16.01.2014 Views

Team Blue - HydroAsia

Team Blue - HydroAsia

Team Blue - HydroAsia

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Working Flow – <strong>Team</strong> <strong>Blue</strong><br />

- Water Level at<br />

each node<br />

- Link water<br />

level, discharge,<br />

and velocity<br />

- Flood extent<br />

and flood depth,<br />

etc.<br />

General Analysis<br />

Data Collection<br />

Analysis of the collected data<br />

Model Choosing and Setup<br />

Calibration and Validation of<br />

model parameters<br />

Evaluation of the existing<br />

drainage capacity of the system<br />

- Hydrologic & Hydraulic Data: Rainfall, rain<br />

gauge coordinates, gate and pump operation,<br />

retention pond condition, etc.<br />

- Catchment Data: Coordinates, area,<br />

impervious area, population, time of<br />

concentration, Length, hydrological losses for<br />

the individual catchment, Manning number,<br />

land use type, etc.<br />

- Links: Material (Manning number),<br />

longitudinal profile, Cross section data (shape,<br />

size)<br />

- Nodes: manholes, basins, outlets,<br />

- Road system, building system<br />

- Available GIS Digital Map (0bserved flood<br />

inundation map, etc.)<br />

Design and examine technical<br />

solutions for flood alleviation<br />

Results and Recommendations

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!