33. The topsoil shall be stripped and stockpiled and used to cover the landfill.<br />
34. The filled area, including batters, shall be grassed immediately after filling<br />
takes place.<br />
35. All fill to be adequately compacted by track rolling or similar in layers not<br />
exceeding 300mm.<br />
36. The cut or fill shall be battered at a slope not exceeding 1 (one) vertical to 3<br />
horizontal, unless prior geotechnical advice have been provided to the<br />
principal certifying authority as part of the construction certificate application.<br />
37. The site shall be secured to prevent the depositing of any unauthorised<br />
material.<br />
38. Dust control measures, e.g. vegetative cover, mulches, irrigation, barriers and<br />
stone shall be applied to reduce surface and airborne movement of sediment<br />
blown from exposed areas.<br />
39. Measures shall be implemented to prevent vehicles tracking sediment, debris,<br />
soil and other pollutants onto any road.<br />
40. All trucks entering or leaving the site shall have their trays suitably covered to<br />
prevent spillage of any material from the truck onto the road.<br />
41. Off-street car parking spaces, together with access driveways and turning<br />
areas, shall be constructed, paved, line marked, signposted and maintained,<br />
as shown on the approved plan.<br />
42. Disabled parking shall be provided in accordance with AS2890.1-1993.<br />
43. A ticketing system is to accompany any fill material being brought to the site.<br />
A register is to be kept on site to cross reference against the source records.<br />
An independent site auditor is to be engaged to undertake appropriate<br />
certification regarding the monitoring and validation of the fill material imported<br />
to the site as being sound, suitable for the proposed use and free of<br />
contamination.<br />
44. All necessary works being carried out to ensure that any natural water flow<br />
from adjoining properties is not impeded or diverted.<br />
45. All civil construction works required by this consent shall be in accordance with<br />
<strong>Hawkesbury</strong> Development Control Plan appendix E Civil Works Specification.<br />
46. All fill including existing fill must be compacted to 98% standard compaction in<br />
accordance with AS1289 and verified by the submission of test results and<br />
accompanied by a contoured depth of fill plan.<br />
JRPP (Sydney West Region) <strong>Business</strong> <strong>Paper</strong> – (Item 1) (01 September 2011) – (2011SYW020) 33