26.12.2013 Views

Saturnino A. Pacubas - USAid

Saturnino A. Pacubas - USAid

Saturnino A. Pacubas - USAid

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

- 2 -<br />

The 94 projects listed may not all be covered by funds but nevertheless<br />

submitted because a large portion of the P55 million will be for contract<br />

projects which will be bidded and therefore there should be projects on<br />

line for whatever money will be available after each bidding.<br />

II - Objectives of a Cadastral Survey<br />

1. To produce cadastral maps or line maps for land titling purposes.<br />

2. To identify and aegregate private land holdings from the mass of<br />

public.lands.<br />

3. To assist the municipality in the production of tax maps for<br />

assessment and land tax re-evaluation.<br />

4. To identify conflict of claims and facilities settlement of land<br />

disputes.<br />

5. To determine and provide maps for various land uses such as those<br />

for tourism development, infrastructure, etc.<br />

6. To help expedite the land reform program.<br />

7. To identify and facilitate settlement of political boundary<br />

disputes.<br />

III - Target Outputs<br />

1. Cadastral maps and technical description (numerical or graphical<br />

as the case maybe) of all lots within the cadastre.<br />

2. Land Use I-aps needed for development planning.<br />

3- Political boundary maps.<br />

4. Tax maps used in land tax collection.<br />

IV - Phases of L'or%/Activitien in a Cadastral Survey<br />

.) ieconnaissance and preparatory activities such as:<br />

posting of notices of the cadastral survey; location of office<br />

quarters; dialogues with local officials; preliminary assessment<br />

of topography/terrain, climate and other local conditions; procurement/delivery<br />

of equipment and supplies.<br />

.) ilonunent construction<br />

.) Establishment of control lines and political boundaries and monumenting<br />

of control stations/political boundaries.<br />

.) Angling and chaining of control points/lines.<br />

.) Research work on survey references and data gathering.<br />

.) Sketching of land claims and monumenting of corners of lots<br />

.) Carding and individual notifications and posting of 30-day notions.<br />

.) Lot surveying.<br />

.) Computatio-n work<br />

.) Draftin gj/cart ography work<br />

/

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!