Key drivers for EIA's short‐term US crude oil production outlook

Key drivers for EIA's short‐term US crude oil production outlook

Key drivers for EIA's short‐term US crude oil production outlook

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

nearing completion. The Enbridge/Enterprise Seaway Expansion brought 250,000 bb/d of new capacity<br />

into service on January 11, 2013. A new pipeline with 700,000 bbl/d of capacity is expected to be<br />

completed in the fourth quarter of 2013 and an additional 450,000 bbl/d of capacity is expected to be<br />

added in 2014 (Table 3).<br />

Table 3. New Pipeline Projects from Cushing, Oklahoma to the Gulf Coast (2013 – 2014)<br />

Pipeline Project<br />

New Capacity<br />

(bbl/d)<br />

Planned In‐<br />

Service Date<br />

Description<br />

Enbridge/Enterprise Seaway expansion 250,000<br />

Jan 11, 2013<br />

completed<br />

Expand existing pipeline from<br />

150,000 bbl/d to 400,000 bbl/d<br />

TransCanada Gulf Coast project 700,000 4Q 2013<br />

New 485‐mile, 36‐inch pipeline to<br />

Nederland, Texas<br />

Enbridge/Enterprise Seaway twin 450,000 1Q 2014<br />

New 512‐mile, 30‐inch pipeline<br />

parallel to existing Seaway pipeline<br />

Source: U.S. Energy In<strong>for</strong>mation Administration<br />

In anticipation of the new pipeline take‐away capacity from Cushing, 1,225,000 to 1,315,000 bbl/d of<br />

new pipeline capacity to deliver <strong>crude</strong> <strong>oil</strong> into the Cushing hub is also planned (Table 4).<br />

Table 4. New Pipeline Projects Delivering Crude Oil to Cushing, Oklahoma (2013 – 2014)<br />

Pipeline Project<br />

New Capacity<br />

(bbl/d)<br />

Planned In‐<br />

Service Date<br />

Plains All American Mississippian Lime 175,000 Mid‐2013<br />

SemGroup/Gavilon Glass Mountain 140,000 Fall 2013<br />

White Cliffs pipeline expansion 80,000 1H 2014<br />

Description<br />

New 170‐mile pipeline from<br />

Mississippian Lime <strong>for</strong>mation in the<br />

Anadarko basin<br />

New 210‐mile, 20‐inch pipeline from<br />

Mississippian Lime and Granite<br />

Wash <strong>for</strong>mations in the Anadarko<br />

basin<br />

Expansion from 70,000 bbl/d to<br />

150,000 bbl/d<br />

Enbridge Flanagan South 600,000 Mid‐2014<br />

New 600‐mile, 36‐inch pipeline<br />

paralleling existing Spearhead line<br />

Tallgrass Pony Express conversion<br />

Source: U.S. Energy In<strong>for</strong>mation Administration<br />

230,000 ‐<br />

320,000..<br />

3Q 2014<br />

Convert 430 miles of existing natural<br />

gas pipeline from Bakken and<br />

Denver‐Julesburg basins and<br />

construct 260‐mile extension to<br />

Ponca City, Oklahoma and Cushing,<br />

Oklahoma<br />

U.S. Energy In<strong>for</strong>mation Administration | STEO Supplement: U.S. Crude Oil Production Outlook 10