Securely fix and permanently shut all doors<br />

that do not have a locking mechanism. Ensure<br />

all gaps to existing doors on <strong>the</strong> perimeter are<br />

sealed with Heavy Duty Aluminium Rein<strong>for</strong>ced<br />

Lagging Tape.<br />

Windows<br />

Remove two window panels to North facing<br />

wall and replace with temporary Pyneboard<br />

Infill. Cut board to allow tight fitting <strong>of</strong><br />

extraction fan by o<strong>the</strong>rs. Seal all gaps.<br />

Airlock<br />

Provide an airlock to North/South corridor<br />

leading to Proposed <strong>Construction</strong> Lift using two<br />

plastic swing doors (provided by Hospital) in<br />

locations to be determined.<br />

Make Good<br />

Allow <strong>for</strong> making good <strong>of</strong> any disturbance<br />

caused by <strong>the</strong> alterations and additions.<br />

7. PROVISIONAL SUMS<br />

Allow <strong>the</strong> Provisional Sum <strong>of</strong> $2,000 <strong>for</strong><br />

purchase <strong>of</strong> a HEPA filter vacuum cleaner to<br />

hospital specifications. This vacuum cleaner<br />

is to remain on site and in <strong>the</strong> control <strong>of</strong> <strong>the</strong><br />

Contractor <strong>for</strong> <strong>the</strong> duration <strong>of</strong> <strong>the</strong> Contract. It<br />

shall be handed over at no additional cost to<br />

<strong>the</strong> Proprietor at Practical Completion.<br />

Allow <strong>the</strong> Provisional Sum <strong>of</strong> $6,500 <strong>for</strong> <strong>the</strong><br />

purchase <strong>of</strong> a HEPA filter negative air unit to<br />

hospital specifications. This unit is to remain<br />

on site and in <strong>the</strong> control <strong>of</strong> <strong>the</strong> Contractor <strong>for</strong><br />

<strong>the</strong> duration <strong>of</strong> <strong>the</strong> Contract. It shall be handed<br />

over at no additional cost to <strong>the</strong> Proprietor at<br />

Practical Completion.<br />