03.02.2014 Views

Explorer Vision - THORN Lighting

Explorer Vision - THORN Lighting

Explorer Vision - THORN Lighting

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SelfTest<br />

Project<br />

<strong>Vision</strong><br />

1. Touch screen<br />

Used to operate the system.<br />

The screens are intuitively<br />

arranged for easy use. This first<br />

screen gives access to the quick<br />

menu or other pages to input data,<br />

display test results and so on.<br />

2 and 3. Testing<br />

Automatic tests normally run<br />

once a week. When a manual<br />

or duration test is required, it<br />

can be selected here. The block<br />

feature is used when selected<br />

luminaires (in sensitive areas<br />

such as operating theatres)<br />

should only be tested manually.<br />

4. Addressing<br />

Luminaires are addressed on<br />

site after installation. No special<br />

programming is required, making<br />

the process quick and reliable,<br />

with no logistical problems.<br />

5. Assigning relays and GSM<br />

Relays can be selected to operate<br />

according to the type of test or<br />

fault. GSM operations are also<br />

configured here.<br />

Summary of benefits<br />

• Performs all of the testing and<br />

records the results<br />

• Cost effective compliance with<br />

emergency lighting testing<br />

regulations<br />

• Test results stored for 2 years<br />

• <strong>Explorer</strong> Project is for up to<br />

256 emergency luminaires<br />

• XP300m+ gives additional<br />

wiring distance<br />

1.<br />

2.<br />

3.<br />

4.<br />

Test<br />

Funct. test Duration test Relay<br />

all groups similar<br />

Start function test<br />

every Thur, Fri<br />

at<br />

start function test now ...<br />

also see test book<br />

Luminaires<br />

Address<br />

Check Callibration<br />

Luminaire address group 1 (10 luminaires)<br />

location:<br />

Tue, 10.02.2004 16:52<br />

<strong>Explorer</strong> Project XP128<br />

Last test result:<br />

OK<br />

logical<br />

address:<br />

auto-search . . .<br />

< Previous<br />

16 : 00 : 00 oclock.<br />

Quick Menu<br />

BLOCK system . . .<br />

Start function test . . .<br />

Start duration test . . .<br />

1<br />

Floor 1, north entry<br />

Next ><br />

Relaybuzzer<br />

Assignments<br />

Status<br />

Factory settings<br />

OK<br />

Lamp fault<br />

Battery fault<br />

Comm. problem<br />

Test error, time out<br />

Func. test running<br />

Relay 1<br />

Relay 2<br />

Relay 3<br />

Buzzer<br />

assign<br />

GSM<br />

info<br />

?<br />

info<br />

?<br />

Cancel<br />

Ass<br />

?<br />

?<br />

5.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!