
local communities to maintain and repair the pump; something the number of nonfunctioning<br />
boreholes indicates. However, experience from the GITEC operated<br />
Kalembo Groundwater <strong>Project</strong> (KGP) from 1995 to 1998 with 96 % boreholes working<br />
in 2005 and East Mangochi Rural Water Supply and Sanitation Programme (EMRWSS)<br />
from 1999 to <strong>2006</strong> with 99 % working in <strong>2006</strong> has showed that the AFRIDEV hand<br />
pumps together with a strong emphasis on community participation in all project phases –<br />
planning, implementation and operation, a strong emphasis on creating community<br />
ownership of the boreholes, community training in maintenance and the use of the<br />
demand driven approach to projects, it is possible to achieve a high percentage of<br />
functioning boreholes. 21<br />
This <strong>Project</strong> proposes to support complementary strategy of promoting alternative water<br />
supply techniques while also supporting the rehabilitation and construction of community<br />
boreholes with AFRIDEV pumps.<br />
In addition to borehole water supply other water supply techniques shall be considered,<br />
i.e:<br />
• Digging new wells and upgrading existing shallow wells<br />
• Protecting natural springs<br />
• Pumping water from the lake and purifying water on a trial pilot basis<br />
7. Activities<br />
(See <strong>Project</strong> Activity Plan in Annex 18.5)<br />
To achieve the above outputs a number of activities will have to be undertaken. The<br />
activities outlined below were elaborated during the two-day workshop of stakeholders in<br />
Mangochi in December 2005. More detailed activities and sub-activities will be worked<br />
out by the <strong>Project</strong>’s staff members<br />
1. Drilling and major rehabilitation of boreholes carried out.<br />
1.1 Carrying out a baseline survey on existing boreholes that require major<br />
repairs.<br />
21 Gitec. <strong>2006</strong>. Rural Water Supply and Sanitation <strong>Project</strong>s 1995-<strong>2006</strong>, p. 1-9.<br />
22
1.2 Carrying out project awareness campaigns and organizing community<br />
participation.<br />
1.3 Preparing repair work specifications including Bill of Quantities (BoQs), cost<br />
estimates and Tender documents.<br />
1.4 Tendering out major repair works<br />
1.5 Supervising contractor works<br />
1.6 Carrying out hydro-geological survey when needed.<br />
1.7 Preparing tender documents and calling for tenders<br />
1.8 Supervising contractors and controlling quality<br />
2. Training on Community Based Maintenance and minor repair works on defunct<br />
borehole pumps.<br />
2.1 Collecting baseline data on current boreholes.<br />
2.2 Carrying out training on community based management<br />
2.3 Assisting the community in organizing fund for repairs of pumps.<br />
2.4 Training local pump minders and VHWCs, on minor repairs while carrying<br />
out repairs.<br />
2.5 Conducting monthly village visits while conducting on site training on CBM<br />
and hygiene.<br />
3. Training of staff and Committees in hygiene and sanitation. The staff will train the<br />
target group.<br />
3.1 Training extension staff (trainers) to be able to provide training in the selected<br />
sites/villages.<br />
3.2 Conducting meetings in the villages/sites to explain the project objectives and<br />
strategies.<br />
3.3 Training local voluntary drama groups for awareness campaigns.<br />
3.4 Conducting on the job training of VHWCs on promotion of sanitation<br />
techniques.<br />
3.5 Training extension staff in participatory hygiene and sanitation technique<br />
while selecting sites in the field.<br />
3.6 Supervising adoption of hygiene and sanitation techniques<br />
4. Upgrading of shallow wells and constructions of new where possible.<br />
4.1 Carrying out a survey of existing shallow wells and identifying requirements<br />
of upgrading and where new wells can be constructed.<br />
4.2 Conducting training of HSAs and WMAs on shallow well technology.<br />
4.3 Organizing visit for implementing team to area where shallow wells are<br />
working properly<br />
4.4 Conducting Community sensitization meetings and organizing of local inputs.<br />
4.5 Training local artisans on improved shallow well techniques.<br />
4.6 Supervising construction and handing over completed facilities<br />
4.7 Conducting training on CBM<br />
5. Improving two natural springs on community participatory basis.<br />
23
5.1 Collecting baseline data on the current situation in the villages with natural<br />
springs.<br />
5.2 Preparing technical designs of the spring protection including BOQs and cost<br />
estimates.<br />
5.3 Conducting community organizational meetings.<br />
5.4 Organizing site clearing and collection of local materials.<br />
5.5 Procuring and deliver external materials.<br />
5.6 Organizing builders and supervising construction<br />
5.7 Conducting CBM training<br />
6. Providing CBMT, Community Based Management training courses for extension staff<br />
as needed and for the Communities, leaders and committees that will be responsible for<br />
the supervision and maintenance of boreholes and the new water and sanitation facilities.<br />
6.1 Conducting training of local leaders and committees in community based<br />
administration of projects.<br />
7. Establishing a functioning co-ordination, monitoring and reporting system between<br />
stakeholders through DEC and District Assembly.<br />
7.1 Assessing capacities of partners in terms of planning, co-ordination,<br />
implementation, monitoring and reporting and training needs<br />
7.2 Preparing annual work plans and resource requirement plans<br />
7.3 Conducting co-ordination, monitoring and reporting skills training to WEST<br />
members.<br />
7.4 Supervising and monitoring implementation of projects<br />
7.5 Conducting quarterly WEST Meetings and preparing minutes for<br />
incorporating the results.<br />
8. Main Inputs.<br />
The <strong>Mal</strong>awi Government commits itself to:<br />
1. Provide a number of professional extension staff (CDA, HSA, WMA) in the<br />
project area, and shall ensure timely execution of the project’s activities;<br />
2. Pay salaries of all Government staff on the project;<br />
3. Make necessary provisions and allocations in the Annual Budgets (Public<br />
Investment Plan) from 2007/08 to <strong>2010</strong> for paying allowances and other expenses<br />
for staff from the Ministry of Irrigation and Water Development for supervision<br />
of the <strong>Project</strong> activities in accordance with <strong>Mal</strong>awi Government Rules and<br />
Regulations;<br />
4. Ensure regular and appropriate supervision of extension staff from the Mangochi<br />
District Office;<br />
5. Designate a Government Officer at district level in Mangochi (Director of<br />
Planning or any other appropriate officer) who shall work in close collaboration<br />
with the ICEIDA’s <strong>Project</strong> Manager;<br />
24
6. Ensure that at the end of the <strong>Project</strong> Government will make efforts to employ<br />
additional extension staff who were under the <strong>Project</strong> but on ICEIDA’s payroll.<br />
ICEIDA commits itself to:<br />
1. Provide technical and financial assistance to the <strong>Mal</strong>awi Government as detailed<br />
in the <strong>Project</strong> Description <strong>Document</strong>;<br />
All fees, salaries and operational costs for the <strong>Project</strong> Advisor/<strong>Project</strong> Manager<br />
and ICEIDA’s <strong>Project</strong> - Coordinator shall be paid by ICEIDA in accordance with<br />
ICEIDA’s Rules and Regulations;<br />
2. Procure and fund all relevant utilities (i.e. equipment and materials as well as<br />
vehicles and motor Cycles) that will be used for the implementation of the<br />
<strong>Project</strong>;<br />
3. Cost and provide consultancies to assist in the project implementation as and<br />
when need arises;<br />
4. Provide funds for construction of boreholes and rehabilitation of older ones;<br />
5. Fund and facilitate training at all levels and other capacity building for<br />
extensional staff and communities during the <strong>Project</strong>;<br />
6. Provide support for surveys (boreholes and shallow wells) and other studies found<br />
appropriate to implement the <strong>Project</strong>’s objectives;<br />
7. Pay necessary allowances and transport costs for local staff to attend scheduled<br />
meetings, events or activities related to the delivery of the project activities, as<br />
well as allowances for representatives from relevant Ministries for <strong>Project</strong><br />
meetings. Allowances shall be paid in accordance with ICEIDA’s Rules and<br />
Regulations;<br />
8. Pay salaries of locally hired experts and cover contingency (e.g. transport and<br />
stationary) regarding the <strong>Project</strong>, as found appropriate;<br />
9. Recruit and pay salaries for additional staff, water and health assistants whose<br />
services needed in order to fulfil the Objectives of the <strong>Project</strong>.<br />
Expected contribution by local communities:<br />
1. Provision of locally available materials and labour (e.g. construction of water and<br />
sanitation facilities);<br />
2. Organisation in the villages/sites and participation in finding places for boreholes;<br />
3. Organising of Water Point Committees for implementation of the <strong>Project</strong>;<br />
4. Carrying out local organisational tasks such as collection and delivery of local<br />
construction materials (e.g. sand, stone, water);<br />
5. Providing safe place(s) for storage of construction materials;<br />
6. Reporting regular of the various stages of construction;<br />
7. Assuming ownership and taking full responsibility of management and<br />
maintenance of the water points through the Water Point Committees;<br />
8. Establishing a local fund for maintenance and spare parts of the water and<br />
sanitation infrastructure.<br />
25
A Borehole Users <strong>Project</strong> Agreement will be signed between the <strong>Project</strong> Implementation<br />
Unit and the communities involved in the <strong>Project</strong>. (See draft agreement in Annex no<br />
18.4)<br />
9. Assumptions<br />
The Major Assumptions in this <strong>Project</strong> include:<br />
1. Commitment by the target group, traditional leaders, District Assembly and<br />
Communities to actively participate in the <strong>Project</strong> implementation;<br />
2. Ownership by the target group can be achieved;<br />
3. Borehole pump spare parts available through local entrepreneurs;<br />
4. Water table does not go too low due to natural droughts or environmental<br />
degradation;<br />
5. Water sighting surveys results favorable for borehole drilling and safe drinking<br />
water.<br />
10. Risks and Constraints<br />
1. The possibility of any future political changes either in <strong>Mal</strong>awi or in Iceland that<br />
would negatively influence the current development policy could constitute a risk<br />
for the project.<br />
2. Another substantial risk is the District’s involvement through the demand driven<br />
aspects of the <strong>Project</strong>, because of weak district capacities and their inadequate<br />
funding. The <strong>Project</strong> will address this through strengthening the <strong>Project</strong><br />
management at the regional level through the Mangochi office.<br />
3. The third risk is connected to the second one is that the field staff from the<br />
Ministry of Health and Ministry of Women and Child Development is already<br />
involved in other projects such as the ICEIDA sponsored Health <strong>Project</strong> and<br />
Adult Literacy <strong>Project</strong>.<br />
4. Other notable risks are possible natural disasters beyond human control.<br />
11. Organisation, Administration and Monitoring of the <strong>Project</strong><br />
The Ministry of Finance on behalf of the Government of <strong>Mal</strong>awi will enter into an<br />
agreement with ICEIDA by signing a Memorandum of Understanding (MoU) regarding<br />
the funding, procedures and provision of project experts from Iceland.<br />
<strong>Project</strong> implementation will be a joint responsibility of the Mangochi District Assembly<br />
under the Ministry of Irrigation and Water Development on behalf of the <strong>Mal</strong>awi<br />
government and ICEIDA on behalf of the government of Iceland. This approach<br />
complies with the National Decentralisation Policy that aims at integrating government<br />
agencies at the district and local level into one administrative unit.<br />
26
Figure 2 Organisational hierarchy for <strong>Project</strong> Implementation<br />
<strong>Project</strong> Supervisory Board (PSB)<br />
Principal Secretary of Water and Sanitation<br />
ICEIDA Country Director<br />
PSC-Representatives<br />
Bi-annual<br />
consultation<br />
<strong>Project</strong> Steering Committee (PSC)<br />
District Commissioner Mangochi<br />
District Director of Planning, Mangochi:<br />
ICEIDA <strong>Project</strong> Advisor/<strong>Project</strong> Manager<br />
District Water Coordinator<br />
Environmental Health Officer<br />
District Community Development Officer<br />
District Environmental Officer<br />
PIU-Representatives<br />
3-monthly<br />
review<br />
<strong>Project</strong> Implementation Unit (PIU)<br />
District Director of Planning, Mangochi<br />
ICEIDA <strong>Project</strong> Advisor/<strong>Project</strong> manager<br />
ICEIDA <strong>Project</strong> Coordinator<br />
Desk officer, Water<br />
Desk officer, Health<br />
Daily<br />
implementation<br />
11.1 The <strong>Project</strong> Implementation Unit (PIU) shall constitute the designated Government<br />
Officer at district level (Director of Planning, ICEIDA’s <strong>Project</strong> Manager and all<br />
staff employed for the project (See Annex 18.7). The PIU shall be responsible for the<br />
day-to-day running and implementation of all project activities. The extension<br />
workers of WEST are the Water Monitoring Assistants (WMAs), the Health<br />
Surveillance Assistants (HSAs) and the Community Development Assistants<br />
(CDAs). They work directly with the involved communities, committees and<br />
community leaders and they are the channel that will be used for monitoring and<br />
reporting of project progress from the local level to the top management level. They<br />
are the ones that will work daily with the PIU at the implementation of the <strong>Project</strong>.<br />
27
11.2 The Contracting Parties shall form a “<strong>Project</strong> Steering Committee” (PSC), which<br />
will comprise of various technical Government Officers at district level, namely, The<br />
District Commissioner of Mangochi district, the District Water Officer, the District<br />
Environmental and Health Officer, the Community Development Officer and the<br />
Regional Water Officer. Designated/nominated Government and ICEIDA’s<br />
representatives at the PIU shall also be members of the PSC. The PSC shall be<br />
responsible for monitoring both the general progress of the project and overall<br />
implementation of the activities and making suggestions for corrective measures for<br />
project cycle management.<br />
11.3 The PSC shall meet every three months. The District Commissioner shall be the<br />
Chairperson of the PSC. The Terms of Reference for the PSC are detailed in Annex<br />
no. 18.10 of the <strong>Project</strong> Description <strong>Document</strong>.<br />
11.4 There shall be a <strong>Project</strong> Supervisory Board, comprising mainly of the<br />
representatives of the Contracting Parties at the highest level, namely; the Principal<br />
Secretary responsible for Water and Sanitation, the Principal Secretary for Health,<br />
Principal Secretary for Economic Planning and Development, the Principal Secretary<br />
for Gender and Child Welfare and the Principal Secretary for Local Government, on<br />
the one hand, and ICEIDA’s Country Director on the other. The Water Environment<br />
and Sanitation Task Force (WEST) are also members of the PSC. Members of the<br />
Board reserve the right to incorporate any other officers to the Board, government or<br />
otherwise, in so far as their services and expertise would be so required, as the Board<br />
may deem fit.<br />
11.5 The PSB shall be responsible for monitoring the overall administration and<br />
implementation of the whole project and also for providing policy guidelines to the<br />
contracting parties on the same. The PSB shall meet at least every six-month. The<br />
Principal Secretary responsible for Water and Sanitation shall be the chairperson of<br />
the PSB. Terms of Reference for the PSB are detailed in Annex of the <strong>Project</strong><br />
Description <strong>Document</strong>. Terms of Reference for the PSC are detailed in Annex no.<br />
18.11 of the <strong>Project</strong> Description <strong>Document</strong><br />
11.6 The PIU and PSC shall prepare progress reports every six months which will be<br />
presented at PSB meetings. The PSC shall hold a biannual workshop to prepare for<br />
detailed work-plans and budgets, which shall in turn be, submitted to PSB for<br />
approval.<br />
28
11.7 An annual narrative activity and financial report shall be produced by the PIU which<br />
shall be verted by the PSC and approved by the PSB. Once agreed upon by the<br />
Contracting Parties the report shall be submitted to the Ministry of Finance and<br />
ICEIDA’s head Office in Reykjavik (the Icelandic Government).<br />
12. Indicators and Means of Verification<br />
Appropriate indicators of progress for the <strong>Project</strong> have been developed as shown in the<br />
<strong>Project</strong> Matrix in Annex 18.1<br />
The indicator and means of verification for the overall objective will be the improved<br />
health standard of the population in Monkey bay Health Zone verified with reduced<br />
number of people reported to the Monkey Bay Community Hospital with dysentery and<br />
cholera.<br />
The Indicators and Means of Verification for the Specific Objectives are the following:<br />
1. Up to100 new boreholes, 50 boreholes repaired and civil works done according to<br />
national standards by end of <strong>2010</strong>. Annual progress reports by District Water<br />
Coordinator will give record of the achievements.<br />
2. At least 95% of the boreholes constructed or rehabilitated by the <strong>Project</strong> are<br />
functioning in <strong>2010</strong> and the Water Point Committees have ensured no more than a<br />
week’s waiting time for maintenance and reparation for broken down pumps. The<br />
source of information will be quarterly reports compiled by the District Water<br />
Coordinator (DWC).<br />
3. Use of sanitary, bathroom, hand washing facilities, practiced by over 80% of the<br />
target population by end of <strong>2010</strong>. Quarterly progress reports by the District<br />
Environmental Health Officer (DEHO) will provide information as means of<br />
verification.<br />
4. The indicator will be 300 shallow wells in selected villages in the Monkey Bay<br />
Health Zone by <strong>2010</strong> with well functioning Village Health and Water Committees<br />
(VHWCs). Annual progress reports by the DEHO for Monkey Bay Health Zone<br />
will provide the relevant information on this issue.<br />
5. The indicator will be two natural springs protected and completed with well<br />
functioning Community Based Management (CBM) system in Mvunguti Village<br />
by end of 2007. Annual progress reports by the District Water Coordinator as<br />
well as site visits will be the means of verification.<br />
6. The indicator will be functioning committees and leaders that are responsible for<br />
taking care of the boreholes and sanitation facilities in their villages. Quarterly<br />
progress reports by the District Environmental Health Officer (DEHO) will<br />
provide information as means of verification.<br />
29
7. Annual activity-plans worked out in accordance with the <strong>Project</strong> <strong>Document</strong> and<br />
its skeleton budget approved by the <strong>Project</strong> supervisory Board (PSB) at the<br />
beginning of October each year. Verification will be the completed activity plan.<br />
8. <strong>Project</strong> Progress Monitoring field visits by WEST every three months with reports<br />
to District Executive Committee DEC and ICEIDA will be the verification means.<br />
13. Monitoring, Reporting and Evaluation<br />
The <strong>Project</strong> shall set up a transparent system of monitoring and reporting.<br />
Monitoring involves systematically observing and assessing achievements or progress of<br />
the <strong>Project</strong> activities, based on the <strong>Project</strong> activity plan and the indicators and means of<br />
verification stipulated during the planning phase.<br />
Simple formats will be developed for the collection of data and for monthly and quarterly<br />
monitoring sessions. The extension workers of WEST, the WMAs, HSAs and CDAs will<br />
report every month to the PIU where they provide information about the activities in the<br />
field and their progress as well as existing and potential problems to be solved during<br />
their monthly meetings.<br />
During the quarterly meetings with the PSC the PIU will deliver a written report on the<br />
progress and financial status of the <strong>Project</strong>.<br />
Progress reports for each six-month period shall be prepared by the PIU and PSC and<br />
presented to the PSB meetings for discussions and consideration. The PSC shall hold a<br />
biannual workshop. The first workshop shall be before May and the second no later than<br />
October before the meetings with the PSB where the PSC represents detailed work-plans<br />
and the budget proposal for the next year in accordance with the <strong>Project</strong> <strong>Document</strong> and<br />
the skeleton budget. This shall be submitted biannually to the PSB and the Contracting<br />
Parties for approval.<br />
An annual narrative and financial report shall be produced by the PIU and PSC and<br />
mutually agreed upon by the Contracting Parties at the end of each financial year of the<br />
<strong>Project</strong> and sent to ICEIDA and the Ministry of Finance.<br />
The financial year for the project will run from 1 st January to 31 st December of every<br />
calendar year.<br />
The reporting sequence will follow the reporting organizational chart as seen in Annex no<br />
18.6 and in Annex no 18.8 is the reporting structure.<br />
A mid term external evaluation will be organised during the first quarter of 2008.<br />
An independent evaluation of <strong>Project</strong> activities will be conducted during the last quarter<br />
of the year 2009 by a team of external evaluators. The composition of the evaluation team<br />
30
shall include at least one individual identified by ICEIDA and another identified by the<br />
<strong>Mal</strong>awi Government, as well as other individuals as found appropriate by the Contracting<br />
Parties. On the basis of the evaluation, the Contracting Parties will make a decision on<br />
whether to extend the <strong>Project</strong> period further or prepare the <strong>Project</strong> phase-out.<br />
31
14. Skeleton Budget<br />
The total estimated budget of the <strong>Project</strong> from <strong>2006</strong> to <strong>2010</strong> is US$ 3,275,500 as<br />
indicated in the table below. The ICEIDA contribution amounts to US$ 2,729,500 and the<br />
contribution from the Government of <strong>Mal</strong>awi amounts to US$ 546,000. The cost figures<br />
are indicative estimates only. More detailed estimates will be prepared during the<br />
implementation of the <strong>Project</strong>. Costs will be established on the basis of quotations from<br />
relevant sources and suppliers.<br />
Item no Human resources Funding <strong>2006</strong> 2007 2008 2009 <strong>2010</strong> Total<br />
1 Technical Assistance ICEIDA 0 112.000 112.000 112.000 112.000 448.000<br />
2 Short Term Consultancy ICEIDA 31.400 40.000 40.000 30.000 17.000 158.400<br />
3<br />
4<br />
Local Technical<br />
Staff<br />
ICEIDA 14.400 14.400 14.400 14.400 14.400 72.000<br />
GOM 0 60.000 70.000 80.000 80.000 290.000<br />
Local Office & ICEIDA 4.400 10.800 10.800 10.800 10.800 47.600<br />
Management Staff GOM 0 4.000 4.000 4.000 4.000 16.000<br />
Total 50.200 241.200 251.200 251.200 238.200 1.032.000<br />
Item no Operation Cost Funding <strong>2006</strong> 2007 2008 2009 <strong>2010</strong> Total<br />
5 <strong>Project</strong> Office Administration Costs ICEIDA 6.500 10.400 10.400 10.400 10.400 48.100<br />
6 Field Operation ICEIDA 4.500 18.000 18.000 18.000 18.000 76.500<br />
6 Support GOM 0 40.000 40.000 40.000 40.000 160.000<br />
7,1 Vehicles and motorcycles ICEIDA 10.400 30.000 30.000 30.000 30.000 130.400<br />
Total 21.400 98.400 98.400 98.400 98.400 415.000<br />
Item no Equipment, materials Funding <strong>2006</strong> 2007 2008 2009 <strong>2010</strong> Total<br />
7,2 Vehicles and motorcycles ICEIDA 48.000 0 0 0 0 48.000<br />
8,1 Water and Santitation Materials ICEIDA 187.000 316.600 316.600 316.600 316.600 1.453.400<br />
8,2 Materials for training ICEIDA 13.500 0 0 0 0 13.500<br />
8,3 Office Equipment ICEIDA 13.500 0 0 0 0 13.500<br />
Total 262.000 316.600 316.600 316.600 316.600 1.528.400<br />
Item no Training Funding <strong>2006</strong> 2007 2008 2009 <strong>2010</strong> Total<br />
9,1<br />
9,2<br />
Training in<br />
Communities<br />
ICEIDA 28.700 16.400 16.400 16.400 16.400 94.300<br />
GOM 0 15.000 15.000 15.000 15.000 60.000<br />
Training of ICEIDA 11.400 28.600 28.600 28.600 28.600 125.800<br />
staff GOM 0 5.000 5.000 5.000 5.000 20.000<br />
Total 40.100 65.000 65.000 65.000 65.000 300.100<br />
Budget summay<br />
Human resources<br />
Operation Cost<br />
Equipment, materials<br />
Training<br />
Total<br />
<strong>2006</strong> 2007 2008 2009 <strong>2010</strong> Total<br />
50.200 241.200 251.200 251.200 238.200 1.032.000<br />
21.400 98.400 98.400 98.400 98.400 415.000<br />
262.000 316.600 316.600 316.600 316.600 1.528.400<br />
40.100 65.000 65.000 65.000 65.000 300.100<br />
373.700 721.200 731.200 731.200 718.200 3.275.500<br />
Total Funding from ICEIDA 373.700 597.200 597.200 587.200 574.200 2.729.500<br />
Total Funding from GOM 0 124.000 134.000 144.000 144.000 546.000<br />
Overall Total Budget 373.700 721.200 731.200 731.200 718.200 3.275.500<br />
32
15. Disbursement of Funds, Accounting and Auditing<br />
Disbursement of funds from ICEIDA<br />
The ICEIDA <strong>Project</strong> Advisor/<strong>Project</strong> Manager and the ICEIDA Country Director will be<br />
responsible for the disbursement of funds from ICEIDA to the <strong>Project</strong>. The funds will be<br />
provided in a timely manner and in accordance with scheduled and approved <strong>Project</strong><br />
Activity Plans. The <strong>Project</strong> Advisor/<strong>Project</strong> Manager shall, with assistance from the<br />
Monkey Bay based ICEIDA accountant when needed, account for the <strong>Project</strong><br />
expenditures in accordance with ICEIDA and Icelandic Government requirements.<br />
The Icelandic National Audit Office will audit the <strong>Project</strong> funds provided by ICEIDA<br />
annually.<br />
The District Director of Planning will be responsible for accounting for <strong>Project</strong><br />
expenditure of funds provided by GOM in accordance with GOM requirements.<br />
Details for the annual financial report will be prepared by the PIU for approval by the<br />
PSB.<br />
GOM and ICEIDA will internally and separately audit each <strong>Project</strong> accounts as stated<br />
above, unless either party requests an external auditor of all the project funds. In case of<br />
such a request, the party requesting the audit will be responsible for the cost of the audit.<br />
The final audited accounts for the <strong>Project</strong> shall be available for examination and approval<br />
by GOM and ICEIDA no later than three months after the closing date of the <strong>Project</strong>.<br />
16. <strong>Project</strong> Implementation Plan<br />
The implementation of the first phase of the project will start in <strong>2006</strong> and will be<br />
concluded at the end of December <strong>2010</strong>. The activities of the project are outlined in<br />
Annex no. 18.5<br />
The first year will focus on preparatory issues such as a survey of the functionality of the<br />
existing water sources, capacities of executing partners, hydro-geological surveys and<br />
gender analysis.<br />
The following years will focus more on training of the implementing teams and the<br />
implementation of activities (construction and rehabilitation of boreholes).<br />
A mid term external evaluation will be organised during the first quarter of 2008.<br />
An independent evaluation of the <strong>Project</strong> activities will be conducted during the last<br />
quarter of the year 2009 by a team of external evaluators. The composition of the team<br />
shall include at least one individual identified by ICEIDA and another one identified by<br />
the <strong>Mal</strong>awian Authorities as well as other individuals as found appropriate. On the basis<br />
of the evaluation, the Contracting Parties will make a decision on whether to extend the<br />
<strong>Project</strong> period further or prepare the <strong>Project</strong> phase-out.<br />
33
17. References<br />
Eiríksson, Guðni Magnús and Richard Chola. 2004. Improved Access to Safe Drinking<br />
Water and Improved Sanitation in the Monkey Bay Health Zone. Reykjavík: 2004.<br />
Gitec. <strong>2006</strong>. Rural Water Supply and Sanitation <strong>Project</strong>s 1995-<strong>2006</strong>. Paper presented to<br />
WES meeting 19 th July <strong>2006</strong>.<br />
Government of <strong>Mal</strong>awi. 2005. <strong>Mal</strong>awi Growth and Development Strategy. Volume 1.<br />
First Draft. Lilongwe: Government of <strong>Mal</strong>awi.<br />
Government of <strong>Mal</strong>awi. 2005. <strong>Mal</strong>awi Growth and Development Strategy. Volume 2.<br />
First Draft. Lilongwe: Government of <strong>Mal</strong>awi.<br />
UNDP. 2005. Human Development Report 2005. New York: UNDP.<br />
National Statistic Office. 2005. Integrated Household Survey 2004-2005. Zomba:<br />
National Statistic Office.<br />
Solomoni, Zacharia. April <strong>2006</strong>.<br />
34
Annex 18.1 Logical Framework Matrix (LFWM) for the <strong>Project</strong><br />
Annex 18.1 <strong>Project</strong> Matrix for Water and Sanitation <strong>Project</strong> for<br />
Monkey Bay Health Zone (H. Z.)<br />
Development Objective Indicators Risks/external factors<br />
The overall developm. objective Improved health standards of the Changes of Policy and the<br />
of this project is to reduce water population in M.B health Zone economical situation in<br />
and sanitation related diseases Reduced number of people <strong>Mal</strong>awi and/or Iceland<br />
in the M.B health Zone<br />
reported to hospital with<br />
dysentery, cholera…<br />
Specific Objectives Indicators Risks/external factors<br />
1. To increase the number of Functioning boreholes used by<br />
boreholes in the M.B H. Zone the target group in the M.B.H.Z. Lack of qualified companies.<br />
2.To build up capacity among Maintained Boreh. At least<br />
the communities in 95% of the boreh. and pumps Borehole pump spare parts<br />
maintenance of boreholes and are attended to within a week not available through local<br />
pumps. through self organisation of the entrepreneurs.<br />
committees.<br />
3. To increase knowledge in Use of sanitary, bathroom, hand Lack of interest among the<br />
hygiene and sanitation washing facilities practiced by target group/difficulties in<br />
among the target group over 80% of the target communication within the area<br />
population by end of <strong>2010</strong><br />
4. To increase numbers 300 shallow wells using variety<br />
of shallow<br />
of appropriate pumps in<br />
wells and improve protection selected villages in M.B. H.Z<br />
by <strong>2010</strong> with well functioning<br />
5.Put to use 2 natural springs in VHWCs<br />
Mvunguti Village before the Two natural springs protection<br />
end of 2007<br />
completed with well functioning<br />
CBM in Mvunguti Village<br />
by end of 2007<br />
6. To improve Community based Responsibility in the villages<br />
Management<br />
for boreholes and latrines<br />
7.To establish functional co- Annual work-plans ready at the Lack of motivation of staff<br />
ordination, monitoring and beginning of each year. from implementing institutions.<br />
reporting system between stake- Monitoring field visits by WEST<br />
holders<br />
every 3 months followed by<br />
reports<br />
Main Outputs Indicators Risks/external factors<br />
1. 100 new boreholes drilled and Functioning boreholes used by<br />
50 major borehole repairs the target group in the M.B.H.Z.<br />
by end of 210<br />
Same as above.<br />
2. Adequate and properly Maintained Boreh. At least<br />
trained water point committees 90% of the boreh. and pumps<br />
are attended to within a week<br />
35
through self organisation of the<br />
committees<br />
3. Adequate and properly Use of sanitary, bathroom, hand<br />
trained hygiene, sanitation washing facilities practiced by<br />
over 80% of the target<br />
committees that are<br />
population<br />
capable of running training by end of <strong>2010</strong><br />
courses for the target group.<br />
4. Improved use of shallow<br />
wells<br />
300 shallow wells in selected<br />
and protection at households villages in M.B. H.Z by <strong>2010</strong><br />
level<br />
with well functioning VHWCs<br />
5. Two natural springs protected<br />
and improved for supply of safe Two natural springs protection<br />
drinking water on a community completed with well functioning<br />
participatory basis<br />
CBM in Mvunguti Village<br />
by end of 2007<br />
6. Trained Committees and Committees and leader<br />
leaders in Community<br />
take responsibility for boreholes<br />
Based Management<br />
and latrines.<br />
7. Planning, co-ordination, Annual work-plans approved<br />
monitoring information and by ICEIDA at the beginning of<br />
reporting system established each year. Monitoring field<br />
visits by WEST every 3 months<br />
followed by reports<br />
Main activities Main inputs Risks/external factors<br />
1. Drilling and major rehabilitat.<br />
of boreholes carried out.<br />
2. Training of water points<br />
Committees in maintenance<br />
of broken boreholes pumps Funds and commodities Lack of extension workers<br />
3. Training of staff and Technical assistance<br />
committees in hygiene and Consultants Human resource management<br />
sanitation, that will train the Training<br />
target group.<br />
4. Upgrading of shallow wells<br />
and constructions of new where<br />
possible.<br />
5. Improve two natural springs<br />
on a community participatory<br />
basis.<br />
6. Provide training in CB<br />
Management for fieldworker<br />
committees and communities<br />
6. Establishment of functioning<br />
Co-ordination, monitoring and<br />
reporting system between<br />
stakeholders.<br />
36
Annex 18.2 Numbers of Boreholes and Latrines in the Monkey Bay Health<br />
Zone<br />
Source: The report from Dec 2004 by G.M.Eiríksson and R. Chola “Improved Access to<br />
Safe Drinking water and improved Sanitation in the Monkey Bay Health Zone”<br />
If there is to be one borehole for every 60 households there is a need for 355 boreholes, a<br />
shortage of 172. Only in Nankwali is the number of households per. borehole less than<br />
60.<br />
Table 1. The number of functioning boreholes and protected shallow wells in the areas<br />
of the Monkey Bay health zone.<br />
Population No. Of Boreholes Protected Taps People Households/<br />
Households functioning shallow /communal Accessible Boreholes<br />
Wells taps<br />
Health care<br />
Nankumba 30059 5135 38 42 0 - 135<br />
<strong>Mal</strong>embo 17969 4084 26 0 0 5528 157<br />
Mkope 24050 4134 41 0 31 11365 101<br />
Nankhali 7393 1315 26 1 0 - 51<br />
Monkey Bay 28306 6648 52 0 8 7664 128<br />
Total 107777 21316 183 43 39 - 116<br />
Very few households in the Monkey Bay area have lined pit latrines, and around 20.000<br />
are needed<br />
Table 2. The number of ordinary pit latrines is far lower than the number of households<br />
in all the areas in the Monkey Bay health zone. Lined pit latrines with a dome slab are<br />
not common (based on data in Appendix 3).<br />
Population No. Of Ordinary Latrines With<br />
Households Pit latrines Dome Slabs<br />
Health care<br />
Nankumba 30059 5135 3612 45<br />
<strong>Mal</strong>embo 17969 4084 2320 0<br />
Mkope 24050 4134 1287 109<br />
Nankhali 7393 1315 708 43<br />
Monkey Bay 28306 6648 2657 867<br />
Total 107777 21316 10584 1064<br />
37
Annex 18.3 Terms of Reference for the ICEIDA <strong>Project</strong> Advisor<br />
Terms of Reference for the Advisor in the ICEIDA supported Water and Sanitation<br />
<strong>Project</strong>.<br />
The Advisor is an employee of ICEIDA and will carry out his/her duties in accordance<br />
with ICEIDA rules and regulations as well as the employment contract with ICEIDA.<br />
He/she will join the Water and Sanitation <strong>Project</strong> as an Advisor and be resident in the<br />
Monkey Bay area. He/she shall have the responsibility to support and facilitate activities<br />
in the <strong>Project</strong> as detailed in the <strong>Project</strong> <strong>Document</strong>. The Advisor will be working with the<br />
Ministry of Irrigation and Water Development in close collaboration with the Ministries<br />
of Health and Women & Child Development.<br />
The Advisor will be directly reporting to the ICEIDA Country Director.<br />
Required Qualifications:<br />
The Advisor shall be a qualified Engineer or Civil Engineer with at least three years<br />
professional working experience, preferable in water and sanitation or similar projects.<br />
Working experience in management is preferable, particularly in developing countries.<br />
The following shall be the responsibilities of the <strong>Project</strong> Advisor:<br />
• Supporting and assisting the Water Environment and Sanitation Task Force<br />
(WEST) in the day-to-day implementation and monitoring of the <strong>Project</strong>’s<br />
activities.<br />
• Ensuring efficient channelling of ICEIDA funds, goods and services needed<br />
for smooth day-to-day implementation of the <strong>Project</strong>, according to the budget<br />
and activity plan and ensuring that such funds, goods and services are<br />
accounted for and audited to the standards of ICEIDA<br />
• Facilitating and participating in the organisation of training that is needed for<br />
proper implementation of the <strong>Project</strong> as detailed in the <strong>Project</strong> Description<br />
<strong>Document</strong>.<br />
• Facilitating and organising baseline surveys as required by the <strong>Project</strong>.<br />
• Providing technical guidance on technologies and techniques to be employed<br />
by the <strong>Project</strong>.<br />
• Supervising contractors and consultants as per terms of references and<br />
contracts.<br />
• Working in close co-operation with District Director of Planning.<br />
• Facilitating and organising monthly meetings for the <strong>Project</strong> Implementation<br />
Unit team.<br />
• Attending and actively participating in meetings held by the <strong>Project</strong><br />
Supervisory Board, and the <strong>Project</strong> Steering Committee (whenever required).<br />
• Providing assistance to the WEST in preparations of annual <strong>Project</strong> budgets<br />
and plans of action, which will translate the <strong>Project</strong> Description <strong>Document</strong><br />
38
into time and activity schedule. The schedule will be due for approval by the<br />
PSB in October each year.<br />
• Preparing, together with the WEST, annual work plans, quarterly work<br />
schedules and respective budgets.<br />
• Preparing progress reports in cooperation with the WEST.<br />
ICEIDA Expects the Adviser to:<br />
• Actively participate in planning, budgeting and reporting to the administrative body<br />
of the Water and Sanitation <strong>Project</strong>.<br />
• In all the activities, be guided by the <strong>Project</strong> Description <strong>Document</strong> and in cases of<br />
weaknesses or difficulties in implementation to report the said flaws and difficulties<br />
as soon as possible.<br />
• In all human relations, show respect and work towards good team spirit and<br />
consensus at all levels. In case of difficulties report to the Country Director.<br />
39
Annex 18.4 Draft <strong>Project</strong> Agreement with Communities.<br />
Draft Borehole Users <strong>Project</strong> Agreement<br />
This agreement is entered into by the <strong>Project</strong> Implementation Unit on behalf of the<br />
<strong>Project</strong>, with the Village Headman and the Chairperson of Water Point Committee on<br />
behalf of the people of ………………Village (borehole users).<br />
A<br />
(i)<br />
We, .................................... Village Headman and ................................ Water<br />
Point Committee Chairperson of ……………… Village, on behalf of the<br />
BOREHOLE USERS SAY AS FOLLOWS:<br />
We have discussed with the community the information provided by the <strong>Project</strong><br />
and that the community understands the conditions applicable for a new borehole<br />
or the rehabilitation of an old borehole. The people understand that this is a<br />
community-based project and that it will take the lead in all decisions. In order to<br />
ensure an adequate supply of water and the economical operation of the hand<br />
pump, the number of households making the application shall be ………………..<br />
We understand that mere application for a borehole does not guarantee<br />
acceptance.<br />
(ii)<br />
We certify that these households have applied for:<br />
o If there is an existing borehole, an evaluation for the possibility for its<br />
rehabilitation; or<br />
o Construction of a new borehole.<br />
o Improvement of household sanitation.<br />
o Improvement of health education.<br />
(iii) We agree that:<br />
1. We shall form a democratically elected and gender balanced Water Point<br />
Committee (attached list of members).<br />
2. If a new borehole is to be constructed, we shall contribute K3000 to show<br />
commitment in participating in the <strong>Project</strong>, before the borehole is sited. Once<br />
handed over, the contribution shall not be refunded.<br />
3. If the <strong>Project</strong> shall determine that an existing borehole within the community can<br />
be rehabilitated, the contribution shall then be K2000.<br />
4. We shall participate actively and provide leadership in all phases of <strong>Project</strong><br />
implementation.<br />
5. We shall participate in the improvement of sanitation facilities at each household<br />
by constructing a pit latrine with sanplat, hand-washing, bath shelter, clothes line,<br />
rubbish pit and dish rack.<br />
6. We shall participate in improving the health status of the people by learning about<br />
relevant disease transmission routes and how to prevent diseases.<br />
7. We shall help select and clear the site for the borehole and clear access roads.<br />
40
8. We shall provide security for the plant and equipment during construction.<br />
9. We shall monitor borehole drilling and civil works contractors.<br />
10. We shall construct a soak away pit according to <strong>Project</strong> specifications, including<br />
the provision of materials to construct a fence and the supply of banana saplings.<br />
11. We shall participate in community mobilisation and training events without<br />
expecting allowances from the <strong>Project</strong>.<br />
12. We shall assume ownership and take full responsibility of management and<br />
maintenance of the hand pump and the surroundings.<br />
13. We shall draw up and enforce rules and regulations regarding the care and<br />
maintenance of the borehole.<br />
B<br />
The project shall provide the following:<br />
1. Technical expertise to suggest the most promising site, taking into account the<br />
population distribution, other adjacent boreholes, and issues which can affect<br />
sanitation.<br />
2. Construct or rehabilitate the borehole, build the apron, drain and wash slab.<br />
3. Expertise, skilled labour and materials for the construction or rehabilitation of the<br />
borehole, apron, pump stand and wash slab.<br />
4. Afridev hand pump.<br />
5. Training in organisation, leadership, financial management, hygiene education,<br />
hand pump operation and maintenance.<br />
6. A sanplat to qualifying households.<br />
In witness thereof the parties hereto agree on the above terms of the agreement, and<br />
have appended their signatures as follows:<br />
On behalf of Pump Users<br />
Signed…………………………<br />
(Village Headman)<br />
Signed…………………………..<br />
(Chairman of Water Point Committee)<br />
On behalf of <strong>Project</strong><br />
Signed………………………..<br />
Designation…………………..<br />
ICEIDA <strong>Project</strong> Advisor<br />
Date…………………..<br />
Date………………….<br />
41
Annex 18.5 <strong>Project</strong> Implementation Plan<br />
Water and Sanitation <strong>Project</strong> for Monkey Bay Health Zone<br />
Activity: 1<br />
Drilling and major rehabilitation of boreholes carried out<br />
Up to 100 new boreholes & up to 50 major borehole repairs by end of <strong>2010</strong>.<br />
Activities Indicators 06 07 08 09 10<br />
1.1 Carry out a baseline survey on existing boreholes Analysis of data on locations type of damage, x x<br />
that require major repairs.<br />
required parts and cost of rehabilitation.<br />
1.2 Carry out project awareness campaigns and At least one maintenance team of 5 people x<br />
organize community participation.<br />
per village.<br />
1.3 Prepare repair work specifications including BOQ<br />
and cost estimates and Tender documents.<br />
Tender documents according to government<br />
specifications.<br />
x<br />
1.4 Tender out major repair works. At least one tender per year x<br />
1.5 Supervise contractor works Contractors to be paid when work is<br />
x x x x<br />
completed and certified correct.<br />
1.6 Carry out hydro-geological survey when needed<br />
and select sites for new boreholes.<br />
A total of 100 sites until <strong>2010</strong> x x x x<br />
1.7 Prepare tender documents and tender out and At least one tender doc per year. x x x x<br />
prepare documents.<br />
1.8 Supervise contractors and control quality 100 boreholes producing safe drinking water<br />
by <strong>2010</strong>.<br />
x x x x<br />
Activity: 2. Training on Community Based Maintenance and minor repair works on defunct borehole<br />
pumps.<br />
100 new boreholes and 50 Boreholes with well functioning and water point committees qualified to maintain boreholes<br />
Activities Indicators 06 07 08 09 10<br />
2.1 Collect baseline data on current boreholes. Analysis of data of status including, type<br />
of fault, parts required, number of users.<br />
2.2 Carry out training in community based management At least one drama performance per<br />
village.<br />
x<br />
x<br />
x x x x x<br />
2.3. Assist the community in organizing fund for repairs of<br />
pumps<br />
2.4 Train local pump minders and VHWCs, on minor repairs<br />
while carrying out repairs<br />
2.5 Conduct monthly village visits while conducting on site<br />
training on CBM and hygiene.<br />
Communities contribute to the spare<br />
parts costs in accordance with contract.<br />
At least one CBM training conducted per<br />
village<br />
Each borehole water point visit at least<br />
once every 3 months.<br />
x x x x x<br />
x x x x x<br />
x x x x x<br />
42
Activity: 3 Training of staff and Committees in Hygiene and sanitation. The staff will train the target<br />
group.<br />
Over 20000 households in Monkey Bay Health Zone adopt and use improved sanitation facilities by <strong>2010</strong><br />
Activities Indicators 06 07 08 09 10<br />
3.1 Train extension staff (trainers) to be able to provide<br />
training in the villages<br />
20 trained and qualified by end of <strong>2006</strong>.<br />
40 trained and qualified by end of 2007<br />
40 trained and qualified by end of 2008<br />
x x x x<br />
3.2 Conduct meetings in the villages to explain the<br />
project objectives and strategies<br />
10 villages in year one and additional 30<br />
villages every year with a functional<br />
VHWC.<br />
x x x x<br />
3.3 Train local voluntary drama groups for awareness At least one drama group per health<br />
campaigns<br />
centre.<br />
3.4 Conduct training of VHWCs on sanitation techniques 260 VHWCs qualified to lead others by<br />
<strong>2010</strong>.<br />
x<br />
x<br />
x x x x x<br />
3.5 Train extension staff in participatory hygiene and<br />
sanitation technique while selecting sites in the field.<br />
20 Qualified to train others by end of<br />
<strong>2006</strong>.<br />
40 Qualified to train others by end of<br />
2007<br />
40 Qualified to train others by end of<br />
2008<br />
x x x x<br />
3.6x Supervision of adoption of hygiene and sanitation<br />
techniques.<br />
20 000 households with toilets and hand<br />
washing facilities by end of <strong>2010</strong>.<br />
x x x x X<br />
.<br />
43
Activity : 4 Upgrading of Shallow wells and constructions of new where possible<br />
300 Shallow wells in selected villages in Monkey Bay Health Zone by <strong>2010</strong> with well functioning VHWCs.<br />
Activities Indicators 06 07 08 09 10<br />
4.1 Carry out a survey of existing shallow wells and<br />
identify requirements of upgrading and where<br />
new well can be constructed.<br />
All existing wells on data base specifying<br />
location, number of users, status, and<br />
requirements.<br />
x<br />
x<br />
4.2 Conduct training of HSAs and WMAs on<br />
shallow well technology.<br />
3 WMAs and 16 H.S.A qualified to supervise<br />
shallow well construction and maintenance.<br />
x<br />
x<br />
4.3 Organise visit for implementing team to area<br />
where shallow wells are working properly<br />
At least one visit to 3 successful projects<br />
within <strong>Mal</strong>awi.<br />
x<br />
x<br />
4.4 Conduct Community sensitization meetings<br />
and organisation of local inputs.<br />
At least one meeting in each participating<br />
village<br />
x x x<br />
4.5 Train local artisans on improved shallow well<br />
techniques.<br />
4.6 Supervise construction and handover<br />
completed facilities.<br />
At least 2 builders per village where shallow<br />
wells are in demand.<br />
x x x<br />
300 shallow wells completed by <strong>2010</strong> x x x x<br />
4.7 Conduct training on CBM Each water point with a functioning VHWC. x x x<br />
44
Activity : 5 Improve two natural springs protected and improved for supply of safe drinking<br />
water on a community participatory basis.<br />
2 natural springs protection completed with well functioning CBM system in Mvunguti Village by end of 2007.<br />
Activities Indicators 06 07 08 09 10<br />
5.1 Collect baseline data on the current situation<br />
in the villages with natural springs.<br />
Data analysis of locations of springs their<br />
water<br />
x<br />
x<br />
5.2 Prepare technical designs of the spring<br />
protection including BOQs and cost estimates.<br />
Layout drawings, construction designs<br />
and cost estimates.<br />
x<br />
5.3 Conduct community organizational meetings. At least two meetings per village with a<br />
spring to be protected.<br />
x<br />
5.4 Organise site clearing and collection of local<br />
materials.<br />
Local materials of crashed stone and<br />
construction sand and stones collected<br />
in adequate quantities.<br />
x<br />
5.5 Procure and deliver external materials. All materials like cement and pipes<br />
delivered on time.<br />
x<br />
5.6 Organise builders and supervise<br />
construction.<br />
Preferably a local builder or from<br />
neighbouring village.<br />
x<br />
5.7 Conduct CBM training At least 5 people trained on<br />
maintenance.<br />
x<br />
Activity : 6. Provide CBM training courses for extension staff as needed and for the<br />
Communities, leaders and committees that will be responsible for the supervision and<br />
maintenance of boreholes and the new water and sanitation facilities.<br />
Activities Indicators 06 07 08 09 10<br />
6.1 Conduct training of local leaders and<br />
committees in community based administration of<br />
projects.<br />
2 leaders selected democratically and<br />
trained to take leadership for projects<br />
x x x x<br />
45
Activity: 7 Establish a functioning co-ordination, monitoring and reporting system between<br />
stakeholders through DEC and District Assembly.<br />
Annual work-plans prepared. <strong>Project</strong> Progress Monitoring field visits by WEST every 3 months with reports.<br />
Activities Indicators 06 07 08 09 10<br />
7.1 Assess capacities of partners in terms of<br />
planning, co-ordination, implementation,<br />
monitoring and reporting and training needs<br />
7.2 Prepare annual work plans and resource<br />
requirement cost plans<br />
7.3 Conduct co-ordination, monitoring and<br />
reporting skills training to WEST members<br />
Report on status of implementing<br />
CPs<br />
Planning document for DEC and<br />
ICEIDA<br />
One training course for WEST<br />
Chairpersons & WEST members<br />
x<br />
x x x x x<br />
x x x x x<br />
7.4 Supervise and monitor implementation of<br />
projects<br />
Monthly monitoring reports x x x x x<br />
7.5 Conduct quarterly WEST Meetings and<br />
minute results<br />
Resolutions of WEST meetings<br />
implemented as per schedule<br />
x x x x x<br />
46
Annex 18.6 Organogram/organisational Chart<br />
Figure 3 organisational hierarchies for <strong>Project</strong> Implementation<br />
<strong>Project</strong> Supervisory Board (PSB)<br />
Principal Secretary of Water and Sanitation<br />
Principal Secretary for Health<br />
Principal Secretary for Gender and Child Welfare<br />
Principal Secretary for Local Government<br />
Principal Secretary for Economic Planning and Development<br />
ICEIDA Country Director<br />
Bi-annual<br />
consultation<br />
<strong>Project</strong> Steering Committee (PSC)<br />
District Commissioner Mangochi ;<br />
District Water Officer, Mangochi;<br />
District Environmental & Heath Officer;<br />
Community Development Officer;<br />
Regional Water Officer, Blantyre<br />
ICEIDA <strong>Project</strong> Advisor/<strong>Project</strong> Manager<br />
3-monthly<br />
review<br />
PIU-Representatives<br />
<strong>Project</strong> Implementation Unit (PIU)<br />
District Director of Planning, Mangochi<br />
ICEIDA <strong>Project</strong> Advisor/<strong>Project</strong> manager<br />
ICEIDA <strong>Project</strong> Coordinator<br />
Desk officer, Water<br />
Desk officer, Health<br />
Daily<br />
implementation<br />
47
Annex 18.7 ICEIDA’s Implementation Unit.<br />
ICEIDA’s Implementation Unit<br />
<strong>Project</strong> Manager/<br />
Advisor<br />
<strong>Project</strong> Coordinator<br />
Software<br />
(training and community work)<br />
Hardware<br />
(drilling)<br />
Field worker team leader<br />
Site inspectors<br />
Consultancy<br />
Fieldworkers<br />
Contractors<br />
48
Annex 18.8 <strong>Project</strong> Reporting Structure<br />
<strong>Project</strong> Supervisory Board PSB<br />
<strong>Project</strong> Steering Committee PSC<br />
<strong>Project</strong> Implementation Unit PIU<br />
Extension workers<br />
1. The extension workers shall make monthly reports of field activities, which will<br />
be presented at PIU meetings.<br />
2. PIU and PSC meet quarterly and PIU deliver a written report on the progress and<br />
the financial status of the <strong>Project</strong>.<br />
3. The PIU and the PSC shall prepare joint reports every six months which shall be<br />
presented at PSB meetings for discussions and considerations.<br />
49
Annex 18.9 Terms of Reference for the <strong>Project</strong> Steering Committee (PSC)<br />
A <strong>Project</strong> Steering Committee shall be established to administer the <strong>Project</strong> and<br />
coordinate all its activities. Its composition and Terms of Reference are as follows.<br />
A. PSC Members<br />
1. District Commissioner Mangochi – Chairperson<br />
2. Director of Planning<br />
3. District Water Officer, Mangochi<br />
4. District Environmental and Health Officer, Mangochi<br />
5. Community Development Officer, Mangochi<br />
6. Regional Water Officer, Blantyre<br />
7. ICEIDA <strong>Project</strong> Advisor/<strong>Project</strong> Manager<br />
8. Representatives of PIU<br />
B. The PSC shall:<br />
• Meet every third month to administer and coordinate all <strong>Project</strong> activities<br />
according to drawn up work plan.<br />
• Prepare and submit annual and semi-annual Plans of Action and budgets for the<br />
approval of the <strong>Project</strong> Supervisory Board (PSB).<br />
• Prepare and submit half-yearly technical and financial reports of the <strong>Project</strong><br />
Components.<br />
• Keep records of agenda items and minutes of meetings and decisions taken related<br />
to <strong>Project</strong> implementation that have to be taken in mutual agreement among the<br />
PIU members.<br />
50
Annex 18.10<br />
Terms of Reference for the <strong>Project</strong> Supervisory Board (PSB)<br />
A PSB shall be set up to be responsible for the overall monitoring <strong>Project</strong> progress and<br />
make decisions for corrective action and <strong>Project</strong> cycle management.<br />
A. Composition of the PSB<br />
1. Principal Secretary responsible for Water and Sanitation;<br />
2. Principal Secretary for Health;<br />
3. Principal Secretary for Economic Planning and Development;<br />
4. Principal Secretary for Gender and Child Welfare and<br />
5. Principal Secretary for Local Government; and<br />
6. ICEIDA’s Country Director<br />
Members of the Board reserve the right to incorporate any other officers to the Board,<br />
government or otherwise, in so far as their services and expertise would be so required, as<br />
the Board may deem fit.<br />
B. The PSB Shall:<br />
• Meet on a bi-annual basis to review progress and monitor implementation of the<br />
<strong>Project</strong> according to <strong>Project</strong> Implementation Plan (PIP/Activity plan and <strong>Project</strong><br />
<strong>Document</strong>.<br />
• Review annual and semi-annual Plans of Action and a detailed budget Prepared<br />
by PSC for approval of the GOM and ICEIDA. The approved budget shall be<br />
submitted to ICEIDA for final approval no later than 1 st November each year.<br />
• Review all technical and financial reports from the PSC and submit them to the<br />
Contracting Parties for approval.<br />
• Scrutinise all account books of the <strong>Project</strong> yearly and provide guidance where<br />
possible.<br />
• Where applicable, propose internal review of the <strong>Project</strong> depending on a<br />
justifiable situation.<br />
• Determine conditions for external evaluation of the <strong>Project</strong> towards the end of the<br />
<strong>Project</strong>.<br />
• Where the PSB cannot make a decision regarding <strong>Project</strong> implementation, the<br />
highest ranking official from ICEIDA and the Ministry of Irrigation and Water<br />
Development will have the responsibility to assist the parties in reaching<br />
consensus.<br />
• Keep records of agenda items and minutes of all PSB meetings<br />
51
Annex 18.11<br />
Terms of Reference for the ICEIDA <strong>Project</strong> Co-ordinator<br />
The <strong>Project</strong> Coordinator shall be employed by ICEIDA and will carry out her/his duties<br />
in accordance with ICEIDA Rules and Regulations as well as the employment contract<br />
with ICEIDA. S/he will be based in Monkey Bay and work closely with the Mangochi<br />
District office. The Coordinator shall participate in the annual planning of the <strong>Project</strong>, as<br />
well as the supervision of the day-to-day implementation and monitoring of the <strong>Project</strong>’s<br />
activities. The <strong>Project</strong> Coordinator will represent ICEIDA interests and shall directly<br />
report to ICEIDA <strong>Project</strong> Advisor/<strong>Project</strong> Manager in Water and Sanitation that is her/his<br />
an immediate supervisor. The ultimate supervisor is the ICEIDA Country Director.<br />
Duties and Responsibilities<br />
o Overseeing the implementation of ICEIDA support to the Water and Sanitation<br />
<strong>Project</strong> in the Monkey bay Health Zone;<br />
o Assisting ICEIDA Technical Advisor/ Manager with the preparation of annual<br />
work plans and budgets<br />
o Coordinate training of extension workers and local leaders in project related<br />
issues:<br />
o Supervising and controlling management of documents, reports and reference<br />
materials of the <strong>Project</strong>s.<br />
o Ensuring compliance with authorized forms and channels of communication and<br />
procedures for the proper management of the <strong>Project</strong><br />
o Ensuring proper care and maintenance of project vehicles and other equipment<br />
o Any other duties assigned by the ICEIDA <strong>Project</strong> Manager for Social <strong>Project</strong>s or<br />
Country Director<br />
52