24.01.2014 Views

Download - IHO

Download - IHO

Download - IHO

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

41<br />

An improved version of the guidelines was completed during the meeting and was subsequently<br />

adopted by the <strong>IHO</strong> as <strong>IHO</strong> document C-17 - Spatial Data Infrastructures: “The Marine Dimension” -<br />

Guidance for Hydrographic Offices.<br />

The meeting also discussed an MSDI Capacity Building plan and an MSDI Stakeholders Involvement<br />

plan.<br />

3rd INTERNATIONAL ECDIS CONFERENCE<br />

Singapore, 19-21 October<br />

The 3rd International ECDIS Conference was held in Singapore from 15-17 October 2009. Captain<br />

WARD presented the keynote speech. The conference concentrated on the forthcoming requirement for<br />

an increasing number of vessels to use ECDIS for navigation.<br />

Over 300 delegates heard a range of views and experiences from mariners and shipping companies<br />

already using ECDIS. The consistent message that they delivered was: ECDIS improves navigation<br />

safety, is welcomed by mariners and it saves money. Their principal words of caution were that<br />

mariners must be properly trained to use ECDIS.<br />

S-52 REVISION MEETING<br />

IHB, Monaco, 26-27 March<br />

An ad hoc group of the <strong>IHO</strong> Digital Information Portrayal Working Group (DIPWG) met at the IHB,<br />

on 26-27 March 2009, to undertake a revision of <strong>IHO</strong> Publication S-52: “Specifications for Chart<br />

Content and Display Aspects of ECDIS”. CHRIS-20 (Niterói, Brazil, November 2008) directed<br />

DIPWG to “undertake a revision of S-52, including all annexes” in order to take account of the<br />

adoption by IMO in December 2006 of revised Performance Standards for ECDIS and the transfer of<br />

S-52 Appendix 3 Glossary of ECDIS-related to the <strong>IHO</strong> Hydrographic Dictionary S-32, and with a<br />

view to simplifying S-52.<br />

The group identified all operational specifications of the existing S-52 (main part) which were moved<br />

to the IMO PS for ECDIS and undertook to develop a single document incorporating the existing<br />

Appendix 2 of S-52 ECDIS Colours & Symbols Specifications and the remaining specifications of S-<br />

52 on chart content. The resulting document, entitled S-52: Specifications for Chart Content and<br />

Display Aspects of ECDIS which focusses on ECDIS portrayal aspects, was submitted to the<br />

Hydrographic Services and Standards Committee (HSSC) at its inaugural meeting in Singapore in<br />

October 2009. The <strong>IHO</strong> Presentation Library for ECDIS will become an annex to the revised S-52.<br />

The group did not revise Appendix 1 Guidance on Updating the ENC, as the recently formed ENC<br />

Updating Working Group (EUWG) was already tasked to review this document.<br />

1st MEETING OF THE TIDAL AND WATER LEVEL WORKING GROUP (TWLWG)<br />

Rio de Janeiro, Brazil, 30 March – 1 April<br />

The 1st meeting of the TWLWG was held in Niteroi, Rio de Janeiro, Brazil from 30 March to 1 April<br />

2009. Representatives from Australia, Brazil, Canada, Chile, Finland, France, Norway, Portugal,<br />

Spain, UK, USA, Venezuela and the IHB attended the meeting. Mr. PILLICH, Expert Contributor, and<br />

Cdr. CAVALCANTE, IOC/GLOSS observer, also attended.<br />

Captain TORRES, on behalf of VAdm. PALMER FONSECA, the Brazilian Director of Hydrography and<br />

Navigation, opened the meeting. He commented on the valuable assistance on tidal matters that Brazil<br />

had received from WG Member States following Brazil‟s first attendance at the former Tidal<br />

Committee meeting in Canada in 2007. Mr. GILL (USA) welcomed delegates to his first meeting as<br />

Chair.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!