08.01.2014 Views

CASE STUDIES - HCL Infosystems

CASE STUDIES - HCL Infosystems

CASE STUDIES - HCL Infosystems

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>HCL</strong> - ULB Implementations<br />

<strong>CASE</strong> <strong>STUDIES</strong><br />

URBAN LOCAL BODIES (ULB) Implementations<br />

ORIGINAL<br />

Submitted To:<br />

TCIL<br />

SUBMITTED BY<br />

<strong>HCL</strong> INFOSYSTEMS LTD<br />

Web address www.hclinfosystems.in<br />

HEAD OFFICE : E-4, SECTOR 11, NOIDA- 201301,<br />

UTTAR PRADESH, INDIA<br />

CONTACT PERSON : Prashant Kaul (mob- 9650827700 /<br />

Prashant.kaul@hcl.com)<br />

Submitted in Confidence 1


<strong>HCL</strong> - ULB Implementations<br />

TABLE OF CONTENTS<br />

# 1. Roll-out of a Multi Transaction Processing System at Kolkata Municipal Corporation (KMC) ........... 3<br />

# 2. Install, Commission and operate “Municipal corporation enterprise services centres” (MCESC)<br />

and provide ERP based solutions for essential municipal backend functions on PPP built on<br />

BOOT for Kolhapur Municipal corporation ................................................................................ 11<br />

# 3. Operate “Municipal corporation enterprise services centers” (MCESC) built on BOOT for Sangli<br />

Miraj Kupwad city Municipal Corporation.................................................................................. 13<br />

Submitted in Confidence 2


<strong>HCL</strong> - ULB Implementations<br />

# 1. Roll-out of a Multi Transaction Processing System at Kolkata<br />

Municipal Corporation (KMC)<br />

Assignment Name: Roll-out of a Multi<br />

Transaction Processing System at KMC<br />

Location within Country: India<br />

Name of Client: Kolkata Municipal<br />

Corporation<br />

Address: Municipal Commissioner,<br />

No.5, S.N Banerjee Road,<br />

Kolkata – 700013<br />

Start Date<br />

(Month/Year):<br />

20/02/07<br />

Completion Date<br />

(Month/Year):<br />

Ongoing<br />

Country: India<br />

Submitted in Confidence 3<br />

Professional Staff Provided by Your<br />

Firm: Yes<br />

No. of Staff : under NDA<br />

No. of Staff-Months; duration of<br />

assignment: 10 Years<br />

Approx. Value of Services: Total Contract<br />

value is 36.5 Cr. (Services Included)<br />

Name of Associated Consultants, if any: NA No. of Months of Professional Staff,<br />

provided by Associated Consultants: NA<br />

Name of Senior Staff (Project Director/Coordinator, Team Leader) involved and<br />

functions performed:<br />

Mr. Kaushik Nandy (Project Director)<br />

Narrative Description of Project:<br />

Kolkata Municipal Corporation (KMC) serves more than 4.5 million static and another<br />

about 6 million floating population daily in Kolkata. It does so with the help of a complex<br />

multi – departmental set up and networking including 15 decentralized Borough<br />

Administrators and 141 Wards.<br />

The current project establishes a Multi Transaction Processing System which would be a<br />

sub set of the current Municipal Administrative System and through this project procures<br />

the necessary IT infrastructure hardware to deploy the same. This project is to enable and<br />

cater services to the citizens to process their Municipal Transactions<br />

The Scope of the project envisaged architecting the datacenter deployment at MTPS at<br />

primary and disaster recovery site. Also provision for the bandwidth requirement. The<br />

project also requires <strong>HCL</strong> to provide FM and AMC support services for a period of 10<br />

years.<br />

Description of Actual Services Provided by Your consultant:<br />

<strong>HCL</strong>’s Scope of the Project Involves:<br />

Supply installation & commissioning of the Infrastructure to deploy the Municipal<br />

Transaction Processing System (MTPS)<br />

Establishment of DC& DR site in high availability mode<br />

Management of the DC & DR solution<br />

Management of servers & system software<br />

Supply, Installation & Commissioning of the Oracle software and licenses<br />

To Ensure No Single Point of Failure (NSPOF), deployment of the system in high<br />

availability mode.


<strong>HCL</strong> - ULB Implementations<br />

<br />

<br />

<br />

Integration of the current system with the GIS application which is being developed by<br />

consultants appointed by KMC.<br />

Provide a deployment architecture of MTPS at primary & disaster recovery site and the<br />

bandwidth required for deployment<br />

Provide a solution, installation & support for Storage, Backup and data replication from<br />

the primary site to the disaster recovery site.<br />

Scope of Service Delivery Includes:<br />

The current project establishes a Multi Transaction Processing System which would be a<br />

sub set of the current Municipal Administrative System and through this project procures<br />

the necessary IT infrastructure hardware to deploy the same. This project is to enable and<br />

cater services to the citizens to process their Municipal Transactions.<br />

The target population it caters to is more than 4.5 million static and another about 6 million<br />

floating population daily in Kolkatta. It does so with the help of a complex multi –<br />

departmental set up and networking including 15 decentralized Borough Administrators<br />

and 141 Wards<br />

Services that are part of the project include:<br />

To provide the deployment architecture of the Municipal Transaction Processing<br />

System at the primary and the disaster recovery site<br />

To state the bandwidth required for the deployment of the system<br />

To provide a solution, installation and support for servers and storage<br />

To provide a solution for backup of the data and the software<br />

To provide a solution for replication of data from the primary site to the disaster<br />

recovery site<br />

To deliver a proof of performance demonstrating the satisfactory performance of the<br />

system<br />

Installation, testing, implementation and commissioning of all the equipments<br />

Integration of the equipments in the data center and the disaster recovery site<br />

System integration and fine tuning of the system components required for proper<br />

application performance<br />

Post Implementation Services:<br />

‣ The project includes a 3 year comprehensive on site maintenance support after post<br />

installation, from the date of successful implementation of the overall configuration and<br />

further to this all the equipments would be covered under comprehensive on site<br />

maintenance for a period of 7 years post warranty.<br />

‣ The comprehensive support during the ten year period includes the following.<br />

o System re-adjustment and / or system change – over support on occasions of<br />

reconfiguration and / or up gradation and extensions if any. This should also include<br />

operating system, RDBMS, and Cluster Management Software.<br />

o To remedy any such defects that may develop under normal usage arising from<br />

faulty materials, design or workmanship in the items supplied.<br />

o Considering the criticality of the project, the services and support is to be provided<br />

Submitted in Confidence 4


<strong>HCL</strong> - ULB Implementations<br />

by the OEM directly.<br />

‣ To provide a detailed technical and system architecture of the central data center,<br />

including different technology options<br />

‣ Provide specifications of the equipments with scalability options to ensure future<br />

upgrade facilities of the infrastructure<br />

‣ To provide a disaster recovery plan / solution with RPO close to zero.<br />

‣ Deployment of a resident engineer during the tenure of the contract for easy and fast<br />

resolution of the service calls<br />

‣ Provide a help desk 7 days x 24 hours and to be manned by resident engineers who are<br />

certified Oracle DBA’s, qualifies system administrators and hardware engineers in the<br />

team providing support at the Data center<br />

‣ To maintain the following documentation<br />

o Project implementation plan<br />

o Communications plan<br />

o Quality assurance plan<br />

o Systems manual<br />

o Operations manual<br />

o User manual<br />

o Periodic status reports<br />

o Documents containing original contractual requirements<br />

o User feedback forms<br />

Server Management Services<br />

Proactive Monitoring<br />

‣ 24*7 Proactive Monitoring of all the Servers in the KMC Data Center and DR<br />

site. Some of the key parameters would be<br />

‣ Availability of the Server<br />

‣ Hardware pre-failure and post-failures<br />

‣ Disk space Utilization<br />

‣ Memory Utilization.<br />

‣ Processor Utilization.<br />

‣ Network Utilization related to the server.<br />

‣ Monitoring log files.<br />

‣ Critical Services monitoring<br />

‣ Validate the alerts for False-Positives<br />

‣ Log tickets in the Service Desk system for valid alert<br />

<br />

Incident & Problem Management<br />

‣ Follow the Incident Management Procedure for resolving the Incident.<br />

‣ Co-ordinate with vendors in case of problems arising due to hardware failures or<br />

otherwise, in which case the involvement of the vendor or principles is required<br />

‣ Reinstallation of OS , arising due to incidents of OS crashes or problems where<br />

a reinstallation is required<br />

Submitted in Confidence 5


<strong>HCL</strong> - ULB Implementations<br />

‣ Trends on the incidents / problems<br />

‣ Recommend on the possible solution / workaround to address the probable<br />

causes of failure.<br />

<br />

<br />

<br />

<br />

<br />

System Administration Tasks<br />

‣ Creating and managing directory structures<br />

‣ Creating and managing domains<br />

‣ Creating and managing volumes<br />

‣ Assign Protocol addresses<br />

User Management Services<br />

‣ Creation of new users and deletion of existing users on request.<br />

‣ Create and maintain users groups<br />

‣ Create and maintain users profiles<br />

‣ Create login and logon scripts<br />

‣ Assigning and Maintaining user access rights as per policies defined and agreed<br />

upon by KMC<br />

‣ Assign and maintain space usage restriction<br />

‣ Configuring and maintaining print servers and print queues<br />

Release Management<br />

‣ Follow the Release Management Process and deploy OS patches and Security<br />

Patches.<br />

‣ The Release Process would follow a Plan, Test and Roll-out strategy as defined<br />

in the Change and Release Management Process.<br />

‣ Maintain the Complete Configuration Information of the Servers<br />

‣ Assist KMC to define standard naming convention policies<br />

Security Administration Tasks<br />

‣ Monitor access and security restrictions on the Server<br />

‣ Restricted access to Business Applications<br />

‣ Hardening of the Operating Systems as per baseline agreed upon.<br />

‣ Security Audit for Unauthorised User access to the Production Systems<br />

‣ User Password Control Policy<br />

‣ Periodic Log File Archival<br />

‣ Log File Analysis for abnormalities in Security Log<br />

‣ Intrusion Detection over vulnerable ports in the servers<br />

Implementation of Best Practices<br />

‣ Controlled Release of Patches<br />

‣ Rigorous Change Control Procedures for Patch Deployment / Upgrades<br />

‣ Periodic System Information Backup<br />

‣ Configuration Changes only after a formal Change Management Process<br />

‣ Server Builds ( Build Images of the Servers to ensure quick restoration )<br />

‣ Periodic Schedule Maintenance Activity ( which may include restart of the<br />

Submitted in Confidence 6


<strong>HCL</strong> - ULB Implementations<br />

systems)<br />

‣ Recommendation and Configuration of RAID, Load Balancers for Critical<br />

Systems<br />

Storage Management Services<br />

Proactive Monitoring<br />

‣ 24*7 Monitoring of the Critical Parameters of the SAN/NAS Box…<br />

‣ CPU Utilization<br />

‣ Uptime Statistics<br />

‣ Volume Usage Statistics<br />

‣ Snapshot Usage Statistics<br />

‣ Snap Mirror Lag<br />

Incident & Problem Management<br />

‣ Follow the Incident Management Procedure for resolving the Incident.<br />

‣ Co-ordinate with vendors in case of problems arising due to hardware failures or<br />

otherwise, in which case the involvement of the vendor or principles is required<br />

‣ Reinstallation of the Setup , arising due to incidents of Crashes or problems<br />

where a reinstallation is required<br />

‣ Trends on the incidents / problems<br />

‣ Recommend on the possible solution / workaround to address the probable<br />

causes of failure.<br />

System Administration Tasks<br />

‣ Configure Port setting<br />

‣ Configure Port zoning<br />

‣ Add, delete and modify RAID configuration<br />

‣ Add, delete and modify file system configuration<br />

‣ Physical disk management<br />

Security Management Tasks<br />

‣ Configuration of Volume with relevant user rights and permissions after a<br />

complete change management cycle<br />

‣ Management and Audit of the usage of the volumes by the assigned users<br />

<br />

Backup and Restoration Management<br />

‣ <strong>HCL</strong> will adhere to or develop a back up strategy for KMC, based on the<br />

business requirements.<br />

‣ <strong>HCL</strong> will ensure that KMC’s users are able to use data stored in tape or<br />

cartridge media without delay to their normal functions when requests for the<br />

data are made during scheduled batch jobs and during normal interactive<br />

accesses.<br />

Submitted in Confidence 7


<strong>HCL</strong> - ULB Implementations<br />

‣ All required files from archived tapes stored on-site or off-site, are restored<br />

within the time frames designated in the Procedures Manual.<br />

‣ Data is maintained, in accordance with the regulatory requirements applicable to<br />

KMC, such that all obligations concerning privacy or public accountability that<br />

pertain to KMC shall also pertain to <strong>HCL</strong>.<br />

‣ Tapes, cartridges and related paper documentation are stored in accordance with<br />

KMC’s requirements and the business continuity and business resumption plans.<br />

‣ <strong>HCL</strong> will provide routine backup and recovery of data with respect to the IT<br />

Infrastructure so as not to adversely impact scheduled operations and maximize<br />

availability of the Services by performing regular backups of all Intel systems.<br />

‣ <strong>HCL</strong> will carry out backup, file recovery, preservation of transaction data from<br />

KMC and preservation of historical files of all relevant Data for KMC.<br />

‣ Performing file backup and recovery procedures for KMC production workload<br />

in accordance with standards and procedures agreed with KMC, as necessary to<br />

maximize availability of the IT Services during problems and in accordance<br />

with the time periods set out in the Business Continuity Plan.<br />

‣ <strong>HCL</strong> will implement procedures to enhance the effectiveness of the records<br />

retention effort. Such procedures shall be:<br />

‣ Saving records in a retrievable and readable format;<br />

‣ Labelling and storing storage media in accordance with the storage policy where<br />

applicable, and as set out in the Procedures Manual;<br />

‣ Verifying the readability of the stored data.<br />

Database Management<br />

Proactive Monitoring<br />

‣ 24*7 Monitoring of all the Critical Parameters for a database like..<br />

‣ Table space, segment, extent & block level.<br />

‣ Checking performance of the associated background processes<br />

‣ Buffer Cache utilization.<br />

‣ Redo log contention.<br />

‣ Resource intensive users, processes<br />

‣ Negative or duplicate usage<br />

‣ Fragmentation of table spaces, tables & indexes<br />

‣ Memory / I/O / CPU Utilizations for the RDBMS<br />

‣ Disk Free Space<br />

‣ Alert Logs for errors<br />

‣ DB Backup Logs<br />

‣ Unsuccessful Logins<br />

‣ Monitor system performance and recommend actions for improving the system:<br />

Analyze the result of the Daily monitoring procedures and suggest if any<br />

changes are required to improve the performance of the Database / System /<br />

Applications.<br />

System Administration Tasks<br />

Submitted in Confidence 8


<strong>HCL</strong> - ULB Implementations<br />

‣ Database Creation<br />

‣ Schema Object Management<br />

‣ Table Management<br />

‣ Table reorganization<br />

‣ Index Management<br />

‣ Index reorganization<br />

‣ Rollback Segment Management<br />

‣ Table space Management<br />

‣ User & Role Management<br />

DB Backup<br />

‣ Implement backup strategy of the databases & assisting for proper restoration<br />

and recovery.<br />

‣ Type and Frequency of Backups will be planned as per criticality database<br />

related incidents & problems<br />

‣ Restoration of database, archive log.<br />

‣ Database recovery with minimal downtime by using the right backups available.<br />

Recovery will depend of efficiency of backup strategy as planned in<br />

consultation with KMC.<br />

House Keeping Tasks<br />

‣ Regular defragmentation activities for better space management and<br />

performance<br />

‣ Perform table-loading jobs<br />

Administration Tasks<br />

‣ Perform Database object creation / modification activities through import utility.<br />

The Database Administrator will implement any change in the Database.<br />

‣ Assist users in accessing and using the information: Assisting users in<br />

connecting to the Database through the applications. Handle database<br />

configuration problems.<br />

Security Management<br />

‣ Grant and revoke database access: Understand and Implement Database Security<br />

in view of the requirements for Business Functionality. Securing Database<br />

access through system Database Roles and privileges as per Oracle security<br />

guidelines.<br />

<br />

Incident and Problem Management<br />

‣ Co-ordination with principle / vendors: Coordination with the vendor / principal,<br />

for patch codes, bug fixes, upgrades on a need / no need basis and also for any<br />

technical escalation i.e. the Database software, and OS vendors and Storage<br />

Principals.<br />

‣ Be a bridge between Application Owner and database software vendor and<br />

application software vendor: Understand the user requirement and conduct<br />

discussions with the application owner and vendor to provide solutions of best<br />

Submitted in Confidence 9


<strong>HCL</strong> - ULB Implementations<br />

strategy to enhance the current system.<br />

‣ Check and respond to all database related calls in the Service Desk and follow<br />

up for the closure of the activities and update the call status.<br />

<br />

Trend Based Consulting<br />

‣ Involvement in implementation for database availability, performance and<br />

automation.<br />

‣ Keeping the system requirements in mind, understand the new application and<br />

usage with the vendor which is database specific and check the security loop<br />

holes, functionality and impact analysis before implementation on Live.<br />

‣ Setup baselines for application databases: Implementing the Set up standards for<br />

database disk layout, backup strategy, maintenance activity and security<br />

guidelines for databases before going live and capture the exceptions.<br />

Submitted in Confidence 10


<strong>HCL</strong> - ULB Implementations<br />

# 2. Install, Commission and operate “Municipal corporation<br />

enterprise services centres” (MCESC) and provide ERP based<br />

solutions for essential municipal backend functions on PPP built on<br />

BOOT for Kolhapur Municipal corporation<br />

Assignment Name: Install, Commission and<br />

operate “Municipal corporation enterprise services<br />

centres” (MCESC) and provide ERP based<br />

solutions for essential municipal backend functions<br />

on PPP built on BOOT for Kolhapur Municipal<br />

corporation<br />

Location within Country: Kolhapur<br />

Name of Client: Kolhapur municipal corporation<br />

Address: Kolhapur Municipal Corporation,<br />

Post Box No. 33<br />

Kolhapur – 416002.<br />

Country: India<br />

Professional Staff Provided by Your<br />

Firm: Yes<br />

No. of Staff: under NDA<br />

No. of Staff-Months; duration of<br />

assignment<br />

Start Date<br />

(Month/Year): December<br />

2008<br />

Completion Date<br />

(Month/Year):<br />

Ongoing<br />

Approx. Value of Services :<br />

Rs. 64 Crores(including services)<br />

Name of Associated Consultants, if any: NA No. of Months of Professional Staff,<br />

provided by Associated<br />

Consultants: n/a<br />

Name of Senior Staff (Project Director/Coordinator, Team Leader) involved and<br />

functions performed: Anand Bhatnagar (head delivery)<br />

Narrative Description of Project:<br />

KMC was formed for improvement of the city & the primary responsibility in Byelaws is<br />

Up keeping & maintenance of civic amenities & the planning authority. KMC launched its<br />

formal e-Governance initiatives few years back & computerized some of its activities<br />

(Octroi, Birth & Death, City Water Supply, Provident Fund, Property Tax, Payroll and<br />

Website).<br />

Recently KMC had initiative for the computerization of entire corporation including its<br />

entire department. Internal systems & procedures have been streamlined thereby enhancing<br />

the overall efficiency and transparency in the operations of Kolhapur Municipal<br />

Corporation. Main objectives of KMC’s project were:<br />

<br />

<br />

<br />

Interconnecting the entire Kolhapur Municipal Corporation.<br />

Transform every possible desktop manual transaction to IT enabled.<br />

Identify & implement various citizen services avenues & also improvement of the<br />

present citizen services.<br />

Submitted in Confidence 11


<strong>HCL</strong> - ULB Implementations<br />

Formulate & Strengthen policies & procedures to ensure sustenance of the E-<br />

Governance initiatives.<br />

Description of Actual Services Provided by You :<br />

Services provided include:<br />

Installation, Commissioning and Operation of “Municipal Corporation Enterprise<br />

Service Centers” and provide ERP based solutions for essential Municipal Backend<br />

Functions on PPP model built on BOOT basis for a period of 10 years.<br />

Develop, Customize and Maintain ERP based software application for Kolhapur<br />

Municipal Corporation<br />

Supply and installation of the Hardware equipment<br />

Establishment of DC& DR site in high availability mode<br />

Management of the DC & DR solution<br />

Management of servers & system software<br />

Supply, Installation & Commissioning of the Oracle software and licenses<br />

Provide a solution, installation & support for Storage, Backup and data replication from<br />

the primary site to the disaster recovery site.<br />

To provide a solution for replication of data from the primary site to the disaster<br />

recovery site<br />

Integration of the equipments in the data center and the disaster recovery site<br />

Site preparation including Data center IT & Non IT infrastructure & Physical<br />

infrastructure<br />

User level training for the ERP application software<br />

Submitted in Confidence 12


<strong>HCL</strong> - ULB Implementations<br />

# 3. Operate “Municipal corporation enterprise services centers”<br />

(MCESC) built on BOOT for Sangli Miraj Kupwad city Municipal<br />

Corporation<br />

Assignment Name: Operate “Municipal<br />

corporation enterprise services centers”<br />

(MCESC) built on BOOT for Sangli Miraj<br />

Kupwad city Municipal Corporation.<br />

Location within Country: Sangli,<br />

Maharashtra<br />

Country: India<br />

Professional Staff Provided by Your Firm<br />

: Yes<br />

Name of Client: Sangli Miraj Kupwad City<br />

Municipal Corporation<br />

Address: Sangli Miraj Kupwad City<br />

Municipal Corporation, General<br />

Administration department, Maharashtra<br />

Start Date<br />

Completion Date<br />

(Month/Year): 2009 (Month/Year):<br />

Ongoing<br />

Name of Associated Consultants, if any: NA<br />

Submitted in Confidence 13<br />

No. of Staff: Under NDA<br />

No. of Staff-Months; duration of<br />

assignment<br />

Approx. Value of Services :<br />

40 Cr<br />

No. of Months of Professional Staff,<br />

provided by Associated Consultants:<br />

under NDA<br />

Name of Senior Staff (Project Director/Coordinator, Team Leader) involved and<br />

functions performed: Anand Bhatnagar (Delivery Head)<br />

Narrative Description of Project:<br />

As a part of the e-governance Project the Sangli Miraj Kupwad Municipal Corporation desires<br />

to setup MCES Centers in the area under jurisdiction of the Municipal Corporation of SMK<br />

The Project is proposed to be implemented in built on BOOT model. The business model is<br />

based on a transaction-based service charge payable to the operator.<br />

Provide software/hardware/networking infrastructure to cater for complete functionality of the<br />

mentioned departments including back office and MIS requirements of the department by<br />

doing a detailed requirement analysis study/Gap Analysis study and submit department wise<br />

SRS is the brief scope of work.<br />

Description of Actual Services Provided by You :<br />

The maintenance services of systems include following activities as per requirements:<br />

<br />

<br />

<br />

<br />

Preventive maintenance to keep the system functional at all times. Preventive<br />

Maintenance shall not be attended during “CFC”s working hours.<br />

Load and Reload software on desktop OS<br />

Other office S/W, customized S/W, antivirus etc.


<strong>HCL</strong> - ULB Implementations<br />

<br />

<br />

<br />

<br />

<br />

Installation and Reload Support for Server OS<br />

Installation and Reload Support for Application software.<br />

Rectification of system software problems due to crashing or malfunctioning of the<br />

OS, RDBMS or front end, within the time limits prescribed.<br />

Installation of upgrades of system software namely, OS, RDBMS, and front end<br />

Guarding the systems against virus infections using the latest anti-virus tools.<br />

Services provided include:<br />

Installation, Commissioning and Operation of “Municipal Corporation Enterprise Service<br />

Centers” and provide ERP based solutions for essential Municipal Backend Functions on<br />

PPP model built on BOOT basis for a period of 10 years.<br />

Develop, Customize and Maintain ERP based software application for Kolhapur Municipal<br />

Corporation<br />

Supply and installation of the Hardware equipments<br />

Establishment of DC& DR site in high availability mode<br />

Management of the DC & DR solution<br />

Management of servers & system software<br />

Supply, Installation & Commissioning of the Oracle software and licenses<br />

Provide a solution, installation & support for Storage, Backup and data replication from<br />

the primary site to the disaster recovery site.<br />

To provide a solution for replication of data from the primary site to the disaster recovery<br />

site<br />

Integration of the equipments in the data center and the disaster recovery site<br />

Site preparation including Data center IT & Non IT infrastructure & Physical<br />

infrastructure<br />

User level training for the ERP application software<br />

Departmental to be covered under e-governance project:<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Tax assessment and recovery<br />

License Department (Market)<br />

License Department (Food)<br />

City water supply department<br />

Estate department<br />

Public relation office<br />

Accounts department<br />

Audit department<br />

Labour department<br />

General administration department<br />

General Provident fund<br />

Health – Sanitation<br />

Health – Stores<br />

Birth & Death department<br />

Submitted in Confidence 14


<strong>HCL</strong> - ULB Implementations<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Electric work<br />

Garden<br />

Workshop<br />

Engineering Projects<br />

Zonal / Division offices<br />

Legal department<br />

Stores department<br />

Record department<br />

Education<br />

Suvarna Jayanti shahari rojgar yojana<br />

Municipal Secretary department<br />

Health- Hospital<br />

Website<br />

Fire Brigade<br />

PWD Accounts<br />

Library<br />

Interactive Voice Response System (IVRS)<br />

Attendance system – Biometric Finger print<br />

Misc collection / File management / Grievance / Marriage Bureau<br />

Submitted in Confidence 15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!