24 April 2013<br />

The General Manager<br />

Port Macquarie <strong>Hastings</strong> <strong>Council</strong><br />

P O Box 84<br />

PORT MACQUARIE NSW 2444<br />

ATTENTION: Mr Tim Molloy<br />

Dear Tim<br />

RE:<br />

PROPOSED PLANNING AGREEMENT – KMART DEVELOPMENT<br />

LOT 2 DP 1163062 WARLTERS STREET PORT MACQUARIE<br />

We refer to our meeting on 27 November 2012 with Port Macquarie <strong>Hastings</strong> <strong>Council</strong>’s (<strong>Council</strong>) Peter<br />

Cameron Tim Molloy Sandra Bush and David Troemel to discuss the Heads of Agreement for the <strong>Planning</strong><br />

Agreement. We also refer to our letter of offer dated 29 November 2012.<br />

Kmart Australia Limited (Kmart) is the owner of land at Lot 2 DP 1163062 Warlters Street, Port Macquarie<br />

(Land).<br />

As you know, Kmart:<br />

seeks an amendment of the Port Macquarie-<strong>Hastings</strong> Local Environmental Plan 2011 (LEP<br />

Amendment); and<br />

intends to lodge a development application for the development of the Land for retail purposes<br />

(Proposed Development).<br />

Further to our initial letter of offer dated 29 November 2012 and subsequent discussions with <strong>Council</strong>, the<br />

purpose of this letter is to consolidate Kmart’s offer to enter into a <strong>Planning</strong> Agreement with <strong>Council</strong> in<br />

connection with the LEP Amendment and the Proposed Development, pursuant to section 93F of the<br />

Environment & <strong>Planning</strong> Assessment Act 1979 to provide the development contributions set out in this<br />

letter of offer.<br />

LEP Amendment<br />

Kmart seeks an amendment to the Port Macquarie-<strong>Hastings</strong> LEP 2011 as follows:<br />

<br />

Amendment of the Floor Space Ratio Map (Sheet FSR-013FA) to apply a consistent 2.00:1 FSR<br />

on the Land. This will result in the application of an identical FSR on the Land to that which<br />

currently applies to the adjoining St Joseph’s Primary School and <strong>Settlement</strong> <strong>City</strong> properties.<br />

Amendment of the Height of Building Map (Sheet HOB-013FA) to:<br />

‣ Apply a Maximum Building Height of 16m over the Land apart from the Landmark site on<br />

the corner of Park and Warlters Streets which already has a height limit of 19m. The


esult of this amendment will be that land upon which a 5.4m or 11.5m height limit<br />

currently applies will have a new Height of Building limit of 16m.<br />

‣ We have provided <strong>Council</strong> with a separate submission on the LEP Amendment and note<br />

that as previous submissions have confirmed, the application of a consistent 16m HOB<br />

limit across the Land, supported by the provisions of the <strong>Planning</strong> Agreement, will not<br />

impact upon the important views and connectivity provisions identified in the <strong>Settlement</strong><br />

<strong>City</strong> <strong>Precinct</strong> Structure Plan.<br />

VPA offer<br />

Kmart offers to enter into a planning agreement with <strong>Council</strong> in connection with the LEP Amendment and<br />

the Proposed Development to provide the development contributions outlined below in the event that the<br />

LEP Amendment is made and development consent is granted for the Proposed Development.<br />

1 East West Pedestrian Connection<br />

Kmart offers to:<br />

Provide the East-West Pedestrian Connection (EWPC) generally as shown on the attached<br />

Map 1. The purpose of the EWPC is to provide long term unimpeded pedestrian access to<br />

the adjoining western property as part of a broader pedestrian network within the <strong>Settlement</strong><br />

<strong>City</strong> <strong>Precinct</strong>. The EWPC is to be a minimum of 8 metres wide at its intersection with the<br />

western boundary of the Land.<br />

Widen the EWPC to a minimum width of 8 metres as part of a potential future retail<br />

development on the northern side of the current location of the EWPC generally as shown<br />

on Map 1 attached or to a width and form as agreed by the parties, acting reasonably.<br />

2 North-South “Main Street” Connection<br />

Kmart offers to:<br />

Provide the North-South “Main Street” connection (NSMSC) between Warlters Street and Park<br />

Street generally in the location shown on Map 1 attached as part of the first stage of the<br />

Proposed Development. It is proposed to retain the NSMSC in the long term as a vehicular<br />

access road with no building structures built over it (apart from awnings over pedestrian<br />

footpaths or as agreed between the parties).<br />

Maps 1 and 2 generally set out the following components of the NSMSC:<br />

‣ access arrangements at Warlters Street;<br />

‣ extent of road carriageways, parallel parking, pedestrian footpaths and landscaping<br />

along the “Main Street”;<br />

‣ proposed access points to the eastern and western carparks;<br />

‣ Town Square;<br />

‣ relationship between the NSMSC and the EWPC and Town Square; and<br />

‣ access arrangements at Park Street.<br />

<br />

Widen the footpath on the eastern side of the NSMSC to a minimum width of 4 metres as part of<br />

a potential future development on the eastern side of the NSMSC or to a width and form as<br />

agreed by the parties.


3 Town Square<br />

Kmart offers to provide the Town Square generally as shown on Map 1 (attached). Kmart agrees<br />

that if a further development application is lodged for the Land (other than a development<br />

application for the Proposed Development), the Town Square will be expanded having regard to the<br />

nature and scale of the development and as determined by Kmart and <strong>Council</strong>, acting reasonably.<br />

4 Park Street / Warlters Street Intersection<br />

Kmart offers to undertake the intersection works including traffic signals at the intersection of<br />

Park and Warlters Streets (item 1 in Table 1.2 of the Draft S94 <strong>Settlement</strong> <strong>City</strong> <strong>Precinct</strong> Roads<br />

Contribution Plan (Draft CP)).<br />

Kmart seeks an offset against contributions proposed to be levied under the Draft CP for the<br />

Proposed Development to the value of these intersection works.<br />

5 Warlters Street Link - Park Street to Aston Street<br />

Kmart offers to undertake the road works associated with converting the frontage of the Land<br />

along Warlters Streets (or part thereof) to a four lane median separated carriageway (item 9 in<br />

Table 1.2 of the Draft CP) generally as shown on Map 1 (attached).<br />

The extent of the works proposed have been designed at concept design level by TTM<br />

Consulting (GC) Pty Ltd (TTM) and are generally shown on Map 1 and Map 3 (attached). The<br />

proposed roadworks are based on the 27m wide road reserve previously submitted to, and<br />

acknowledged by, <strong>Council</strong> as being acceptable. We note that <strong>Council</strong> is to update the<br />

construction cost estimates based on the 27m wide road reserve.<br />

Kmart seeks an offset against contributions to be levied under the Draft CP for the Proposed<br />

Development to the value of the Warlters Street roadworks.<br />

6 Road Widening in Warlters Street<br />

In addition to providing the Warlters Street roadworks, Kmart offers to dedicate land to the <strong>Council</strong><br />

along the frontage of the Land to facilitate the widening of Warlters Street to a 27m wide road<br />

reserve as follows:<br />

Kmart offers to dedicate 38.28% (2.68 m) of the proposed 7 m wide road widening in Warlters<br />

Street free of cost to <strong>Council</strong> as public road generally as shown on Map 4 attached. However,<br />

Kmart seeks a contribution offset against developer contributions levied under the Draft CP for<br />

61.72% (<strong>4.</strong>32 m) of the proposed 7 m wide road widening in Warlters Street.<br />

The value of the contribution offset is calculated as 1116m2 @ $325 /m2 to give a value of<br />

$362,700. This offer is based on:<br />

o The <strong>Settlement</strong> <strong>City</strong> <strong>Precinct</strong> Road Network Study (November 2009) prepared by TTM.<br />

o Further advice from TTM dated 21 March 2013 providing interpretation of the above<br />

Study (attached).<br />

o The relative areas of the Land, the St Joseph's primary school site and the <strong>Council</strong><br />

owned B3 zoned land with frontages to Warlters Street.<br />

o The exclusion of the area occupied by the Main Street within the Land.<br />

<br />

Kmart also offers to dedicate as public road the land required for the splay corner on the corner<br />

of Warlters Street and Park Street. Dimensional details relating to the splay corner will be<br />

submitted as part of the development application for the Proposed Development.<br />

Kmart does not seek an offset against contributions proposed to be levied under the Draft CP<br />

with respect to the value of the land required to be dedicated as the splay corner.


6. Park Street Pedestrian Facility (PSPF)<br />

Kmart offers to undertake road works to provide the PSPF, being a raised pedestrian facility<br />

incorporating a signalised pelican crossing linking the proposed Town Square with the Marina<br />

<strong>Precinct</strong> generally as shown on Map 1 (attached). The purpose of the PSPF is to:<br />

<br />

replace and upgrade the existing pedestrian facility in Park Street (see photo below); and<br />

encourage walkability into and through the <strong>Settlement</strong> <strong>City</strong> <strong>Precinct</strong> and provide a safe and<br />

convenient pedestrian crossing point that will link the <strong>Settlement</strong> <strong>City</strong> <strong>Precinct</strong> to the nearby<br />

foreshore public reserve and the CBD, consistent with the aims and objectives for the<br />

<strong>Settlement</strong> <strong>City</strong> <strong>Precinct</strong> in the draft Port Macquarie-<strong>Hastings</strong> Development Control Plan 2011.<br />

Kmart seeks an offset against contributions proposed to be levied under the Draft CP for the<br />

Proposed Development to the value of 60% of the total cost of the works associated with the PSPF.<br />

Section 94 credits<br />

As is clear from the above, Kmart is offering to provide development contributions under the <strong>Planning</strong><br />

Agreement which are well in excess of anticipated section 94 contributions for the Proposed Development.<br />

Consistent with <strong>Council</strong>'s approach under other planning agreements, this offer is on the basis that there is<br />

an ability under the <strong>Planning</strong> Agreement to apply any surplus in the value of the development contributions<br />

to be provided under this <strong>Planning</strong> Agreement (as compared to the section 94 contributions required for the<br />

Proposed Development) (Contribution Credits) towards requirements to pay development contributions<br />

for other developments to be carried out by Kmart (or its successors), or other land owners within the<br />

<strong>Settlement</strong> <strong>City</strong> <strong>Precinct</strong>.<br />

This offer is also made on the basis that:<br />

<br />

Kmart can apply to the <strong>Council</strong> for a payment of the value of the Contribution Credit where<br />

<strong>Council</strong>’s s94 fund for local roads relating to the <strong>Settlement</strong> <strong>City</strong> <strong>Precinct</strong> is in credit and Kmart<br />

has a Contribution Credit; and<br />

<strong>Council</strong> will pay the Contribution Credit if the s94 funds are not required as part of an obligation<br />

to another developer or for scheduled works under the Draft DCP.


We thank you for the opportunity to make this offer and look forward to meeting with you this week to<br />

discuss the above matters further.<br />

Should you have any queries regarding the above matter please do not hesitate to contact the writer.<br />

Yours faithfully<br />

Ian Williams<br />

Regional Property Manager<br />

Kmart Australia Ltd.


LIFT<br />

up<br />

RLO<br />

ENT.<br />

IL-694-50<br />

30<br />

R<br />

TIEMAN<br />

2900x2360mm<br />

TABLE<br />

LIFT<br />

31<br />

R<br />

50<br />

R<br />

51<br />

R<br />

19060 (1:100<br />

FALL)<br />

19<br />

METER<br />

SECTION C<br />

9120 (1:8<br />

FALL)<br />

27m<br />

2.90<br />

2.60<br />

2.60<br />

2.60<br />

2.60<br />

2.60<br />

2.90<br />

SECTION D<br />

SECTION E<br />

T T<br />

PEDESTRIAN CROSSING WORKS<br />

T T<br />

INTERSECTION WORKS<br />

PRELIMINARY ONLY - DO NOT USE FOR CONSTRUCTION<br />

K+C REF: L:\5335_KMart Warlters St\<strong>Planning</strong>\ 5335P_Carpark.dwg - A3(L)-VPA_Map1, 02- May- 2013, michaelw<br />

2.90<br />

2.60 2.60 2.60 2.60<br />

2.60 2.60 2.60 2.60 2.60 2.60 2.60<br />

2.60<br />

2.60<br />

GOODS<br />

2.90 2.60<br />

<strong>4.</strong>50<br />

33<br />

32<br />

31<br />

30<br />

29<br />

28<br />

27<br />

26<br />

25<br />

24<br />

23<br />

22<br />

21<br />

20<br />

19<br />

18<br />

<strong>4.</strong>80<br />

<strong>4.</strong>50<br />

2.90<br />

34<br />

2.60<br />

35<br />

2.60<br />

36<br />

5.40<br />

LAYBY<br />

5.40<br />

<strong>4.</strong>80<br />

<strong>4.</strong>80<br />

2.90<br />

LOCK-UP<br />

86<br />

2.60<br />

37<br />

5.40<br />

17<br />

2.90<br />

2.60<br />

38<br />

84<br />

2.60<br />

16<br />

2.60<br />

2.60<br />

39<br />

83<br />

2.60<br />

15<br />

2.60<br />

2.60<br />

40<br />

82<br />

2.60<br />

14<br />

2.60<br />

CHAIN MESH<br />

ROOF<br />

2.60<br />

41<br />

81<br />

2.60<br />

13<br />

2.60<br />

2.60<br />

42<br />

80<br />

2.60<br />

2.60<br />

3800W X<br />

4200H<br />

12<br />

2.60<br />

43<br />

79<br />

2.60<br />

11<br />

2.60<br />

2.60<br />

44<br />

78<br />

2.60<br />

10<br />

2.60<br />

2.60<br />

45<br />

77<br />

2.60<br />

87 89 89 90 91 92 93 94 95 96 97 98 99 100 101<br />

102 103 104<br />

133<br />

2.90<br />

2.90<br />

134<br />

85<br />

2.60<br />

132<br />

2.60<br />

2.60<br />

135<br />

131<br />

2.60<br />

2.60<br />

136<br />

130<br />

2.60<br />

2.60<br />

137<br />

129<br />

2.60<br />

2.60<br />

138<br />

128<br />

2.60<br />

2.60<br />

139<br />

127<br />

2.60<br />

2.60<br />

140<br />

126<br />

2.60<br />

2.60<br />

141<br />

125<br />

2.60<br />

2.60<br />

142<br />

124<br />

2.60<br />

2.60<br />

143<br />

9<br />

2.40<br />

2.60<br />

46<br />

76<br />

2.60<br />

123<br />

2.60<br />

2.60<br />

144<br />

2.90<br />

47<br />

<strong>4.</strong>20<br />

75<br />

2.60<br />

122<br />

2.60<br />

2.60<br />

145<br />

8<br />

5.40<br />

2.40<br />

74<br />

2.60<br />

121<br />

2.60<br />

2.60<br />

146<br />

73<br />

2.60<br />

120<br />

2.60<br />

2.60<br />

147<br />

72<br />

2.90<br />

119<br />

2.90<br />

2.90<br />

148<br />

2.90<br />

48<br />

71<br />

2.90<br />

118<br />

2.90<br />

2.90<br />

149<br />

2.60<br />

49<br />

70<br />

2.60<br />

117<br />

2.60<br />

2.60<br />

150<br />

2.60<br />

50<br />

69<br />

2.60<br />

116<br />

2.60<br />

2.60<br />

151<br />

2.60<br />

51<br />

68<br />

2.90<br />

105<br />

115<br />

2.60<br />

2.60<br />

152<br />

5.40<br />

5.40<br />

2.90<br />

52<br />

114<br />

2.60<br />

2.60<br />

153<br />

5.40<br />

113<br />

2.60<br />

2.60<br />

154<br />

7<br />

5.40<br />

2.40<br />

5.40<br />

53<br />

54<br />

112 111<br />

2.60 2.60<br />

2.60 2.60<br />

155 156<br />

2.90 2.30 2.30 2.30 2.30<br />

55<br />

110<br />

2.60<br />

2.60<br />

157<br />

56<br />

109<br />

57<br />

108 107<br />

2.60 2.60 2.60 2.90<br />

2.60 2.60 2.60<br />

158 159 160<br />

6 5 4 3 2 1<br />

2.40 2.60 2.60 2.60 2.60 2.90<br />

58<br />

2.30 2.30<br />

59<br />

60<br />

2.30 2.30<br />

106<br />

2.90<br />

161<br />

61<br />

5.40<br />

<strong>4.</strong>80<br />

<strong>4.</strong>80<br />

62<br />

2.30 2.30<br />

63<br />

64<br />

2.30 2.30<br />

65<br />

66<br />

19.9<br />

2.30 2.90<br />

67<br />

5.40<br />

35.2<br />

6.40<br />

6.10<br />

6.10<br />

17.5m<br />

6.10<br />

6.40<br />

6.10<br />

2.10<br />

2.10<br />

11<br />

10<br />

8<br />

7<br />

6<br />

2.10<br />

9<br />

3<br />

1<br />

2<br />

4<br />

2.10<br />

5<br />

6.10<br />

6.10<br />

6.10<br />

6.40<br />

6.40<br />

2.60<br />

2.60 2.60<br />

2.60 2.60 2.60 2.60<br />

2.60<br />

2.90<br />

2.60<br />

2.60<br />

2.60<br />

2.60<br />

2.90<br />

2.60 2.60 2.60 2.90<br />

5.40 1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

11<br />

12<br />

13<br />

5.38<br />

5.40<br />

14<br />

15<br />

16<br />

17<br />

87<br />

88<br />

89<br />

90<br />

5.40<br />

18<br />

19<br />

20<br />

5.40<br />

86<br />

5.40<br />

5.40<br />

85<br />

2.90<br />

SECTION B<br />

21 22<br />

2.90 2.60<br />

<strong>4.</strong>80<br />

<strong>4.</strong>80<br />

84<br />

<strong>4.</strong>80<br />

<strong>4.</strong>80<br />

<strong>4.</strong>80<br />

<strong>4.</strong>80<br />

<strong>4.</strong>80<br />

<strong>4.</strong>80<br />

2.60<br />

170<br />

2.90<br />

2.90<br />

203<br />

2.90<br />

23<br />

2.60<br />

83<br />

2.60<br />

82<br />

2.60<br />

91 92 93<br />

2.90 2.60 2.60<br />

2.90 2.60 2.60<br />

95 96 97<br />

102<br />

103 104<br />

2.90 2.60 2.60<br />

2.90 2.60 2.60<br />

135 134 133<br />

136<br />

2.90<br />

2.90<br />

169<br />

81<br />

2.60<br />

94<br />

2.90<br />

2.60<br />

98<br />

105<br />

2.60<br />

2.60<br />

132<br />

137 138 139<br />

2.60 2.60 2.60<br />

2.60 2.60 2.60<br />

168 167 166<br />

171 172 173<br />

2.60 2.60 2.60<br />

2.60 2.60 2.60<br />

202 201 200<br />

24 25 26<br />

2.60 2.60 2.60<br />

80<br />

<strong>4.</strong>80<br />

SECTION A<br />

2.60<br />

2.60<br />

99<br />

106<br />

2.60<br />

2.60<br />

131<br />

140<br />

2.60<br />

2.60<br />

165<br />

174<br />

2.60<br />

2.60<br />

199<br />

27<br />

2.60<br />

79<br />

2.60 2.60 2.60 2.60 2.60 2.60 2.60 2.60<br />

78<br />

2.60<br />

100<br />

107<br />

2.60<br />

2.60<br />

130<br />

141<br />

2.60<br />

2.60<br />

164<br />

175<br />

2.60<br />

2.60<br />

198<br />

28<br />

2.60<br />

77<br />

2.90<br />

101<br />

108<br />

2.60<br />

2.60<br />

129<br />

142<br />

2.60<br />

2.60<br />

163<br />

176<br />

2.60<br />

2.60<br />

197<br />

29<br />

2.60<br />

<strong>4.</strong>80<br />

76<br />

109<br />

2.60<br />

2.60<br />

128<br />

143<br />

2.60<br />

2.60<br />

162<br />

177<br />

2.60<br />

2.60<br />

196<br />

30<br />

2.60<br />

75<br />

110<br />

2.60<br />

2.60<br />

127<br />

144<br />

2.60<br />

2.60<br />

161<br />

178<br />

2.60<br />

2.60<br />

195<br />

31<br />

2.60<br />

74<br />

111<br />

2.60<br />

2.60<br />

126<br />

145<br />

2.60<br />

2.60<br />

160<br />

179<br />

2.60<br />

2.60<br />

194<br />

32<br />

2.60<br />

73<br />

112<br />

2.60<br />

2.60<br />

125<br />

146<br />

2.60<br />

2.60<br />

159<br />

180<br />

2.60<br />

2.60<br />

193<br />

33<br />

2.60<br />

72<br />

113<br />

2.60<br />

2.60<br />

124<br />

147<br />

2.60<br />

2.60<br />

158<br />

181<br />

2.60<br />

2.60<br />

192<br />

34<br />

2.60<br />

71<br />

2.60 2.60 2.60 2.60 2.60 2.60<br />

70<br />

114<br />

2.60<br />

2.60<br />

123<br />

148<br />

2.60<br />

2.60<br />

157<br />

182<br />

2.60<br />

2.60<br />

191<br />

35<br />

2.60<br />

69<br />

115<br />

2.60<br />

2.60<br />

122<br />

149<br />

2.60<br />

2.60<br />

156<br />

183<br />

2.60<br />

2.60<br />

190<br />

36<br />

2.60<br />

68<br />

116<br />

2.60<br />

2.60<br />

121<br />

150<br />

2.60<br />

2.60<br />

155<br />

184<br />

2.60<br />

2.60<br />

189<br />

37<br />

2.60<br />

67<br />

117<br />

2.60<br />

2.60<br />

120<br />

151<br />

2.60<br />

2.60<br />

154<br />

185<br />

2.60<br />

2.60<br />

188<br />

38<br />

2.60<br />

66<br />

118<br />

2.90<br />

2.90<br />

119<br />

152<br />

2.90<br />

2.90<br />

153<br />

186<br />

2.90<br />

2.90<br />

187<br />

39<br />

2.90<br />

<strong>4.</strong>80<br />

<strong>4.</strong>80<br />

<strong>4.</strong>80<br />

<strong>4.</strong>80<br />

<strong>4.</strong>80<br />

<strong>4.</strong>80<br />

5.40<br />

65<br />

2.60 2.60<br />

64<br />

63<br />

5.40<br />

2.60 2.90<br />

62<br />

61<br />

60<br />

59<br />

58<br />

57<br />

56<br />

55<br />

54<br />

53<br />

52<br />

51<br />

50<br />

49<br />

48<br />

47<br />

46<br />

45<br />

44<br />

43<br />

42<br />

41<br />

40<br />

<strong>4.</strong>80<br />

2.60 2.60 2.60 2.90<br />

2.60<br />

2.60<br />

2.60<br />

2.60<br />

2.60<br />

2.90<br />

2.60<br />

2.60<br />

2.60<br />

2.60<br />

2.60<br />

2.60<br />

2.60<br />

2.60<br />

2.60<br />

2.60<br />

2.60<br />

2.60<br />

WARLTERS STREET UPGRADE WORKS<br />

TOWN SQUARE<br />

MAIN STREET<br />

EAST WEST PEDESTRIAN CONNECTION<br />

KING + CAMPBELL<br />

King & Campbell Pty Ltd<br />

www.kingcampbell.com.au<br />

A: PO Box 243 Port Macquarie NSW 2444<br />

T: 02 6586 2555<br />

F: 02 6583 4064<br />

E: info@kingcampbell.com.au<br />

REV. DATE DESCRIPTION<br />

A 08.01.2013 ISSUED FOR PLANNING AGREEMENT<br />

B 01.05.2013 ISSUED FOR PLANNING AGREEMENT<br />

C 02.05.2013 REVISED PARKING AND CROSSING - FOR VPA<br />

DATUM:<br />

0<br />

AHD<br />

SCALE:<br />

25.0<br />

1:1000 @ A3<br />

NOTE: DO NOT SCALE OFF DRAWINGS. USE FIGURED DIMENSIONS ONLY.<br />

REPORT ANY DISCREPANCIES TO THE AUTHOR. THIS DRAWING, BEING THE<br />

PROPERTY OF KING & CAMPBELL PTY LTD, IS PROTECTED BY COPYRIGHT<br />

AND MUST NOT BE USED , REPRODUCED OR COPIED WHOLLY OR IN PART<br />

WITHOUT THE WRITTEN PERMISSION OF KING & CAMPBELL PTY LTD.<br />

© King & Campbell Pty Ltd<br />

PROJECT NO:<br />

DA NO.:<br />

DESIGNED BY:<br />

DRAWN BY:<br />

CHECKED BY:<br />

DATE CREATED:<br />

5335<br />

DAT/MW<br />

MW<br />

AJT<br />

JAN 2013<br />

DRAWING TITLE:<br />

PROJECT:<br />

CLIENT:<br />

KMART PORT MACQUARIE - PLANNING AGREEMENT<br />

LOT 2 DP 1163063<br />

WALTERS STREET, PORT MACQUARIE<br />

KMART AUSTRALIA LTD<br />

DRAWING NO:<br />

SHEET:<br />

REVISION:<br />

5335P_Carpark 01 C


BAY STREET<br />

PARK<br />

(A)<br />

K+C REF: L:\5335_KMart Warlters St\<strong>Planning</strong>\AutoCAD\ 5335P_Road Widening.dwg - A3(L)- Road Widening, 01- May- 2013, michaelw<br />

KING + CAMPBELL<br />

2<br />

DP 1163062<br />

WARLTERS STREET<br />

King & Campbell Pty Ltd<br />

www.kingcampbell.com.au<br />

A: PO Box 243 Port Macquarie NSW 2444<br />

T: 02 6586 2555<br />

F: 02 6583 4064<br />

E: info@kingcampbell.com.au<br />

REV. DATE DESCRIPTION<br />

A 15.01.2013 ISSUED FOR PLANNING AGREEMENT<br />

B 22.03.2013 ISSUED FOR PLANNING AGREEMENT<br />

C 2<strong>4.</strong>0<strong>4.</strong>2013 ISSUED FOR PLANNING AGREEMENT<br />

D 01.05.2013 ISSUED FOR PLANNING AGREEMENT<br />

DATUM:<br />

0<br />

NA<br />

© King & Campbell Pty Ltd<br />

SCALE:<br />

31.3<br />

27m<br />

1:1250 @ A3<br />

NOTE: DO NOT SCALE OFF DRAWINGS. USE FIGURED DIMENSIONS ONLY.<br />

REPORT ANY DISCREPANCIES TO THE AUTHOR. THIS DRAWING, BEING THE<br />

PROPERTY OF KING & CAMPBELL PTY LTD, IS PROTECTED BY COPYRIGHT<br />

AND MUST NOT BE USED , REPRODUCED OR COPIED WHOLLY OR IN PART<br />

WITHOUT THE WRITTEN PERMISSION OF KING & CAMPBELL PTY LTD.<br />

PROJECT NO:<br />

DA NO.:<br />

DESIGNED BY:<br />

DRAWN BY:<br />

CHECKED BY:<br />

DATE CREATED:<br />

5335<br />

-<br />

NA<br />

SK<br />

AJT<br />

JAN 2013<br />

2.68m ROAD WIDENING<br />

(KMART PROPORTION<br />

WITHOUT COMPENSATION)<br />

DRAWING TITLE:<br />

PROJECT:<br />

CLIENT:<br />

27m<br />

STREET<br />

KMART PORT MACQUARIE<br />

ROAD WIDENING<br />

TO 27m WIDE<br />

(REQUIRES 1116m² OF<br />

ROAD WIDENING)<br />

LOT 2 DP 1163063<br />

WARLTERS STREET, PORT MACQUARIE NSW<br />

KMART AUSTRALIA LTD<br />

EXISTING ROAD BOUNDARY<br />

DRAWING NO:<br />

SPLAY<br />

CORNER<br />

SHEET:<br />

REVISION:<br />

5335P_Road Widening 01 D