Methanisation plant – key technology<br />

Plant capacity 150 tm3/h SNG (power consumption 24 TWh/a)<br />

Cost estimation 100-180 Mio € (Based on simulation, sized Equipments, (costs for Piping, instrumentisation,<br />

engineering, labour costs , insurance, freight etc.) considered fac<strong>to</strong>rized approach)<br />

RWE <strong>Power</strong> AG • Liese SEITE 7