Design-Manual-for-Low-Volume-Roads-Part-G
Design-Manual-for-Low-Volume-Roads-Part-G
Design-Manual-for-Low-Volume-Roads-Part-G
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
G - Chapter 9 - 30<br />
b) Mechanised Method (230)<br />
This activity is suggested where long sections of V- shaped ditches are to<br />
be maintained and cleaned and where high daily outputs are possible. The<br />
activity may be carried out by a motor or towed grader. The grader should<br />
always work by cutting in the direction of water flow in the ditch.<br />
PART G: WEREDA ROAD MAINTENANCE BOOKLET