HUME CITY COUNCIL<br />
<strong>NATURAL</strong><br />
<strong>HERITAGE</strong><br />
<strong>STRATEGY</strong><br />
ACTION PLAN<br />
2011 – 2015<br />
www.hume.vic.gov.au
HUME CITY COUNCIL <strong>NATURAL</strong> <strong>HERITAGE</strong> <strong>STRATEGY</strong> ACTION PLAN 2011 - 2015
table of contents<br />
1. INTRODUCTION 3<br />
2. <strong>NATURAL</strong> <strong>HERITAGE</strong> GENERAL 4<br />
3. GEOLOGY AND GEOMORPHOLOGY 6<br />
4. NATIVE VEGETATION 8<br />
5. NATIVE FAUNA 16<br />
6. WATERWAYS 20<br />
7. MEASURING SUCCESS 24<br />
8. MEASUREMENT ACTIONS 28<br />
9. IMPLEMENTATION BUDGET 30<br />
MAPS 32<br />
MAP1:<br />
Current Environmental Significance and<br />
Vegetation Protection Overlays<br />
MAP 2: Degraded waterway stretches –<br />
Moonee Ponds and Yuroke Creeks, Westmeadows<br />
MAP 3: Degraded waterway stretches –<br />
Lower Aitken Creek, Craigieburn<br />
MAP 4: Degraded waterway stretches –<br />
Upper Blind Creek, Sunbury<br />
MAP 5:<br />
Flagship Areas, Biosites and Overlays<br />
HUME CITY COUNCIL <strong>NATURAL</strong> <strong>HERITAGE</strong> <strong>STRATEGY</strong> ACTION PLAN 2011 - 2015
HUME CITY COUNCIL <strong>NATURAL</strong> <strong>HERITAGE</strong> <strong>STRATEGY</strong> ACTION PLAN 2011 - 2015
1. INTRODUCTION<br />
<strong>Council</strong> has a strong commitment to the protection and enhancement of<br />
natural heritage assets in <strong>Hume</strong>. This commitment is embodied in the objectives<br />
of the <strong>Hume</strong> Plan 2030, the <strong>Hume</strong> <strong>Council</strong> Plan, Pathways to Sustainability:<br />
An Environmental Framework and the Natural Heritage Strategy 2011 – 2015<br />
(NHS 2011 - 2015).<br />
A four-year Action Plan has been developed to guide <strong>Council</strong> in achieving the<br />
goals and objectives of the NHS 2011 - 2015 under the following key themes:<br />
1. Natural Heritage General<br />
2. Geology & Geomorphology<br />
3. Native Vegetation<br />
4. Native Fauna<br />
5. Waterways<br />
The goals for each key theme reflect the roles and ability of <strong>Council</strong> to:<br />
• Demonstrate Excellence in Stewardship: achieving positive natural<br />
heritage outcomes through <strong>Council</strong>’s own actions.<br />
• Foster Community Learning & Action: the community becoming more<br />
aware of natural heritage assets and taking positive action to care for and<br />
maintain natural heritage sites.<br />
• Influence & Advocate: influencing the actions of other organisations<br />
and advocating to improve the policy and regulatory environment that<br />
supports natural heritage.<br />
The objectives and actions aim to address the key threats to Natural Heritage<br />
assets in <strong>Hume</strong> and the challenges facing <strong>Council</strong> in managing them.<br />
The Action Plan identifies the <strong>Council</strong> outputs and outcomes that will be<br />
measured to determine the success of the NHS 2011 - 2015. It also identifies the<br />
lead and supporting roles that <strong>Council</strong> departments will play in implementing<br />
the actions, and the financial investment required by <strong>Council</strong> to effectively<br />
implement the Action Plan and achieve positive change.<br />
HUME CITY COUNCIL <strong>NATURAL</strong> <strong>HERITAGE</strong> <strong>STRATEGY</strong> ACTION PLAN 2011 - 2015 3
<strong>NATURAL</strong> <strong>HERITAGE</strong> GENERAL<br />
GOAL: To Foster Community Learning and Action<br />
Objectives<br />
Action / Activity<br />
Key Performance Indicators<br />
(KPI’s) and Targets:<br />
KPI 1: Positive change in<br />
community awareness of natural<br />
heritage.<br />
Target 1: 40% increase in<br />
community awareness by 2015.<br />
Target 2: 150% increase in<br />
participation in the Greening<br />
Program.<br />
KPI 2: Positive change in<br />
community capacity to manage<br />
natural heritage.<br />
Target: 40% increase in<br />
community capacity to manage<br />
natural heritage by 2015.<br />
NH1 - Increase<br />
community knowledge<br />
and appreciation of<br />
natural heritage assets<br />
by:<br />
NH1.2<br />
Developing an Interpretation Strategy for<br />
natural heritage assets on <strong>Council</strong>-managed<br />
land.<br />
Note: Actions arising from the interpretation<br />
strategy, including signage, will require<br />
additional future capital investment.<br />
NH1.2<br />
Upgrading the Evans Street Grassland<br />
community meeting room to a natural heritage<br />
education centre and meeting space with<br />
educational and interpretive materials and<br />
displays. Promote the facility to local schools<br />
and community groups.<br />
NH1.3<br />
Encouraging participation by <strong>Hume</strong> residents,<br />
local schools, community groups, rural<br />
landowners, CaLD communities and businesses<br />
in natural heritage activities, including:<br />
• Environmental restoration projects through<br />
the Greening Program.<br />
• Live Green Workshops<br />
• Wildlife surveying and monitoring.<br />
NH1.4<br />
Developing a Natural Heritage Tourism Guide<br />
for the community.<br />
NH2 - Build the capacity<br />
of rural landowners,<br />
Landcare groups and<br />
Friends groups to protect<br />
and enhance natural<br />
heritage assets by:<br />
NH2.1<br />
Developing a Conservation and Land<br />
Management Guide.<br />
NH3 - Foster community<br />
leadership in natural<br />
heritage stewardship<br />
by:<br />
NH3.1<br />
Encouraging involvement of members of local<br />
Landcare and Friends groups and natural<br />
heritage / conservation students in the<br />
Champions Program.<br />
NH3.2<br />
Supporting one local school per year to<br />
undertake the Biodiversity Module of the<br />
Resource Smart Australian Sustainable Schools<br />
Initiative Victoria (RSS AuSSI Vic).<br />
4 HUME CITY COUNCIL <strong>NATURAL</strong> <strong>HERITAGE</strong> <strong>STRATEGY</strong> ACTION PLAN 2011 - 2015
Outcomes & Outputs<br />
Responsibility<br />
Complete<br />
Action by<br />
Budget<br />
• Natural Heritage Interpretation Strategy complete<br />
and ready to be implemented (output).<br />
• Increased community knowledge and appreciation<br />
of natural heritage (outcome).<br />
LEAD: Sustainable<br />
Environment<br />
SUPPORT: Parks & Open<br />
Spaces, Leisure, Subdivisions,<br />
Marketing & Communications,<br />
Research<br />
Jun 2013 $30,000<br />
• Evans Street Grassland meeting room upgraded<br />
(output).<br />
• Increased use of the facility by community groups<br />
and schools (outcome).<br />
LEAD: Sustainable<br />
Environment<br />
SUPPORT: Services<br />
Jun 2015 $40,000<br />
• More community members visiting natural heritage<br />
sites (outcome).<br />
• Increased community appreciation of natural<br />
heritage sites (outcome).<br />
Sustainable Environment Annually N/A<br />
• Natural Heritage Tourism Guide developed<br />
(output).<br />
• Natural Heritage Tourism Guide uploaded onto the<br />
<strong>Hume</strong> website and distributed (output).<br />
LEAD: Sustainable<br />
Environment<br />
SUPPORT: Economic<br />
Development, Organisational<br />
Planning and Improvement,<br />
Marketing & Communications<br />
Jun 2013 $5,000<br />
• Conservation and Land Management Guide<br />
developed (output).<br />
• Landowner knowledge and skills in natural<br />
heritage management improved (outcome).<br />
Sustainable Environment Dec 2012 $3,000<br />
(grant funded)<br />
• More natural heritage leadership within the <strong>Hume</strong><br />
community (outcome).<br />
Sustainable Environment Annually $29,725 over<br />
four years<br />
(Live Green<br />
Strategy)<br />
• Schools taking action to improve local biodiversity<br />
(outcome).<br />
Sustainable Environment Jun 2012, 2013,<br />
2014 and 2015<br />
$8,000<br />
($2,000 per<br />
year)<br />
HUME CITY COUNCIL <strong>NATURAL</strong> <strong>HERITAGE</strong> <strong>STRATEGY</strong> ACTION PLAN 2011 - 2015 5
GEOLOGY AND GEOMORPHOLOGY<br />
GOAL: To Demonstrate Excellence in Stewardship<br />
Objective<br />
Action / Activity<br />
Key Performance Indicators<br />
(KPI’s) and Targets:<br />
KPI 3: Strengthened statutory<br />
protection for significant<br />
geological sites and features.<br />
Target: All sites protected<br />
by relevant planning<br />
scheme controls.<br />
GG1 - Protect Sites<br />
of Geological and<br />
Geomorphological<br />
Significance, Scenic<br />
Hilltops and Major<br />
Ridgelines in <strong>Hume</strong><br />
by:<br />
GG1.1<br />
Undertaking a pre-feasibility study of all Scenic<br />
Hilltops and Major Ridgelines in <strong>Hume</strong> to<br />
determine:<br />
• which are priorities for protection.<br />
• whether or not the current 30m vertical<br />
buffer for hilltops and ridgelines and<br />
the 30m setback from escarpments in<br />
developments are appropriate to ensure<br />
their protection.<br />
GG1.2<br />
Undertaking a study to determine what sites<br />
<strong>Council</strong> considers significant from a geological<br />
and geomorphological basis, the features that<br />
contribute to this significance and the measures<br />
required to achieve this.<br />
GG1.3<br />
Subject to Actions GG1.1 & 1.2, investigating<br />
the use of planning scheme controls, such<br />
as a Significant Landscape Overlay, to<br />
enhance protection of Sites of Geological &<br />
Geomorphological Significance, Scenic Hilltops<br />
and Major Ridgelines.<br />
6 HUME CITY COUNCIL <strong>NATURAL</strong> <strong>HERITAGE</strong> <strong>STRATEGY</strong> ACTION PLAN 2011 - 2015
Outcomes & Outputs<br />
Responsibility<br />
Complete<br />
Action by<br />
Budget<br />
• Pre-feasibility study conducted (output). LEAD: Strategic Planning<br />
SUPPORT: Central Activities<br />
District and Urban Design,<br />
Sustainable Environment<br />
Jun 2013<br />
N/A<br />
• Study conducted (output).<br />
• Significant sites determined (output).<br />
LEAD: Sustainable<br />
Environment<br />
Jun 2013<br />
N/A<br />
SUPPORT: Strategic Planning<br />
• Appropriate planning scheme controls identified<br />
(output).<br />
• Increased protection for Sites of Geological and<br />
Geomorphological Significance, Scenic Hilltops and<br />
Major Ridgelines (outcome).<br />
LEAD: Strategic Planning<br />
SUPPORT: Sustainable<br />
Environment, Statutory<br />
Planning<br />
Dec 2013<br />
N/A<br />
HUME CITY COUNCIL <strong>NATURAL</strong> <strong>HERITAGE</strong> <strong>STRATEGY</strong> ACTION PLAN 2011 - 2015 7
NATIVE VEGETATION<br />
GOAL: To Demonstrate Excellence in Stewardship<br />
Objective<br />
Action / Activity<br />
Key Performance Indicators<br />
(KPI’s) and Targets:<br />
KPI 4: Increase in the quantity of<br />
remnant native vegetation within<br />
conservation areas on <strong>Council</strong>managed<br />
and private land<br />
Target: Mean 5% increase<br />
in native vegetation cover<br />
across all conservation areas.<br />
KPI 5: Increase in the extent<br />
of threatened flora species on<br />
<strong>Council</strong>-managed land.<br />
Target: 5% increase in the<br />
extent of threatened flora<br />
species.<br />
KPI 6: <strong>Council</strong>-managed<br />
conservation sites are strategically<br />
monitored and managed through<br />
Conservation Management Plans.<br />
Target: 7% increase in<br />
the number of Conservation<br />
Management Plans (CMP’s) and<br />
review 6% of existing CMP’s.<br />
NV1 - Increase the<br />
quality and quantity<br />
of native vegetation<br />
on private rural land<br />
by:<br />
NV2 - Increase the<br />
quality and quantity<br />
of native vegetation<br />
on <strong>Council</strong>-managed<br />
land by:<br />
NV1.1<br />
Fencing at least 20 hectares of private rural land<br />
to encourage natural regeneration of grassland<br />
and grassy woodland species through the<br />
Caring for our Plains grants project.<br />
NV1.2<br />
Continuing to donate indigenous plants<br />
through the Rural Areas Plant Donation<br />
Scheme (RAPDS) toward projects that facilitate<br />
vegetation corridors and stepping stones.<br />
NV2.1<br />
Continuing to revegetate <strong>Council</strong>-managed land<br />
through the Greening Program.<br />
NV2.2<br />
Continuing to manage all conservation sites on<br />
<strong>Council</strong>-managed land through activities such as<br />
control of environmental and declared noxious<br />
weeds and rabbits, revegetation and ecological<br />
burning.<br />
NV3.1<br />
Protecting and enhancing at least 225 hectares<br />
of native vegetation on private rural land by<br />
undertaking weed control through the Caring<br />
for our Plains project.<br />
KPI 7: Increase in the number of<br />
hectares of <strong>Council</strong>-owned land<br />
under permanent protection.<br />
Target: An additional 12<br />
hectares of <strong>Council</strong>-owned land<br />
permanently protected.<br />
NV3 – Protect<br />
remnant, native<br />
vegetation on<br />
private and <strong>Council</strong>managed<br />
land by:<br />
NV3.2<br />
Continuing proactive environmental compliance<br />
to prevent fill dumping and illegal vegetation<br />
removal on private land.<br />
NV3.3<br />
Encouraging and supporting landowners to<br />
permanently protect conservation areas on their<br />
land through the application of conservation<br />
covenants or <strong>Council</strong> Section 173 agreements.<br />
8 HUME CITY COUNCIL <strong>NATURAL</strong> <strong>HERITAGE</strong> <strong>STRATEGY</strong> ACTION PLAN 2011 - 2015
Outcomes & Outputs<br />
Responsibility<br />
Complete<br />
Action by<br />
Budget<br />
• 20 hectares of private rural land fenced (output).<br />
• Increase in the quality and quantity of native<br />
vegetation (outcome).<br />
LEAD: Sustainable<br />
Environment<br />
SUPPORT: Rural Landowners<br />
Dec 2013<br />
$90,000 (grant<br />
funded)<br />
• RAPDS implemented (output).<br />
• Increase in the quantity of native vegetation on<br />
private rural land (outcome).<br />
• Increased vegetation connectivity within the rural<br />
landscape (outcome).<br />
Sustainable Environment Annually $106,162 (over<br />
four years)<br />
• Greening Program implemented (output).<br />
• Increase in quantity of native vegetation on<br />
<strong>Council</strong>-managed land (outcome).<br />
Sustainable Environment Annually $318,240 (over<br />
four years)<br />
• Environmental and declared noxious weeds<br />
controlled at all conservation sites (output).<br />
• Rabbits controlled at priority sites (output).<br />
• Increase in the quality and extent of native<br />
vegetation on <strong>Council</strong>-managed land (outcome).<br />
LEAD: Parks and Open Spaces<br />
SUPPORT: Sustainable<br />
Environment<br />
Annually $5,945,050<br />
(Parks and<br />
Open Spaces<br />
recurrent<br />
budget over<br />
four years)<br />
• 225 hectares of private rural land protected from<br />
the threat of weeds (output).<br />
• Increase in the quality and extent of native<br />
vegetation on private rural land (outcome).<br />
Sustainable Environment Dec 2013 $105,000<br />
(grant funded)<br />
• Remnant native vegetation on private land<br />
protected from fill and removal (outcome).<br />
LEAD: Sustainable<br />
Environment<br />
Annually<br />
N/A<br />
SUPPORT: Statutory Planning<br />
• Increase in the amount of vegetated land in <strong>Hume</strong><br />
permanently protected (outcome).<br />
Sustainable Environment Annually N/A<br />
HUME CITY COUNCIL <strong>NATURAL</strong> <strong>HERITAGE</strong> <strong>STRATEGY</strong> ACTION PLAN 2011 - 2015 9
NATIVE VEGETATION CONTINUED<br />
Objective<br />
Action / Activity<br />
NV3.4<br />
Entering into on-title agreements to protect<br />
the following five key conservation sites likely<br />
to support offsets:<br />
1. Albert Rd Nature Reserve<br />
2. Rushwood Drive Reserve<br />
3. Stewarts Lane Nature Reserve<br />
4. Blind Creek Parklands<br />
5. Maygar Grey Box<br />
NV3.5<br />
Reviewing <strong>Council</strong>’s existing Vegetation<br />
Protection Overlays (VPO) and Environmental<br />
Significance Overlays (ESO) to ensure<br />
coverage of Flagship Areas and Biosites (Map<br />
5) and to identify other opportunities for<br />
improvements.<br />
NV3.6<br />
Subject to Action NV3.5, undertaking<br />
planning scheme amendments to ratify<br />
changes to VPO and ESO overlays.<br />
NV3 – Protect<br />
remnant, native<br />
vegetation on<br />
private and <strong>Council</strong>managed<br />
land by:<br />
NV3.7<br />
Developing a Native Vegetation Protection<br />
Policy to guide decisions in relation to native<br />
vegetation retention. It should include the<br />
following prescriptions:<br />
1. The protection of trees and patches of<br />
native vegetation in development areas,<br />
including protection and management<br />
regimes and identification of specific<br />
activities that are allowed to encroach<br />
within the area protected.<br />
2. A buffer requirement between developed<br />
areas and native vegetation.<br />
3. A requirement for an arborist report<br />
when development may pose a risk to<br />
native vegetation.<br />
NV3.8<br />
Developing guidelines to accompany the<br />
Native Vegetation Protection Policy that<br />
give direction to developers, contractors<br />
and <strong>Council</strong> works crews on how to ensure<br />
compliance with the <strong>Hume</strong> Planning Scheme<br />
and legislation when proposing on-ground<br />
works within or adjacent to native vegetation.<br />
Facilitate training in conjunction with the<br />
release of the guidelines.<br />
10 HUME CITY COUNCIL <strong>NATURAL</strong> <strong>HERITAGE</strong> <strong>STRATEGY</strong> ACTION PLAN 2011 - 2015
Outcomes & Outputs<br />
Responsibility<br />
Complete<br />
Action by<br />
Budget<br />
• On-title agreements developed and in place<br />
(output).<br />
• Native vegetation protected in perpetuity<br />
(outcome).<br />
• Development offsets secured for these sites<br />
(outcome).<br />
LEAD: Sustainable<br />
Environment<br />
SUPPORT: Parks and Open<br />
Spaces<br />
Jun 2013<br />
(sites 1 & 2)<br />
Jun 2014<br />
(sites 3 & 4)<br />
Jun 2015 (site 5)<br />
$75,000<br />
($15,000 per<br />
site)<br />
• Existing ESO and VPO reviewed (output). LEAD: Sustainable<br />
Environment<br />
Jun 2013<br />
N/A<br />
SUPPORT: Strategic Planning,<br />
Statutory Planning<br />
• Planning Scheme amendments undertaken<br />
(output).<br />
• Increased protection of native vegetation through<br />
the Planning Scheme (outcome).<br />
LEAD: Strategic Planning<br />
SUPPORT: Sustainable<br />
Environment, Statutory<br />
Planning<br />
Jun 2014<br />
N/A<br />
• Policy reviewed and updated (output).<br />
• Increased protection of native vegetation through<br />
the planning scheme (outcome).<br />
LEAD: Sustainable<br />
Environment<br />
SUPPORT: Strategic Planning<br />
Jun 2013<br />
N/A<br />
• Guidelines to accompany the Native Vegetation<br />
Protection Policy developed (output).<br />
• Training on the guidelines facilitated (output).<br />
• Developers, contractors and <strong>Council</strong> works crews<br />
working in accordance with the policy (outcome).<br />
Sustainable Environment Dec 2013 $5,000<br />
HUME CITY COUNCIL <strong>NATURAL</strong> <strong>HERITAGE</strong> <strong>STRATEGY</strong> ACTION PLAN 2011 - 2015 11
NATIVE VEGETATION CONTINUED<br />
Objective<br />
NV4 - Protect and<br />
enhance threatened<br />
flora species and<br />
communities by:<br />
Action / Activity<br />
NV4.1<br />
Developing an Action Plan for the reintroduction<br />
of rare or threatened species to high quality<br />
<strong>Council</strong>-managed conservation sites in <strong>Hume</strong>.<br />
NV5.1<br />
Developing Conservation Management Plans for<br />
the following very high and high priority sites:<br />
NV5 - Strategically<br />
manage conservation<br />
sites on <strong>Council</strong>managed<br />
land by:<br />
1. Evans Street Grassland<br />
2. Frog Court & Rushwood Drive<br />
3. Arcadia Way<br />
4. Greenvale Recreation Reserve<br />
5. Emu Valley Reserve<br />
6. Roadside Conservation Areas<br />
7. Mt Ridley<br />
8. Correa<br />
9. Sunbury Pop Festival Site<br />
10. Bulla Gold Tree Hill Reserve & Bulla School Hill.<br />
NV5.2<br />
Ranking the significance of all <strong>Council</strong>-managed<br />
conservation assets to assist in prioritising<br />
<strong>Council</strong>’s weed control, pest control, ecological<br />
burning, fencing and revegetation programs.<br />
NV6 - Strategically<br />
monitor conservation<br />
assets on <strong>Council</strong>managed<br />
land by:<br />
NV6.1<br />
Developing a suitable basic site monitoring<br />
approach that will enable the quality and<br />
quantity of native vegetation within <strong>Council</strong>managed<br />
conservation sites to be monitored.<br />
NV6.2<br />
Expand the Matted Flax-lily monitoring program<br />
to include all <strong>Council</strong>-managed sites that support<br />
this species.<br />
NV7 - Ensure the<br />
management of all<br />
<strong>Council</strong>-managed<br />
offset sites meet<br />
the legislative<br />
requirements of<br />
their Environmental<br />
Management Plans<br />
(EMP’s) by:<br />
NV7.1<br />
Auditing all <strong>Council</strong>-managed offset sites.<br />
12 HUME CITY COUNCIL <strong>NATURAL</strong> <strong>HERITAGE</strong> <strong>STRATEGY</strong> ACTION PLAN 2011 - 2015
Outcomes & Outputs<br />
Responsibility<br />
Complete<br />
Action by<br />
Budget<br />
• Reintroduction of Threatened Species Action Plan<br />
developed (output).<br />
• Conservation sites and threatened species and<br />
communities enhanced (outcome).<br />
LEAD: Parks and Open Spaces<br />
SUPPORT: Sustainable<br />
Environment<br />
Dec 2012<br />
N/A<br />
• Conservation Management Plans developed<br />
(output).<br />
• Conservation sites managed more strategically<br />
(outcome).<br />
LEAD: Parks and Open Spaces<br />
SUPPORT: Sustainable<br />
Environment<br />
Jun 2012 -<br />
sites 1-3<br />
Jun 2013 -<br />
sites 4-6<br />
$10,000<br />
(2011 – 12)<br />
$10,000<br />
(2012 – 13)<br />
Jun 2014 -<br />
sites 7-8<br />
$10,000<br />
(2013 – 14)<br />
Jun 2015 -<br />
sites 9-10<br />
$10,000<br />
(2014 – 15)<br />
• Ranking tool developed and applied to sites<br />
(output).<br />
• Improved planning and prioritisation of weed<br />
control, pest control, ecological burning, fencing<br />
and revegetation works on <strong>Council</strong>-managed<br />
conservation sites (outcome).<br />
LEAD: Sustainable<br />
Environment<br />
SUPPORT: Parks and Open<br />
Spaces<br />
Dec 2012<br />
N/A<br />
• Monitoring methodology investigated and<br />
developed (output).<br />
• All <strong>Council</strong>-managed assets monitored more<br />
strategically (outcome).<br />
LEAD: Parks and Open Spaces<br />
SUPPORT: Sustainable<br />
Environment<br />
Dec 2012<br />
N/A<br />
• Monitoring undertaken at all <strong>Council</strong>-managed<br />
sites supporting Matted Flax-lily (output).<br />
• Enhanced knowledge (within <strong>Council</strong>) of the<br />
distribution of Matted Flax-lily populations across<br />
<strong>Hume</strong> (outcome).<br />
Parks and Open Spaces Jun 2013 N/A<br />
• Annual audit of each offset site (output).<br />
• Compliance with legislative requirements of EMP’s<br />
determined (outcome).<br />
LEAD: Sustainable<br />
Environment<br />
SUPPORT: Parks and Open<br />
Spaces<br />
Annually<br />
N/A<br />
HUME CITY COUNCIL <strong>NATURAL</strong> <strong>HERITAGE</strong> <strong>STRATEGY</strong> ACTION PLAN 2011 - 2015 13
NATIVE VEGETATION CONTINUED<br />
GOAL: To Foster Community Learning and Action<br />
Objective<br />
Action / Activity<br />
Key Performance Indicators<br />
(KPI’s) and Targets:<br />
KPI 8: Positive change in<br />
community awareness of the value<br />
of native vegetation.<br />
Target: 40% increase in<br />
community awareness by 2015.<br />
NV8 - Raise<br />
community<br />
awareness about<br />
the value of native<br />
vegetation in <strong>Hume</strong><br />
by:<br />
NV8.1<br />
Developing and undertaking a community<br />
awareness campaign for grasslands in <strong>Hume</strong>,<br />
including the production of:<br />
• Educational materials (fact sheets and<br />
posters)<br />
• Media articles.<br />
NV8.2<br />
Publicising all prosecutions of illegal native<br />
vegetation removed in <strong>Hume</strong>.<br />
KPI 9: Positive change in<br />
community capacity to manage<br />
native vegetation.<br />
Target: 40% increase in<br />
community capacity to manage<br />
native vegetation by 2015.<br />
NV9 - Build the<br />
capacity of rural<br />
landowners to<br />
manage native<br />
vegetation on their<br />
land by:<br />
NV9.1<br />
Facilitating an annual training course / field day<br />
on native vegetation management through<br />
the Live Green Program. Priority topics should<br />
include:<br />
• Grazing management<br />
• Weed and pest animal control<br />
• Regeneration and revegetation<br />
• Plant identification<br />
GOAL: To Influence and Advocate<br />
Key Performance Indicators<br />
(KPI’s) and Targets:<br />
KPI 10: Increase in weed<br />
compliance in <strong>Hume</strong> by the State<br />
government.<br />
Objective<br />
NV10 - Protect<br />
native vegetation<br />
from the threat of<br />
weeds by:<br />
Action / Activity<br />
NV10.1<br />
Advocating to the DPI for more weed<br />
compliance and extension in <strong>Hume</strong>.<br />
Target: 20 annual DPI<br />
compliance inspections in<br />
<strong>Hume</strong> by 2015.<br />
14 HUME CITY COUNCIL <strong>NATURAL</strong> <strong>HERITAGE</strong> <strong>STRATEGY</strong> ACTION PLAN 2011 - 2015
Outcomes & Outputs<br />
Responsibility<br />
Complete<br />
Action by<br />
Budget<br />
• Awareness campaign materials developed and<br />
campaign undertaken (output).<br />
• Community more aware of the value of grasslands<br />
(outcome).<br />
LEAD: Sustainable<br />
Environment<br />
SUPPORT: Parks and Open<br />
Spaces, Marketing and<br />
Communications, Research<br />
Jun 2014 $10,000<br />
• All prosecutions publicised through local media<br />
and <strong>Council</strong> newsletters (output).<br />
• Increased community awareness about the<br />
consequences of native vegetation removal and<br />
the importance of its retention (outcome).<br />
LEAD: Sustainable<br />
Environment<br />
SUPPORT: Statutory<br />
Planning, Marketing and<br />
Communications<br />
Annually<br />
N/A<br />
• Annual training course / field day facilitated<br />
(output).<br />
• Increased knowledge of effective methodology<br />
for native vegetation management amongst rural<br />
landowners (outcome).<br />
Sustainable Environment Annually $8,000<br />
($2,000 per<br />
year)<br />
Outcomes & Outputs<br />
Responsibility<br />
Complete<br />
Action by<br />
Budget<br />
• Submissions and meeting requests with DPI made<br />
(output).<br />
• Increased weed extension and compliance in <strong>Hume</strong><br />
(outcome).<br />
Sustainable Environment Annually N/A<br />
HUME CITY COUNCIL <strong>NATURAL</strong> <strong>HERITAGE</strong> <strong>STRATEGY</strong> ACTION PLAN 2011 - 2015 15
NATIVE FAUNA<br />
GOAL: To Demonstrate Excellence in Stewardship<br />
Objective<br />
Action / Activity<br />
Key Performance Indicators<br />
(KPI’s) and Targets:<br />
KPI 11: Increase in knowledge<br />
of the distribution of local fauna<br />
populations.<br />
Target: 10 <strong>Council</strong>-managed<br />
conservation sites thoroughly<br />
surveyed.<br />
F1 - Improve<br />
<strong>Council</strong>’s knowledge<br />
of the distribution<br />
of local fauna<br />
populations by:<br />
F1.1<br />
Undertaking fauna surveying at the following<br />
key <strong>Council</strong>-managed conservation sites:<br />
1. Mt Holden Reserve<br />
2. Emu Bottom Wetlands and Emu Valley<br />
Reserves<br />
3. Albert Road Nature Reserve<br />
4. Mt Ridley Nature Reserve<br />
5. Sunbury Pop Festival Site<br />
6. Frog Crt & Rushwood Drive<br />
7. Martin Dillon Reserve<br />
8. Konagaderra Reserve<br />
Surveying to include:<br />
• Microbat trapping<br />
• Spotlight surveys<br />
• Reptile surveys<br />
• Diurnal bird surveys and owl call-playback<br />
• Small mammal trapping<br />
• Sensory camera<br />
F1.2<br />
Investigating mechanisms to undertake fauna<br />
surveying on private rural land and promoting<br />
them to rural landowners.<br />
F1.3<br />
Encouraging the community to record and<br />
submit all local fauna sightings to <strong>Council</strong>.<br />
Record all sightings on <strong>Council</strong>’s GIS.<br />
F2 - Improve<br />
<strong>Council</strong>’s response<br />
to incidences of<br />
negative humanwildlife<br />
interaction<br />
by:<br />
F2.1<br />
Developing a Living with Wildlife Policy.<br />
F3 - Seek to minimise<br />
the threat to native<br />
fauna in <strong>Hume</strong><br />
posed by foxes and<br />
domestic and feral<br />
cats by:<br />
F3.1<br />
Including information on responsible pet<br />
ownership (and associated domestic animal<br />
information) on <strong>Council</strong>’s website and in the<br />
Conservation and Land Management Guide.<br />
F3.2<br />
Investigating the viability of integrating fox and<br />
feral cat control in rural areas with the existing<br />
rabbit control program on <strong>Council</strong>-managed<br />
land. Implement fox and feral cat control if<br />
viable.<br />
16 HUME CITY COUNCIL <strong>NATURAL</strong> <strong>HERITAGE</strong> <strong>STRATEGY</strong> ACTION PLAN 2011 - 2015
Outcomes & Outputs<br />
Responsibility<br />
Complete<br />
Action by<br />
Budget<br />
• Fauna surveys undertaken (output).<br />
• Improved knowledge of the distribution of<br />
local fauna populations on <strong>Council</strong>-managed<br />
conservation sites (outcome).<br />
LEAD: Sustainable<br />
Environment<br />
SUPPORT: Parks and Open<br />
Spaces<br />
Sites 1-4 –<br />
Jun 2012<br />
Sites 5-8 –<br />
Jun 2014<br />
$40,000<br />
(2011 – 12)<br />
$30,000<br />
(2013 – 14)<br />
• Mechanisms to undertake fauna surveying on<br />
private land identified (output).<br />
• Mechanisms promoted to landowners and<br />
incentives offered, where practicable.<br />
Sustainable Environment Jun 2013 N/A<br />
• Promote community input via the website, Live<br />
Green workshops and newsletter articles (output).<br />
• Fauna sightings recorded on GIS (output).<br />
• Improved knowledge of the distribution of local<br />
fauna populations in <strong>Hume</strong> (outcome).<br />
Sustainable Environment Annually N/A<br />
• Policy developed (output).<br />
• Improved response to incidences of negative<br />
human-wildlife interaction (outcome).<br />
LEAD: Sustainable<br />
Environment<br />
Jun 2012<br />
N/A<br />
SUPPORT: Parks and Open<br />
Spaces, Marketing and<br />
Communications<br />
• Website content and information developed<br />
(output).<br />
• <strong>Hume</strong> residents more aware of the risk that their<br />
cats pose to native fauna (outcome).<br />
• More <strong>Hume</strong> residents managing their cats to<br />
protect native fauna (outcome).<br />
LEAD: Sustainable<br />
Environment<br />
SUPPORT: Services,<br />
Organisational Planning and<br />
Improvement, Marketing and<br />
Communications<br />
Jun 2014<br />
N/A<br />
• Viability of fox and feral cat control investigated<br />
(output).<br />
• Fox and feral cat control program established<br />
(output).<br />
Sustainable Environment Jun 2014 N/A<br />
HUME CITY COUNCIL <strong>NATURAL</strong> <strong>HERITAGE</strong> <strong>STRATEGY</strong> ACTION PLAN 2011 - 2015 17
NATIVE FAUNA CONTINUED<br />
GOAL: To Foster Community Learning and Action<br />
Objective<br />
Action / Activity<br />
Key Performance Indicators<br />
(KPI’s) and Targets:<br />
KPI 12: Positive change in<br />
community awareness of native<br />
fauna.<br />
Target 1: 40% increase in<br />
community awareness by<br />
2015.<br />
Target 2: 20% increase in<br />
fauna sightings reported by the<br />
community by 2015.<br />
F4 - Raise community<br />
awareness about<br />
native fauna in<br />
<strong>Hume</strong> by:<br />
F4.1<br />
Facilitating ‘Wildlife Experiences’ workshops<br />
through the Live Green Program each year.<br />
F4.2<br />
Encouraging community participation in native<br />
fauna surveying and monitoring programs<br />
facilitated by <strong>Council</strong>, Melbourne Water, Merri<br />
Creek Management Committee, Parks Victoria<br />
and other organisations.<br />
KPI 13: Positive change in<br />
community capacity to manage<br />
native fauna habitat.<br />
Target: 40% increase in<br />
community capacity to manage<br />
native fauna by 2015.<br />
F5 - Build the<br />
capacity of rural<br />
landowners to<br />
manage pest<br />
animals on their<br />
land by:<br />
F5.1<br />
Providing targeted information, training and<br />
incentives to landowners in accordance with the<br />
<strong>Hume</strong> Rabbit Action Plan.<br />
18 HUME CITY COUNCIL <strong>NATURAL</strong> <strong>HERITAGE</strong> <strong>STRATEGY</strong> ACTION PLAN 2011 - 2015
Outcomes & Outputs<br />
Responsibility<br />
Complete<br />
Action by<br />
Budget<br />
• At least two wildlife experiences workshop<br />
facilitated each year (output).<br />
• Increased community/participant awareness about<br />
native fauna (outcome).<br />
Sustainable Environment Biannually $12,000<br />
($3,000 per<br />
year)<br />
• Fauna activities promoted through community<br />
networks (output).<br />
• Increased community/participant awareness about<br />
native fauna (outcome).<br />
Sustainable Environment Annually N/A<br />
• Information, training and incentives provided to<br />
landowners (output).<br />
• Landowners more capable of undertaking pest<br />
animal control on their land (outcome).<br />
Sustainable Environment Annually N/A<br />
HUME CITY COUNCIL <strong>NATURAL</strong> <strong>HERITAGE</strong> <strong>STRATEGY</strong> ACTION PLAN 2011 - 2015 19
WATERWAYS<br />
GOAL: To Demonstrate Excellence in Stewardship<br />
Objective<br />
Action / Activity<br />
Key Performance Indicators<br />
(KPI’s) and Targets:<br />
KPI 14: Increase in the extent<br />
of native vegetation on <strong>Council</strong>managed<br />
land adjacent to<br />
waterways.<br />
Target: 10,000 indigenous<br />
plants recruited annually along<br />
waterways on <strong>Council</strong>managed<br />
land.<br />
KPI 15: Increase in the extent of<br />
native vegetation along waterways<br />
on private rural land.<br />
Target: 12,000 indigenous<br />
plants recruited annually along<br />
waterways on private land<br />
through the Rural Areas Plant<br />
Donation Scheme.<br />
W1 - Restore native<br />
vegetation along<br />
waterways on<br />
private and <strong>Council</strong>managed<br />
land by:<br />
W2 - Seek to mitigate<br />
soil erosion and<br />
sediment dispersal<br />
along waterways<br />
on <strong>Council</strong>-managed<br />
land by:<br />
W3 - Undertake<br />
catchment<br />
management in<br />
collaboration with<br />
other councils and<br />
organisations by:<br />
W1.1<br />
Undertaking restoration projects in the<br />
following degraded <strong>Council</strong>-managed sites<br />
through the Greening Program and capital<br />
works (Appendix 4):<br />
1. Yuroke and Moonee Ponds Creeks in<br />
Westmeadows<br />
2. Lower Aitken Creek<br />
3. Upper Blind Creek.<br />
W1.2<br />
Increasing resource allocation through the<br />
RAPDS to waterway restoration projects.<br />
W2.1<br />
Implementing priority actions from <strong>Council</strong>’s<br />
Erosion Mitigation Action Plan for Albert Road<br />
Nature Reserve and The Parkway Reserve, and<br />
applying these principles to other sites subject<br />
to erosion (including Mt Holden Reserve and<br />
Sunbury Landfill) where resources permit.<br />
W3.1<br />
Supporting the implementation of the Merri<br />
Creek and Environs Strategy 2009-2014 (MCES)<br />
and the Moonee Ponds Creek Strategic Plan<br />
2011 (MPCSP).<br />
W3.2<br />
Seeking a coordinated approach with Melbourne<br />
Water to restore degraded stretches of waterway<br />
adjacent to <strong>Council</strong>-managed land.<br />
W4 - Strengthen<br />
<strong>Council</strong> guidelines to<br />
enhance protection<br />
of waterways in<br />
<strong>Hume</strong> by:<br />
W4.1<br />
Developing the following prescriptions for<br />
inclusion in <strong>Council</strong>’s Guidelines for the Planning,<br />
Design and Construction of Open Space<br />
(GPDCOP):<br />
• buffer requirement between developed<br />
areas and areas of waterway environmental<br />
significance.<br />
• road frontage incorporated into the design<br />
of all new open space contributions along<br />
waterways.<br />
W4.2<br />
Ensuring that, when assessing planning permit<br />
applications, no development is allowed to occur<br />
within 35 metres of a creek or within the 100<br />
year flood level, whichever is greater.<br />
20 HUME CITY COUNCIL <strong>NATURAL</strong> <strong>HERITAGE</strong> <strong>STRATEGY</strong> ACTION PLAN 2011 - 2015
Outcomes & Outputs<br />
Responsibility<br />
Complete<br />
Action by<br />
Budget<br />
• Restoration projects undertaken (output).<br />
• Increase in the extent of native vegetation along<br />
waterways (outcome).<br />
LEAD: Sustainable<br />
Environment<br />
SUPPORT: Parks and Open<br />
Spaces<br />
Jun 2013 –<br />
sites 1 and 2<br />
Jun 2014 –<br />
site 2<br />
$20,000<br />
(2011 – 12)<br />
$40,000<br />
(2012 – 13)<br />
June 2015 –<br />
sites 2 and 3<br />
$40,000<br />
(2013 – 14)<br />
• Increased number of waterway restoration projects<br />
being undertaken (outcome).<br />
• Increased plant allocation to waterway projects<br />
(outcome).<br />
Sustainable Environment Annually Relates to<br />
NV1.2 budget<br />
• Priority actions identified and implemented<br />
(output).<br />
• Increased sediment retention at the sites<br />
(outcome).<br />
LEAD: Sustainable<br />
Environment<br />
SUPPORT: Parks and Open<br />
Spaces, Traffic and Civil Design<br />
Jun 2012 and<br />
Annually<br />
$40,000<br />
(2011 – 12)<br />
• <strong>Council</strong>s and organisations working collaboratively<br />
to implement priority catchment management<br />
actions (outcome).<br />
LEAD: Sustainable<br />
Environment<br />
SUPPORT: Parks and Open<br />
Spaces, Leisure, Strategic<br />
Planning<br />
Annually $414,030<br />
(MCES) over 4<br />
years<br />
• Request an annual meeting with Melbourne Water<br />
to coordinate works programs along waterways<br />
(output).<br />
• Strong collaboration with Melbourne Water<br />
(outcome).<br />
LEAD: Sustainable<br />
Environment<br />
SUPPORT: Parks and Open<br />
Spaces<br />
Annually<br />
N/A<br />
• Prescriptions developed and included in the<br />
GPDCOP (output).<br />
LEAD: Sustainable<br />
Environment<br />
Jun 2013<br />
N/A<br />
SUPPORT: Subdivisions,<br />
Leisure<br />
• No developments occurring within 35 metres of a<br />
creek or within the 100 year flood level (output).<br />
LEAD: Sustainable<br />
Environment<br />
Ongoing<br />
N/A<br />
SUPPORT: Statutory Planning<br />
HUME CITY COUNCIL <strong>NATURAL</strong> <strong>HERITAGE</strong> <strong>STRATEGY</strong> ACTION PLAN 2011 - 2015 21
WATERWAYS CONTINUED<br />
GOAL: To Foster Community Learning and Action<br />
Key Performance Indicators<br />
(KPI’s) and Targets:<br />
KPI 16: Positive change in<br />
community capacity to manage<br />
waterways.<br />
Target: 40% increase in<br />
community capacity to manage<br />
waterways by 2015.<br />
Objective<br />
W5 - Build the<br />
capacity of rural<br />
landowners to<br />
manage waterways<br />
on their land by:<br />
Action / Activity<br />
W5.1<br />
Facilitating a biennial workshop / field day on<br />
waterway management for rural landowners in<br />
<strong>Hume</strong> through the Live Green program.<br />
GOAL: To Influence and Advocate<br />
Key Performance Indicators<br />
(KPI’s) and Targets:<br />
KPI 17: Increase in the number of<br />
collaborative rabbit management<br />
projects between <strong>Council</strong> and<br />
Melbourne Water.<br />
Target: 20% of <strong>Council</strong>’s<br />
annual rabbit control works<br />
supported by complementary<br />
Melbourne Water rabbit<br />
management works by 2015.<br />
Objective<br />
W6 - Seek greater<br />
collaboration<br />
between <strong>Council</strong><br />
and government<br />
agencies in the<br />
management of<br />
rabbits:<br />
Action / Activity<br />
W6.1<br />
Advocating to Melbourne Water to better align<br />
rabbit harbour reduction works with <strong>Council</strong><br />
investment along waterways in <strong>Hume</strong>.<br />
22 HUME CITY COUNCIL <strong>NATURAL</strong> <strong>HERITAGE</strong> <strong>STRATEGY</strong> ACTION PLAN 2011 - 2015
Outcomes & Outputs<br />
Responsibility<br />
Complete<br />
Action by<br />
Budget<br />
• Biennial workshop / field day facilitated (output).<br />
• Rural landowners more capable of managing<br />
waterways effectively (outcome).<br />
Sustainable Environment Biannually $12,000<br />
($3,000 per<br />
year)<br />
Outcomes & Outputs<br />
Responsibility<br />
Complete<br />
Action by<br />
Budget<br />
• Submissions and meeting requests with Melbourne<br />
Water made (output).<br />
Sustainable Environment<br />
Jun 2012 and<br />
Ongoing<br />
N/A<br />
• Increased resource allocation to rabbit control in<br />
<strong>Hume</strong> (outcome).<br />
HUME CITY COUNCIL <strong>NATURAL</strong> <strong>HERITAGE</strong> <strong>STRATEGY</strong> ACTION PLAN 2011 - 2015 23
MEASURING SUCCESS<br />
To determine the success of this Action Plan, the Key Performance Indicators (KPI’s) will be measured using the following<br />
methodology. Complete baseline data is available for 6 of the 17 KPI’s. Where baseline results are not available, they will be<br />
collected in year one of the implementation of this strategy. Targets for each KPI have also been established to drive positive<br />
change.<br />
Objective<br />
Key Performance Indicator (KPI)<br />
Positive change in community awareness of<br />
natural heritage.<br />
KPI 1<br />
KPI 2<br />
Positive change in community capacity to<br />
manage natural heritage.<br />
KPI 3<br />
Strengthened statutory protection for significant<br />
geological sites and features.<br />
KPI 4<br />
Increase in the quantity of remnant native<br />
vegetation within conservation areas on<br />
<strong>Council</strong>-managed and private land.<br />
KPI 5<br />
Increase in the extent of threatened flora<br />
species.<br />
KPI 6<br />
<strong>Council</strong>-managed conservation sites are<br />
strategically monitored and managed through<br />
Conservation Management Plans.<br />
KPI 7<br />
Increase in the number of hectares of <strong>Council</strong>owned<br />
land under permanent protection.<br />
KPI 8<br />
Positive change in community awareness of the<br />
value of native vegetation.<br />
* Denotes baseline data collection requiring additional resources<br />
(see Measurement Actions)<br />
24 HUME CITY COUNCIL <strong>NATURAL</strong> <strong>HERITAGE</strong> <strong>STRATEGY</strong> ACTION PLAN 2011 - 2015
KPI Measure KPI Baseline Result KPI Target<br />
Surveys (pre and post event and<br />
program).<br />
Number of community members<br />
participating in annual natural heritage<br />
events.<br />
Baseline data on awareness to be<br />
collected as part of the implementation<br />
of this strategy.<br />
Number of participants in the Community<br />
Greening Program in 2010-11 was 309.<br />
40% increase in community awareness by<br />
2015.<br />
150% increase in participation in the<br />
Greening Program.<br />
Surveys (pre and post event and<br />
program).<br />
Baseline data on community capacity<br />
to be collected as part of the<br />
implementation of this strategy.<br />
40% increase in community capacity to<br />
manage natural heritage by 2015.<br />
Number of sites protected by relevant<br />
planning scheme controls.<br />
‘Guidelines for Development of Scenic<br />
Hilltops and Major Ridgelines Policy’<br />
currently in place.<br />
All sites protected by relevant planning<br />
scheme controls.<br />
Percentage cover of native vegetation<br />
within conservation areas.<br />
Baseline data on percentage cover of<br />
native vegetation to be collected as part<br />
of the implementation of this strategy. *<br />
Mean 5% increase in native vegetation<br />
cover across all conservation areas.<br />
Extent of threatened flora species on<br />
<strong>Council</strong>-managed conservation sites.<br />
Baseline data on current extent of<br />
threatened species to be collected as part<br />
of the implementation of this strategy. *<br />
5% increase in the extent of threatened<br />
flora species on <strong>Council</strong>-managed land.<br />
Percentage of Conservation<br />
Management Plans developed and<br />
reviewed.<br />
As of January 2011, a Conservation<br />
Management Plan had been developed<br />
for 60% of <strong>Council</strong>-managed<br />
conservation sites.<br />
7% increase in the number of<br />
Conservation Management Plans (CMP’s).<br />
Review 6% of existing CMP’s.<br />
Number of hectares of <strong>Council</strong>-owned<br />
land under permanent protection ontitle.<br />
Surveys (pre and post event and<br />
program).<br />
Number of community members<br />
participating in annual native<br />
vegetation training events.<br />
Four hectares of <strong>Council</strong>-owned land<br />
is currently protected under a Trust<br />
for Nature covenant at Evans Street<br />
Grassland.<br />
Baseline data on awareness to be<br />
collected as part of the implementation<br />
of this strategy.<br />
An additional 12 hectares of <strong>Council</strong>owned<br />
land permanently protected.<br />
40% increase in community awareness by<br />
2015.<br />
HUME CITY COUNCIL <strong>NATURAL</strong> <strong>HERITAGE</strong> <strong>STRATEGY</strong> ACTION PLAN 2011 - 2015 25
MEASURING SUCCESS CONTINUED<br />
Objective<br />
Key Performance Indicator (KPI)<br />
KPI 9<br />
Positive change in community capacity to<br />
manage native vegetation.<br />
KPI 10<br />
Increase in weed compliance in <strong>Hume</strong> by the<br />
State government.<br />
KPI 11<br />
Increase in knowledge of the distribution of<br />
local fauna populations.<br />
Positive change in community awareness of<br />
native fauna.<br />
KPI 12<br />
KPI 13<br />
Positive change in community capacity to<br />
manage native fauna habitat.<br />
KPI 14<br />
Increase in the extent of native vegetation on<br />
<strong>Council</strong>-managed land adjacent to waterways.<br />
Increase in the extent of native vegetation along<br />
waterways on private rural land.<br />
KPI 15<br />
KPI 16<br />
Positive change in community capacity to<br />
manage waterways.<br />
KPI 17<br />
Increase in the number of collaborative rabbit<br />
management projects between <strong>Council</strong> and<br />
Melbourne Water.<br />
26 HUME CITY COUNCIL <strong>NATURAL</strong> <strong>HERITAGE</strong> <strong>STRATEGY</strong> ACTION PLAN 2011 - 2015
KPI Measure KPI Baseline Result KPI Target<br />
Surveys (pre and post event and<br />
program).<br />
Baseline data on community capacity<br />
to be collected as part of the<br />
implementation of this strategy.<br />
40% increase in community capacity to<br />
manage native vegetation by 2015.<br />
Number of weed compliance<br />
inspections undertaken on private land<br />
in <strong>Hume</strong> by the Department of Primary<br />
Industries (DPI).<br />
Fauna surveying.<br />
In 2010-11, DPI did not undertake any<br />
compliance in <strong>Hume</strong>.<br />
Baseline data to be collected as part of<br />
the implementation of this strategy.<br />
20 annual DPI compliance inspections in<br />
<strong>Hume</strong> by 2015.<br />
10 <strong>Council</strong>-managed conservation sites<br />
thoroughly surveyed.<br />
Surveys (pre and post event and<br />
program).<br />
Number of fauna sightings reported by<br />
the community annually.<br />
Baseline data on awareness to be<br />
collected as part of the implementation<br />
of this strategy.<br />
In 2010-11, 28 fauna sightings were<br />
reported to <strong>Council</strong> by the community.<br />
40% increase in community awareness by<br />
2015.<br />
20% increase in fauna sightings reported<br />
by the community.<br />
Surveys (pre and post event and<br />
program).<br />
Baseline data on community capacity<br />
to be collected as part of the<br />
implementation of this strategy.<br />
40% increase in community capacity to<br />
manage native fauna by 2015.<br />
Number of indigenous plants recruited<br />
annually along waterways on <strong>Council</strong>managed<br />
land.<br />
In 2010-11, 5,833 plants were planted<br />
along waterways on <strong>Council</strong>-managed<br />
land through the Greening Program.<br />
10,000 indigenous plants recruited<br />
annually along waterways on <strong>Council</strong>managed<br />
land.<br />
Number of indigenous plants recruited<br />
annually along waterways on private<br />
rural land.<br />
In 2010-11, 11,762 plants were donated<br />
to rural landowners with land adjacent to<br />
waterways through <strong>Council</strong>’s Rural Areas<br />
Plant Donation Scheme.<br />
Baseline data on rural landowner<br />
revegetation of waterways through other<br />
sources to be collected as part of the<br />
implementation of this strategy.<br />
12,000 indigenous plants recruited<br />
annually along waterways on private land<br />
through the Rural Areas Plant Donation<br />
Scheme.<br />
Surveys (pre and post event and<br />
program).<br />
Baseline data on community capacity<br />
to be collected as part of the<br />
implementation of this strategy.<br />
40% increase in community capacity to<br />
manage waterways by 2015.<br />
Percentage of Melbourne Water rabbit<br />
management works aligned with<br />
<strong>Council</strong> rabbit control works.<br />
In 2010-11, no Melbourne Water rabbit<br />
management works were aligned with<br />
<strong>Council</strong> rabbit control works.<br />
20% of <strong>Council</strong>’s annual rabbit control<br />
works supported by complementary<br />
Melbourne Water rabbit management<br />
works by 2015.<br />
HUME CITY COUNCIL <strong>NATURAL</strong> <strong>HERITAGE</strong> <strong>STRATEGY</strong> ACTION PLAN 2011 - 2015 27
MEASUREMENT ACTIONS<br />
The following measurement actions have been developed to establish baseline data for Key Performance Objectives KPI4<br />
and KPI5. Once collected, these baseline data sources will complete the measurement framework for the NHS 2011-2015<br />
to ensure that benchmarking against future results is possible.<br />
To enable this baseline data to be collected, additional funding will be required by <strong>Council</strong> from year two of this Action<br />
Plan. To effectively monitor our performance over time, additional recurrent funding will be required by the Parks and<br />
Open Spaces Department.<br />
Objective<br />
Key Performance indicator (KPI)<br />
KPI 4<br />
Increase in the quantity of remnant native<br />
vegetation within conservation areas on<br />
<strong>Council</strong>-managed and private land.<br />
Increase in the extent of threatened flora<br />
species.<br />
KPI 5<br />
28 HUME CITY COUNCIL <strong>NATURAL</strong> <strong>HERITAGE</strong> <strong>STRATEGY</strong> ACTION PLAN 2011 - 2015
Action / Activity<br />
Responsibility<br />
Complete<br />
Action by<br />
Budget<br />
MA1<br />
Survey the percentage of native vegetation cover<br />
across all <strong>Council</strong>-managed conservation sites to<br />
establish baseline data.<br />
LEAD: Parks and Open<br />
Spaces<br />
SUPPORT: Sustainable<br />
Environment<br />
Jun 2013 $25,000<br />
(2012-13)<br />
MA2<br />
Undertake annual surveying of native vegetation<br />
percentage cover to monitor performance<br />
ongoing.<br />
Parks and Open Spaces Ongoing Recurrent<br />
funding<br />
from 2013-<br />
14 onward,<br />
including:<br />
$26,000<br />
(2013-14)<br />
$27,040<br />
(2014-15)<br />
MA3<br />
Survey the extent of threatened species<br />
populations on <strong>Council</strong>-managed conservation<br />
sites to establish baseline data.<br />
LEAD: Parks and Open<br />
Spaces<br />
SUPPORT: Sustainable<br />
Environment<br />
Jun 2013 $8,000<br />
(2012-13)<br />
MA4<br />
Undertake annual surveying of threatened species<br />
extent to monitor performance ongoing.<br />
Parks and Open Spaces Ongoing Recurrent<br />
funding<br />
from 2013-<br />
14 onward,<br />
including:<br />
$8,320<br />
(2013-14)<br />
$8,653<br />
(2014-15)<br />
HUME CITY COUNCIL <strong>NATURAL</strong> <strong>HERITAGE</strong> <strong>STRATEGY</strong> ACTION PLAN 2011 - 2015 29
IMPLEMENTATION BUDGET<br />
The Action Plan will be funded through the Sustainable Environment Department recurrent budget with support from<br />
the Parks and Open Spaces Department recurrent budget and grant funding. The following table outlines the funding<br />
required to implement the Action Plan, the funding source required for each action and the implementation timeframe.<br />
A projected CPI increase has been included for actions being funded through recurrent budgets over the four years.<br />
Action Total Budget Source<br />
NH1.1 $30,000 Sustainable Environment recurrent budget<br />
NH1.2 $40,000 Sustainable Environment recurrent budget<br />
NH1.3<br />
N/A<br />
NH1.4 $5,000 Sustainable Environment recurrent budget<br />
NH2.1 $3,000 Caring for our Country grant<br />
NH3.1 $29,725 Sustainable Environment recurrent budget<br />
NH3.2 $8,000 Sustainable Environment recurrent budget<br />
GG1.1<br />
N/A<br />
GG1.2<br />
N/A<br />
GG1.3<br />
N/A<br />
NV1.1 $90,000 Caring for our Country grant<br />
NV1.2 $106,162 Sustainable Environment recurrent budget<br />
NV2.1 $318,240 Sustainable Environment recurrent budget<br />
NV2.2 $5,945,050 Parks and Open Spaces recurrent budget<br />
NV3.1 $105,000 Caring for our Country grant<br />
NV3.2<br />
N/A<br />
NV3.3<br />
N/A<br />
NV3.4 $75,000 Additional funding requested from 2012-13<br />
NV3.5<br />
N/A<br />
NV3.6<br />
N/A<br />
NV3.7<br />
N/A<br />
NV3.8 $5,000<br />
NV4.1<br />
N/A<br />
NV5.1 $40,000 Parks and Open Spaces recurrent budget<br />
NV5.2<br />
N/A<br />
NV6.1<br />
N/A<br />
NV6.2<br />
N/A<br />
NV7.1<br />
N/A<br />
NV8.1 $10,000 Sustainable Environment recurrent budget<br />
NV8.2<br />
N/A<br />
NV9.1 $8,000 Sustainable Environment recurrent budget<br />
NV10.1<br />
N/A<br />
NV11.1<br />
N/A<br />
F1.1 $70,000 Sustainable Environment recurrent budget<br />
F1.2 N/A<br />
F1.3 N/A<br />
F2.1 N/A<br />
F3.1 N/A<br />
F3.2 N/A<br />
F4.1 $12,000 Sustainable Environment recurrent budget<br />
F4.2 N/A<br />
F5.1 N/A<br />
W1.1 $100,000 Melbourne Water Corridors of Green<br />
W1.2 N/A<br />
W2.1 $40,000 Capital Works Program 2011 - 2012<br />
W3.1 $414,030 Sustainable Environment recurrent budget<br />
W3.2 N/A<br />
W4.1 N/A<br />
W4.2 N/A<br />
W5.1 $4,000 Sustainable Environment recurrent budget<br />
W6.1 N/A<br />
MA1 $25,000 Additional funding requested for 2012-13<br />
MA2 $53,040 Additional recurrent funding requested from 2013-14<br />
MA3 $8,000 Additional funding requested for 2012-13<br />
MA4 $16,973 Additional recurrent funding requested from 2013-14<br />
30 HUME CITY COUNCIL <strong>NATURAL</strong> <strong>HERITAGE</strong> <strong>STRATEGY</strong> ACTION PLAN 2011 - 2015
2011 – 2012 2012 – 2013 2013 – 2014 2014 - 2015<br />
Dec June Dec June Dec June Dec June<br />
$7,000 $7,280 $7,571 $7,874<br />
$2,000 $2,000 $2,000 $2,000<br />
$25,000 $26,000 $27,040 $28,122<br />
$78,000 $78,000 $81,120 $81,120<br />
$1,400,000 $1,456,000 $1,514,240 $1,574,810<br />
$30,000 $30,000 $15,000<br />
$10,000 $10,000 $10,000 $10,000<br />
$2,000 $2,000 $2,000 $2,000<br />
$40,000 $30,000<br />
$3,000 $3,000 $3,000 $3,000<br />
$20,000 $40,000 $40,000<br />
$97,500 $101,400 $105,456 $109,674<br />
$2,000 $2,000<br />
$26,000 $27,040<br />
$8,320 $8,653<br />
HUME CITY COUNCIL <strong>NATURAL</strong> <strong>HERITAGE</strong> <strong>STRATEGY</strong> ACTION PLAN 2011 - 2015 31
9<br />
72<br />
19<br />
16 71<br />
3<br />
11<br />
21<br />
10<br />
12<br />
25<br />
24<br />
Urban Growth Boundary<br />
Crown Vegetation Owned Protection Overlay<br />
20<br />
18<br />
5<br />
14<br />
13<br />
2<br />
17<br />
4<br />
27<br />
Environmental Significance Overlay<br />
22<br />
26<br />
8<br />
1<br />
28<br />
15<br />
7<br />
6<br />
29<br />
23<br />
30<br />
Map 1 Environmental Significance and Vegetation Protection Overlays<br />
Land Ownership<br />
<strong>Council</strong> Owned<br />
48<br />
50<br />
47<br />
49<br />
53<br />
55<br />
51<br />
MAP 1: ENVIRONMENTAL SIGNIFICANCE AND<br />
VEGETATION PROTECTION OVERLAYS<br />
38<br />
31<br />
32<br />
33<br />
34<br />
35<br />
68<br />
36<br />
52<br />
37<br />
69<br />
44<br />
70<br />
46<br />
42<br />
43<br />
45<br />
40<br />
39<br />
54<br />
67<br />
60<br />
58<br />
66<br />
65<br />
57<br />
64<br />
_<br />
1:150,000<br />
_<br />
1:150,00<br />
32 HUME CITY COUNCIL <strong>NATURAL</strong> <strong>HERITAGE</strong> <strong>STRATEGY</strong> ACTION PLAN 2011 - 2015
PASCOE VALE ROAD<br />
JOHNSTONE STREET<br />
MICKLEHAM ROAD<br />
9<br />
72<br />
19<br />
16 71<br />
3<br />
11<br />
Moonee Ponds Creek<br />
22<br />
25<br />
26<br />
Waterway<br />
Crown Degraded Owned Riparian Zone<br />
10<br />
20<br />
21<br />
18<br />
5<br />
12<br />
14<br />
13<br />
24 2<br />
17<br />
4<br />
27<br />
8<br />
1<br />
28<br />
15<br />
7<br />
6<br />
29<br />
23<br />
47<br />
30<br />
48<br />
49<br />
50<br />
Map 2 Waterway Restoration Priority Areas - Moonee Ponds and Yuroke Creek<br />
Land Ownership<br />
MAP 2: WATERWAY RESTORATION PRIORITY AREAS –<br />
MOONEE PONDS AND YUROKE CREEK<br />
38<br />
31<br />
32<br />
33<br />
Yuroke Creek<br />
35<br />
53<br />
68<br />
36<br />
52<br />
37<br />
69<br />
70<br />
44<br />
34<br />
46<br />
42<br />
51<br />
43<br />
45<br />
40<br />
39<br />
55<br />
54<br />
67<br />
58<br />
66<br />
57<br />
_<br />
1:150,000<br />
_<br />
1:15,000<br />
HUME CITY COUNCIL <strong>NATURAL</strong> <strong>HERITAGE</strong> <strong>STRATEGY</strong> ACTION PLAN 2011 - 2015 33
HARPER CLOSE<br />
CRAIGIEBURN-HUME RAMP ON<br />
HUME HIGHWAY<br />
HUME HIGHWAY<br />
POTTER STREET<br />
ALDBROUGH ROAD<br />
STOCKTON STREET<br />
EASTGATE ROAD<br />
9<br />
72<br />
19<br />
16 71<br />
3<br />
11<br />
22<br />
26<br />
21<br />
10<br />
12<br />
25<br />
24<br />
20<br />
18<br />
13<br />
2<br />
4<br />
1<br />
28<br />
5<br />
14<br />
15<br />
17<br />
7<br />
27<br />
Waterway<br />
Crown Owned<br />
Degraded Riparian Zone<br />
8<br />
23<br />
MITFORD CRESCENT<br />
Map 3 Waterway Restoration Priority Areas - Aitken Creek<br />
Land Ownership<br />
<strong>Council</strong> Owned<br />
6<br />
30<br />
29<br />
48<br />
50<br />
MAP 3: WATERWAY RESTORATION PRIORITY AREAS –<br />
AITKEN CREEK<br />
38<br />
31<br />
32<br />
33<br />
34<br />
53<br />
Aitken Creek<br />
35<br />
68<br />
36<br />
52<br />
37<br />
69<br />
51<br />
47<br />
70<br />
46<br />
44<br />
42<br />
43<br />
45<br />
40<br />
39<br />
49<br />
55<br />
54<br />
67<br />
60<br />
58<br />
66<br />
65<br />
57<br />
64<br />
_<br />
1:150,000<br />
_<br />
1:2,500<br />
34 HUME CITY COUNCIL <strong>NATURAL</strong> <strong>HERITAGE</strong> <strong>STRATEGY</strong> ACTION PLAN 2011 - 2015
RIDDELL ROAD<br />
OLD RIDDELL ROAD<br />
RETREAT CRESCENT<br />
BANNON AVENUE<br />
LEWIS PLACE<br />
BECKVIEW CRESCENT<br />
COURTNEY DRIVE<br />
JAMES CLOSE<br />
MEARE STREET<br />
PHILLIP DRIVE<br />
Upper Blind Creek<br />
9<br />
72<br />
19<br />
16 71<br />
3<br />
11<br />
Waterway<br />
Crown Degraded Owned Riparian Zone<br />
22<br />
26<br />
21<br />
10<br />
12<br />
25<br />
24<br />
20<br />
18<br />
5<br />
14<br />
13<br />
2<br />
17<br />
4<br />
27<br />
8<br />
1<br />
28<br />
15<br />
7<br />
6<br />
23<br />
30<br />
Map 4 Waterway Restoration Priority Areas - Upper Blind Creek<br />
Land Ownership<br />
29<br />
48<br />
50<br />
47<br />
49<br />
MAP 4: WATERWAY RESTORATION PRIORITY AREAS –<br />
UPPER BLIND CREEK<br />
38<br />
53<br />
52<br />
36<br />
68<br />
69<br />
44<br />
35<br />
70<br />
37<br />
31<br />
34<br />
46<br />
32<br />
33<br />
42<br />
43<br />
45<br />
51<br />
55<br />
54<br />
40<br />
39<br />
67<br />
58<br />
66<br />
57<br />
_<br />
1:150,000<br />
_<br />
1:5,000<br />
HUME CITY COUNCIL <strong>NATURAL</strong> <strong>HERITAGE</strong> <strong>STRATEGY</strong> ACTION PLAN 2011 - 2015 35
9<br />
19<br />
16<br />
3<br />
11<br />
Flagship Area<br />
Flagship<br />
Habitat Corridor<br />
Biosites and Significance Level<br />
Yet to be determined<br />
Crown Owned<br />
Local<br />
Regional<br />
State<br />
National<br />
Current Overlays<br />
21<br />
10<br />
12<br />
25<br />
24<br />
Vegetation Protection Overlay<br />
West Sunbury<br />
20<br />
18<br />
5<br />
13<br />
Environmental Significance Overlay<br />
22<br />
26<br />
2<br />
17<br />
4<br />
Map 5 - Flagship Areas, Biosites and Overlays<br />
Land Ownership<br />
<strong>Council</strong> Owned<br />
14<br />
27<br />
8<br />
72<br />
15<br />
71<br />
1<br />
23<br />
28<br />
7<br />
6<br />
30<br />
29<br />
48<br />
50<br />
47<br />
49<br />
MAP 5: FLAGSHIP AREAS, BIOSITES AND OVERLAYS<br />
38<br />
31<br />
32<br />
33<br />
34<br />
35<br />
53<br />
68<br />
36<br />
52<br />
37<br />
69<br />
44<br />
70<br />
46<br />
42<br />
51<br />
43<br />
45<br />
40<br />
39<br />
55<br />
54<br />
67<br />
60<br />
58<br />
66<br />
65<br />
57<br />
64<br />
_<br />
1:150,000<br />
_<br />
1:150,000<br />
36 HUME CITY COUNCIL <strong>NATURAL</strong> <strong>HERITAGE</strong> <strong>STRATEGY</strong> ACTION PLAN 2011 - 2015
<strong>Hume</strong> <strong>City</strong> <strong>Council</strong><br />
1079 Pascoe Vale Road, Broadmeadows<br />
PO Box 119, Dallas, Victoria 3047<br />
Telephone 9205 2200 Facsimile 9309 0109<br />
contactus@hume.vic.gov.au<br />
www.hume.vic.gov.au