UCSD, PCA & NEES BLIND PREDICTION CONTEST
UCSD, PCA & NEES BLIND PREDICTION CONTEST
UCSD, PCA & NEES BLIND PREDICTION CONTEST
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Test Structure<br />
63’-0” 21 m<br />
PT wall<br />
Gravity<br />
columns<br />
Flange wall<br />
Cantilever<br />
web wall<br />
• 7-story building slice with<br />
cantilever wall as the<br />
lateral force resisting<br />
system<br />
• Tallest building structure<br />
ever tested on a<br />
shaketable<br />
• Single axis of input<br />
ground motion in the<br />
plane of the wall<br />
• Phase 1 Testing:<br />
12 ft. long rectangular wall<br />
• Phase 2 Testing<br />
14 ft. 7 in. long T-wall