information was communicated to project personnel with changes made to the electrical<br />

procedures.<br />

- Standing orders were put into place to provide additional measures for safety concerning<br />

power lines and expectations for subcontractors. No personnel injuries or illnesses<br />

resulted in these incidents.<br />

- Reporting of these incidents was made using conservative interpretations and evaluations<br />

to ensure that the appropriate focus and corrective actions were implemented with<br />

effectiveness evaluated during FY12 and continuing in FY13 as an improvement area.<br />

<br />

Spills and Releases: As defined by DOE M 231.1-2, Group 5, Subgroup A<br />

- WCH experienced zero spills and releases in FY12.<br />

Transportation Safety: Transportation safety events as defined by DOE M 231.1-2, Group 8.<br />

- WCH experienced zero transportation safety related events in FY12.<br />

Near-Miss Occurrences: A reportable event or situation as described by DOE M 231.1-2,<br />

Group 10 in which an inappropriate action occurs, or a necessary action that could be<br />

reasonably expected to occur, is omitted and could have resulted in a serious personnel<br />

injury. This includes a situation in which controls that should have been in place were absent<br />

or overlooked.<br />

- WCH experienced zero Near-Miss Occurrences in FY12.<br />

<br />

Technical Safety Requirement Violations at nuclear facilities.<br />

- WCH experienced zero technical safety requirement violations in FY12.<br />

<br />

Completed Corrective Actions: Number of actions completed within the CAM system.<br />

- Greater that 70% of the actions entered into the CAM system were completed in FY12<br />

which meets the base goal.<br />

<br />

Percent of corrective actions that are overdue: Items within an IF in the CAM system.<br />