11.02.2014 Views

Rehabilitation of District Heating in Serbia

Rehabilitation of District Heating in Serbia

Rehabilitation of District Heating in Serbia

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

S D H A<br />

<strong>Rehabilitation</strong> <strong>of</strong> <strong>District</strong><br />

<strong>Heat<strong>in</strong>g</strong> <strong>in</strong> <strong>Serbia</strong><br />

Petar Vasiljević, M.Sc.M.E.,<br />

PUC “Beogradske elektrane”<br />

Euroheat & Power<br />

Enlarged Work<strong>in</strong>g Group Energy Policy<br />

12 November 2009 - Zagreb


DH Companies <strong>in</strong> SERBIA


SERBIA<br />

<strong>Serbia</strong> lays between 19 o and 23 o <strong>of</strong> east geographic length and<br />

41 o to 45 o <strong>of</strong> north geographic width.<br />

The climate is cont<strong>in</strong>ental moderate.<br />

Population 7,5 million.<br />

Capital, Belgrade with 2<br />

million <strong>in</strong>habitancies is<br />

situated on 132 m altitude<br />

and has an average temp.<br />

<strong>of</strong> 11,9 o C and rel. hum. <strong>of</strong> 71%.<br />

Due to moderate climate<br />

<strong>in</strong>dividual heat<strong>in</strong>g <strong>in</strong> small<br />

places and parts <strong>of</strong> big cities<br />

is present, while DH is<br />

presented <strong>in</strong> bigger towns.<br />

Sombor<br />

B.Palanka<br />

Loznica<br />

Subotica<br />

Senta<br />

Becej<br />

Vrbas<br />

S.Mitrovica<br />

Sabac<br />

Zrenjan<strong>in</strong><br />

Novi Sad<br />

Obrenovac<br />

Valjevo<br />

Kik<strong>in</strong>da<br />

Priboj<br />

Nova Varos<br />

Pljevlja Prijepolje<br />

Beograd<br />

Pancevo<br />

Novi Pazar<br />

Smederevo<br />

Pozarevac<br />

Majdanpek<br />

Batoc<strong>in</strong>a<br />

G.Milanovac<br />

Kosjeric<br />

Kragujevac<br />

B.Basta<br />

Jagod<strong>in</strong>a<br />

Cacak<br />

Uzice<br />

Kraljevo<br />

Djakovica<br />

Vrsac<br />

Trstenik<br />

Krusevac<br />

K.Mitrovica<br />

Prist<strong>in</strong>a<br />

Bor<br />

Zajecar<br />

Knjazevac<br />

Nis<br />

Leskovac<br />

Vranje<br />

Kladovo<br />

Negot<strong>in</strong><br />

Pirot


HEATING IN SERBIA<br />

Individual heat<strong>in</strong>g: electrical, woods, coal, natural gas<br />

Local boiler station: coal, light fuel oil, heavy fuel oil<br />

<strong>District</strong> <strong>Heat<strong>in</strong>g</strong>: natural gas, heavy fuel oil, coal


<strong>District</strong> heat<strong>in</strong>g<br />

<br />

<br />

DH <strong>in</strong> SERBIA<br />

In 55 towns<br />

Installed capacity 7000 MWth<br />

(45 % <strong>in</strong> Belgrade)<br />

Average age <strong>of</strong> :<br />

BOILERS 30 years<br />

NETWORK 25 years<br />

<br />

SUBSTATIONS 25 years


Association - Today<br />

DH association<br />

<strong>of</strong> all DH companies<br />

from <strong>Serbia</strong><br />

Members 55 DHC<br />

Total DH production<br />

capacity 7000MW<br />

Annual Heat Production<br />

6-7.000 GWh


<strong>District</strong> heat<strong>in</strong>g<br />

<br />

<br />

<br />

<br />

Average annual heat supply 6000 GWhth<br />

20% households (640,000 flats)<br />

Average annual fuel consumption around 590,000 toe<br />

65% natural gas, 18% HFO, 2% LFO, 15% coals<br />

DH switched to NG, if access was available<br />

No use <strong>of</strong> biomass at all<br />

No use <strong>of</strong> solid waste at all<br />

No use <strong>of</strong> cogeneration<br />

Several studies for small cogeneration <strong>in</strong> large DH<br />

plants


<strong>District</strong> heat<strong>in</strong>g<br />

Structure <strong>of</strong> average fuel consumption <strong>in</strong> DH (toe)<br />

NG, 420000<br />

HFO, 102000<br />

LFO, 8000<br />

Coal, 60000


Priority <strong>in</strong> DH sector<br />

<strong>Rehabilitation</strong> <strong>of</strong> exist<strong>in</strong>g heat sources:<br />

<br />

<br />

<br />

<br />

Increas<strong>in</strong>g energy efficiency<br />

Emissions reduction<br />

Decreas<strong>in</strong>g heat losses<br />

Modernisation <strong>of</strong> network and substations (heat<br />

meters, thermostatic valves, heat coast alocators)<br />

Rational use <strong>of</strong> fuels, <strong>in</strong>creas<strong>in</strong>g <strong>of</strong> NG use<br />

Increas<strong>in</strong>g use <strong>of</strong> biomass fuels and <strong>in</strong>troduction <strong>of</strong> new<br />

technologies, more efficient and more environmental<br />

friendly


Investment <strong>in</strong> DH rehabilitation<br />

First donation was from Danish government at the end<br />

<strong>of</strong> year 2000. – 1.1 mil DEM <strong>in</strong> spare parts<br />

From 2001. – GRANTS AND LOANS<br />

The biggest implemented project - KfW<br />

Grant is <strong>in</strong> total 17.7 Mil € for rehabilitation <strong>of</strong> DH <strong>in</strong><br />

Beograd, Novi Sad and Nis<br />

Modernization <strong>of</strong> heat production process<br />

Replacement <strong>of</strong> out-<strong>of</strong>-age pipel<strong>in</strong>es<br />

Reconstruction and replacement <strong>of</strong> substations<br />

Education <strong>of</strong> staff<br />

Pilot-projects as a demonstration for a new tariff system


KfW Project<br />

I phase GRANT<br />

II phase GRANT<br />

III phase<br />

LOAN/GRANT*<br />

2001<br />

2002/03<br />

2007-2010<br />

7.7 mil €<br />

10 mil €<br />

12 + 8 + 2+5.5 mil€<br />

* Towns:<br />

Niš, Kragujevac, Kraljevo, Pirot and Sombor<br />

and Zrenjan<strong>in</strong>


Other projects<br />

Belgrade DH rehabilitation project<br />

Loan from EBRD + donation from SIDA<br />

In total 20+2 Mil € for rehabilitation <strong>of</strong> DH <strong>in</strong><br />

Beograd<br />

Feasibility Study for new CHP plant <strong>in</strong> Belgrade is<br />

started<br />

Several small projects like EU/EAR EE Fund with<br />

towns contribution (for 6 towns). Implementation<br />

<strong>of</strong> the projects: <strong>Serbia</strong>n Energy Efficiency Agency


<strong>District</strong> heat<strong>in</strong>g<br />

Sombor<br />

Subotica<br />

Novi Sad<br />

KfW – I, II, III phase<br />

BEOGRAD<br />

Užice<br />

Čačak<br />

Pancevo<br />

Valjevo<br />

Kragujevac<br />

Nis<br />

Kraljevo<br />

EBRD,<br />

KfW – I, II phase<br />

KfW – III phase<br />

Pirot<br />

EAR DH project


DH <strong>in</strong> Energy Low<br />

Adopted on 01 August 2004.<br />

Full responsibility and jurisdictions,<br />

<strong>in</strong>clud<strong>in</strong>g tariff systems, are on local<br />

authorities!<br />

Heat meter<strong>in</strong>g bill<strong>in</strong>gs become a<br />

Obligation<br />

Producers which use RES or waste,<br />

meet<strong>in</strong>g requirements regard<strong>in</strong>g energy<br />

efficiency


RES & ENEF<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Several project are on-go<strong>in</strong>g<br />

Us<strong>in</strong>g <strong>of</strong> geothermal water energy – Heat pump for<br />

heat<strong>in</strong>g, acclimatization <strong>of</strong> our build<strong>in</strong>g <strong>in</strong> Konjarnik<br />

Us<strong>in</strong>g <strong>of</strong> solar energy for prepar<strong>in</strong>g <strong>of</strong> domestic hot<br />

water <strong>in</strong> area <strong>of</strong> Cerak<br />

FS for 350MWe CHP – Novi Beograd <strong>in</strong> progress<br />

Us<strong>in</strong>g <strong>of</strong> solid biomass <strong>in</strong>stead <strong>of</strong> coal<br />

Sav<strong>in</strong>g primary energy through Modernisation and<br />

automatisation <strong>of</strong> biggest production plants and<br />

distribution systems with automatisation <strong>of</strong> thermal<br />

substations<br />

Introduc<strong>in</strong>g <strong>of</strong> measur<strong>in</strong>g <strong>of</strong> energy and new tariff<br />

system


Biomass used: PELLETS AND BRIQUETS<br />

Combustion <strong>of</strong> briquettes<br />

Boiler station:<br />

“Mirijevski bulevar”, “Uralska”, “Bogoslovija”


Combustion <strong>of</strong> pellets<br />

Boiler station ”BARAJEVO”<br />

TECHNICAL DATA<br />

Operat<strong>in</strong>g s<strong>in</strong>ce 1987<br />

Installed capacity 7,675 МW<br />

Number <strong>of</strong> boilers 5<br />

S<strong>in</strong>gle boiler capacity 1,535 МW<br />

Boiler type REMAX-GA<br />

Boiler manufactured 1986/89<br />

Operat<strong>in</strong>g temperature 110/70 о С<br />

Consumers capacity 4,26 МW<br />

<strong>Heat<strong>in</strong>g</strong> area 35903 м 2<br />

Sybstation type direct<br />

Distributon system 110/70 о С<br />

House <strong>in</strong>stalation regime 90/70 о С


Contribution to ecology<br />

<br />

<br />

<br />

<br />

<br />

In last 30 years “Beogradske elektrane” shut down<br />

1000 local boiler stations – runn<strong>in</strong>g on coal and<br />

HFO<br />

Exist<strong>in</strong>g customers are connected to large heat<br />

sources<br />

This is a great contribution to Belgrade Clean air<br />

Due to technical reasons – it is not possible to shut<br />

down all<br />

We have to f<strong>in</strong>d best solution for them, acceptable<br />

from economical and environmental side


Today - Priority for LA and DHC<br />

Introduc<strong>in</strong>g <strong>of</strong> measur<strong>in</strong>g <strong>of</strong> energy and new tariff<br />

system<br />

Obstacles – energy consumption <strong>in</strong> build<strong>in</strong>g<br />

80-220kWh/m 2 y<br />

Build<strong>in</strong>g certification – sav<strong>in</strong>g energy <strong>in</strong> build<strong>in</strong>g<br />

plan for future<br />

Action plan for next 10 years


Pilot PROJECT<br />

Install<strong>in</strong>g <strong>of</strong> the Heat Cost Allocators and<br />

thermostatic radiator valves<br />

Results:<br />

- Reduction <strong>in</strong> delivered energy 15%<br />

- Reduction <strong>in</strong> electrical energy 40% (variable flow pumps)


Needs for <strong>in</strong>vestment<br />

It is obvious that thru all exist<strong>in</strong>g project was<br />

covered only 10 cities<br />

Our estimation is that this 10 towns need<br />

around 50 mil € for f<strong>in</strong>alization <strong>of</strong><br />

rehabilitation and modernization <strong>of</strong> DH<br />

systems<br />

Other 45 towns need at least 150 mil € <strong>in</strong> next<br />

10 years for rehabilitation <strong>of</strong> DH systems<br />

Such big amount <strong>of</strong> funds can not be provided<br />

by the IFI`s, but PPP will be necessary<br />

approaches for co-f<strong>in</strong>anc<strong>in</strong>g <strong>in</strong> DH rehabilitation


THANK YOU FOR ATTENTION!<br />

PE “Beogradske elektrane”<br />

Petar Vasiljević, B.Sc.M.E.<br />

p.vasiljevic@beoelektrane.rs<br />

Euroheat & Power<br />

Enlarged Work<strong>in</strong>g Group Energy Policy<br />

12 November 2009 - Zagreb

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!