CANDIDATE PROJECTS FOR 2030 REGIONAL TRANSPORTATION PLAN<br />

2030 STATUS LEGEND<br />

N Project was submitted as a candidate for NHS funds for the 2030 Plan.<br />

O Project was submitted as a candidate for sources of funds other than NHS for the 2030 Plan.<br />

Projects in the recent Regional Toll Study are not included in this list, as financing for these projects is currently being discussed by the General Assembly.<br />

PROJID<br />

EPDO Poverty HH's<br />

Crash Rate in Nearby<br />

per MVMT BlockGrp<br />

Minority<br />

Persons<br />

in Nearby<br />

BlockGrp Work<br />

Current<br />

Cost<br />

(M$'s)<br />

2030 Cost<br />

(FY06+, million<br />

YOE $'s)<br />

Proj. Link<br />

EXIST. ADT<br />

('01 to '03)<br />

(21)<br />

2030<br />

Status Locality Project From To<br />

2006<br />

Lanes<br />

Prop'd<br />

Lanes<br />

YOE<br />

8 N CH GW Hwy (in Deep Creek, north) Mill Creek Pkwy I-64 n.a. 0% 17% Widening 4 6 $101 2014-2022 $165 22,857 F<br />

7 N CH GW Hwy (in Deep Creek, south) Sawyers Mill Rd Cedar Rd 2.2 7% 31% New Alignment 0 4 $11 2022-2030 $25 3,917 B<br />

23 N GLO Rte 17 (Gloucester), north Main St. (south) Ark Rd. 1.3 4% 17% Widening 4 6 $56 2022-2030 $125 17,672 A<br />

22 N GLO Rte 17 (Gloucester), south Coleman Bridge Main St. (south) 2.5 4% 10% Widening 4 6 $148 2014-2022 $242 34,070 F<br />

40 N HM I-64 (<strong>Hampton</strong>) I-664 Mallory Rd 1.8 23% 95% Widening 6 8 $306 2022-2030 $682 97,807 D<br />

44 N HM Magruder Blvd Cmdr Shep Blvd ext HRCP n.a. 6% 48% Widening 4 6 $34 2022-2030 $75 34,812 C<br />

62 N MULTI Ft Eustis Blvd 0.54 mi. e. Jefferson Ave Rte 17 n.a. 0% 7% Widening 2 4 $36 2014-2022 $60 16,997 D<br />

37 N MULTI <strong>Hampton</strong> <strong>Roads</strong> Center Pkwy Harpersville Rd I-64 2.4 3% 49% Widening 4 6 $36 2022-2030 $81 42,994 D<br />

64 N MULTI I-264 (add two lanes, I-64 to Indep Blvd) I-64 Independence Blvd 3.0 8% 49% Widening 8+2 10+2 $400 2022-2030 $892 241,927 E<br />

65 N MULTI I-264 (prepare existing lanes for all uses) I-64 Independence Blvd 2.6 8% 49% Widening 8+2 10 $300 2022-2030 $669 241,927 E<br />

67 N MULTI I-664 (Southside) Bowers Hill Rte 17 / Bridge Rd 1.2 1% 18% Widening 4 6 $56 2022-2030 $125 73,215 E<br />

80 N NN I-64 (Newport News) Jefferson Ave (exit 255) Merrimac Trail (exit 247) 2.0 6% 35% Widening 4 6+2 $160 2014-2022 $262 89,613 E<br />

79 N NN I-64 / Bland intx na na n.a. 3% 40% Interchange(s), New n.a. n.a. $112 2022-2030 $250 89,613 E<br />

82 N NN Jefferson Ave Grn Grove Ln / Atkinson Ft. Eustis Blvd 2.3 16% 66% Widening 4 6 $34 2022-2030 $75 23,013 C<br />

85 N NN Rte 17 (J Clyde Morris Blvd) I-64 Harpersville Rd 1.7 9% 29% Widening 4 6 $26 2014-2022 $42 41,480 F<br />

94 N NOR Brambleton Ave St. Pauls Blvd I-264 2.4 56% 97% Widening 4 6 $90 2022-2030 $200 36,846 E<br />

102 N NOR Little Creek Rd Tidewater Dr Military Hwy 3.4 18% 48% Widening 4 6 $14 2022-2030 $30 46,106 D<br />

112 N PORT 4th Marine Terminal Access (20) Western Fwy Craney Island n.a. 5% 33% New Alignment 0 4 $275 2022-2030 $614 n.a. n.a.<br />

199 N Transit Alt fuel buses: Oystr Pt & Dwntwn Norf na na n.a. 4% 18% Purchase buses n.a. n.a. n.a. 2022-2030 being developed n.a. n.a.<br />

213 N Transit Norfolk Light Rail Newtown Rd Norfolk General Hospital n.a. 43% 99% Capital cost n.a. n.a. n.a. n.a. $204 n.a. n.a.<br />

219 N Transit Southside bus terminal / maint. facility na na n.a. 17% 21% Improve / replace n.a. n.a. n.a. 2014-2022 being developed n.a. n.a.<br />

145 N VB I-264 / Independence Blvd intx na na 2.4 5% 37% Interchange imp. n.a. n.a. $112 2022-2030 $250 n.a. n.a.<br />

146 N VB I-264 / Lynnhaven Pkwy intx na na 2.5 6% 59% Interchange imp. n.a. n.a. $55 2014-2022 $91 n.a. n.a.<br />

147 N VB I-264 / Rosemont Rd intx na na 1.3 5% 23% Interchange imp. n.a. n.a. $84 2022-2030 $187 n.a. n.a.<br />

144 N VB I-264 / Witchduck Rd intx na na 3.0 3% 8% Interchange imp. n.a. n.a. $95 2014-2022 $156 n.a. n.a.<br />

148 N VB Independence Blvd Haygood Rd Northampton Blvd 2.4 3% 14% Widening 4 6 $31 2022-2030 $69 43,743 F<br />

164 N VB Northampton Blvd / Shore Dr intx na na n.a. 11% 19% Improve interchange n.a. n.a. $15 2022-2030 $33 n.a. n.a.<br />

193 N YC Rte 17 (York Co.) <strong>Hampton</strong> Hwy Goodwin Nk / Denbigh B 1.0 3% 12% Widening 4 6 $45 2014-2022 $73 55,511 F<br />

2 O CH Cedar Rd Albemarle Dr Battlefield Blvd 1.1 6% 39% Widening 3 4 $10 2022-2030 $22 23,327 D<br />

3 O CH Cedar Rd (incl'g Deep Crk br) (7) Mill Creek Pkwy Shipyard Rd 2.2 7% 31% Widening 2 4 $81 2014-2022 $132 13,974 F<br />

9 O CH Hanbury Rd Johnstown Rd Battlefield Blvd 0.4 0% 12% Widening 2 4 $12 2014-2022 $19 7,860 C<br />

13 O CH Military Hwy Allison Dr VB CL 1.7 5% 70% Widening 4 6 $40 2014-2022 $65 36,344 F<br />

15 O CH Mt Pleasant Rd (incl'g Byp intx impr'ts) Great Bridge Bypass Centerville Tnpk 2.5 2% 9% Widening 2 4 $25 2022-2030 $56 17,950 E<br />

30 O HM Armistead Ave Mercury Blvd <strong>Hampton</strong> <strong>Roads</strong> Center Pkwy 2.5 5% 27% Widening 4 6 $23 2022-2030 $52 35,453 C<br />

39 O HM I-64 @ Armistead Ave & Lasalle Ave n.a. n.a. 1.5 23% 95% Modify Interchange n.a. n.a. $45 2022-2030 $100 n.a. n.a.<br />

42 O HM Little Back River Rd King St Harris Creek Rd 0.9 6% 33% Widening 2 4 $18 2014-2022 $30 5,314 C<br />

51 O IW Smithfield Connector Nike Park Rd Smith's Neck Rd n.a. 6% 12% New Alignment 0 4 $8 2022-2030 $17 n.a. n.a.<br />

57 O JC Rte 60 relo. - east section- JCC Rte 60 near WalMart Distr Ctr.Newport News CL 1.8 6% 46% New alignment 0 4 $48 2014-2022 $79 n.a. n.a.<br />

77 O NN Atkinson Blvd Warwick Blvd Jefferson Ave n.a. 13% 64% New Alignment 0 4 $26 2014-2022 $42 n.a. n.a.<br />

78 O NN Harpersville Rd Jefferson Ave Warwick Blvd 1.6 6% 38% Widening 2 4 $16 2022-2030 $35 13,198 D<br />

83 O NN Middleground Blvd Jefferson Ave Warwick Blvd n.a. 9% 25% New Alignment 0 4 $42 2014-2022 $69 n.a. n.a.<br />

84 O NN Oyster Point Rd Jefferson Ave Warwick Blvd 2.5 17% 34% Widening 4 6 $15 2022-2030 $33 46,330 F<br />

86 O NN Rte 60 relo. - east section- NN James City CL Ft Eustis Blvd 1.8 4% 39% New alignment 0 4 $23 2014-2022 $37 n.a. n.a.<br />

92 O NOR Brambleton Ave / I-264 Interchange n.a. n.a. 2.2 43% 99% Modify Interchange n.a. n.a. $65 2014-2022 $107 n.a. n.a.<br />

95 O NOR Church St / Wood St Brambleton Blvd St Paul's Blvd 1.4 56% 97% Widening 2 4 $9 2022-2030 $21 n.a. n.a.<br />

101 O NOR Little Creek Rd Tidewater Dr Azalea Garden Rd 3.4 8% 52% Widening 4 6 $34 2022-2030 $77 29,324 D<br />

104 O NOR Military Hwy Northampton Blvd Robin Hood Rd 1.9 11% 41% Widening 4 6 $68 2014-2022 $112 51,231 F<br />

108 O NOR Va. Beach Blvd (13) Military Circle entr. Newtown Rd 2.3 6% 26% Widening 4 / 6 8 $56 2014-2022 $92 36,304 D<br />

111 O POQ Wythe Creek Rd Alphus St <strong>Hampton</strong> CL n.a. 13% 4% Widening 2 4 $9 2022-2030 $20 13,991 D<br />

118 O PORT Turnpike Rd Portsmouth Blvd Constitution Ave 2.7 68% 99% Widening 2 4 $11 2022-2030 $25 10,781 D<br />

123 O SM Battery Park Rd S. Church St Nike Park Rd n.a. 7% 20% Widening 2 4 $13 2022-2030 $29 8,654 D<br />

126 O SUF Nansemond Pkwy - Portsmouth Blvd Shoulders Hill Rd Chesapeake CL 1.8 6% 49% Widening 2 4 $7 2014-2022 $12 11,171 C<br />

201 O Transit Bus Purchases, HRT n.a. n.a. n.a. n.a. n.a. 200 new buses n.a. n.a. n.a. 2022-2030 being developed n.a. n.a.<br />

204 O Transit Call and Ride (similar to previous Maxi Ride) n.a. n.a. n.a. n.a. n.a. O&M n.a. n.a. n.a. 2014-2022 being developed n.a. n.a.<br />

206 O Transit Ferry n.a. n.a. n.a. n.a. n.a. 8 new ferries n.a. n.a. n.a. 2022-2030 being developed n.a. n.a.<br />

Proj. Link<br />

2003 CMS<br />

LOS (18)<br />

<strong>Hampton</strong> <strong>Roads</strong> PDC, 4/4/2006<br />

2030 projects.xls<br />

43

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!