04.02.2014 Views

Jubilee field development The story so far (PDF - Tullow Oil plc

Jubilee field development The story so far (PDF - Tullow Oil plc

Jubilee field development The story so far (PDF - Tullow Oil plc

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Jubilee</strong> <strong>development</strong> project continued<br />

By delivering first oil in the fourth quarter of 2010, the project<br />

will have realised production in just 3½ years from discovery.<br />

This achievement is a reflection of the confidence and commitment<br />

by all partners to invest based on discovery and appraisal well<br />

results alone.<br />

A highly experienced project team, comprised of per<strong>so</strong>nnel<br />

from the main partners including <strong>Tullow</strong>, Anadarko Petroleum and<br />

led by Technical Operator Kosmos Energy, has set out to deliver a<br />

quality outcome in record time. Proven contractors have used<br />

proven designs to meet functional rather than truly precise<br />

specifications. This has resulted in <strong>so</strong>me quite dramatic schedule<br />

reductions when benchmarked to general industry performance.<br />

Key contractors involved in the facilities delivery include MODEC<br />

Inc. (Floating Production Storage and Offloading vessel (FPSO)),<br />

Technip (flowlines, risers and installation), FMC and Aker Solutions.<br />

04 <strong>Tullow</strong> <strong>Oil</strong> <strong>plc</strong> 05

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!