q)Commisary--- complete exterior <strong>of</strong> Commissary Building all around with<br />

exterior door/windows, exhaust fan grill, exposed pipes, over-hangs etc.<br />

TIME PERIODE; the contractor shall be given total 50 working days to<br />

complete this project after the receipt <strong>of</strong> letter to proceed.<br />

Note: Contractor shall verify availability <strong>of</strong> all material required as per scope <strong>of</strong><br />

work and accordingly bid for it. The contractor shall use make and brand <strong>of</strong><br />

material as mentioned in the scope <strong>of</strong> work or equivalent makes after approval<br />

from COR.<br />

The contractor shall complete the entire job as mention in the scope <strong>of</strong><br />

work within given time frame and then prepare punch list along with<br />

supervisor <strong>of</strong> the job. All the punch list items shall also be completed<br />

before or on completion date.<br />

SCOPE OF WORK<br />

1. The contractor shall provide and paint the exterior <strong>of</strong> all the <strong>building</strong>s as<br />

given above with minimum two coats <strong>of</strong> paint including pipes, overhang,<br />

gates and parapet wall with exterior emulsion water base paint” matching to<br />

existing” OR <strong>Embassy</strong> approved color.<br />

2. The contractor shall wash entire area/surface to be painted prior to start<br />

new <strong>painting</strong>. The metal work, gates, widow grills etc. shall be painted with<br />

enamel paint as per existing finish.<br />

3. The contractor shall remove all loose/peeling paint, mildew, fungus with<br />

wire brush and clean surfaces <strong>of</strong> dust, dirt, oil, grease etc. before <strong>painting</strong>.<br />

4. The contractor shall remove any tree roots from exterior surfaces and seal<br />

the holes with wediseals.<br />

5. The contractor shall provide a coat <strong>of</strong> cement primer on repaired surfaces<br />

before <strong>painting</strong>.<br />

REPAIRS:<br />

Any crack, loose/dead plaster or cement concrete shall be removed before<br />

<strong>painting</strong> and repair the same as per following:<br />

<br />

<br />

Repair shall be done with similar material that matches as closely as possible to<br />

existing plaster in texture and color.<br />

The contractor shall remove only loose plaster /concrete/cracks and redo<br />

the same with 1:4 cement plaster/ 1:2:4 cement concrete, matching to<br />

existing finish. The contractor shall apply a coat <strong>of</strong> cement based epoxy<br />

modified bonding agent before new plastering/concreting.<br />