G - Chapter 9 - 30<br />

b) Mechanised Method (230)<br />

This activity is suggested where long sections of V- shaped ditches are to<br />

be maintained and cleaned and where high daily outputs are possible. The<br />

activity may be carried out by a motor or towed grader. The grader should<br />

always work by cutting in the direction of water flow in the ditch.<br />