General Permit for Biosolids Management - Washington State ...
General Permit for Biosolids Management - Washington State ...
General Permit for Biosolids Management - Washington State ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>General</strong> <strong>Permit</strong> <strong>for</strong> <strong>Biosolids</strong> <strong>Management</strong> Page 25<br />
9.7. Records of Analytical and Monitoring In<strong>for</strong>mation<br />
Records of analytical and monitoring in<strong>for</strong>mation must include all of the following:<br />
The date, place, and time of sampling or measurement.<br />
The individuals who per<strong>for</strong>med the sampling or measurement.<br />
The date analysis was per<strong>for</strong>med.<br />
The individual who per<strong>for</strong>med the analysis.<br />
The analytical technique or method used.<br />
The results of the analysis or measurement.<br />
10. REQUIREMENTS FOR BULK BIOSOLIDS APPLIED TO<br />
AGRICULTURAL LAND, FOREST LAND, A PUBLIC CONTACT<br />
SITE, OR A LAND RECLAMATION SITE<br />
10.1. Removing Manufactured Inerts<br />
The biosolids must meet the requirements <strong>for</strong> removal of manufactured inerts in WAC 173-308-205.<br />
Minimally, the following conditions must be met.<br />
The biosolids must contain