INDIANAPOLIS AIRPORT AUTHORITY<br />

SPECIAL PROVISIONS<br />

Ground Transportation Center Mechanical Modifications<br />

SP-1 SCOPE OF WORK: Contractor will install, modify or replace to improve the<br />

performance of the existing GTC HVAC system at <strong>Indianapolis</strong> <strong>International</strong> <strong>Airport</strong> located<br />

in <strong>Indianapolis</strong>, Indiana.<br />

The scope of this project includes, but is not limited to:<br />

1. Provide new return grilles with associated ductwork and volume dampers in office<br />

areas and connect to existing main return duct in locations as shown on the drawings.<br />

Remove existing non-ducted return grilles in office areas and provide matching ceiling<br />

tile in the place if the new return grille is installed in a separate location. Provide<br />

balancing services to adjust airflows to quantities as shown on the drawings. Cap and<br />

seal unused return duct take-offs.<br />

2. Provide electric unit heaters in plenum space above office ceilings with wire and<br />

conduit back to electrical panel indicated on the drawings. Provide new circuit<br />

breakers as required. Provide fire stops at new wall penetrations.<br />

3. Relocate room temperature sensors in Rooms 151, National/Alamo Rental Car and 154<br />

Budget Rental Car office spaces to new locations as shown on the drawings. Correct<br />

miswired room temperature sensor in Room 151, National/Alamo Rental Car office<br />

space as shown on the drawings.<br />

4. Insulate existing supply duct in Room 150, Enterprise Rental Car office space where<br />

indicated on the drawings.<br />

5. Provide suspended ceiling in Hertz Server Room and perform the following:<br />

• Relocate existing light fixture and reinstall below new ceiling.<br />

• Relocate existing sprinkler head and install in new ceiling.<br />

• Finish to match existing.<br />

ALTERNATE 1<br />

1. Provide new slot diffusers with associated ductwork and volume dampers in office<br />

areas as shown on the drawings. Cut existing ceiling tiles to accept new diffusers.<br />

Remove existing ceiling supply diffusers and associated supply ductwork in office area<br />

as shown on the drawings. Provide matching ceiling tile. Provide balancing services to<br />

adjust airflows to quantities as shown on the drawings.<br />

2. Insulate new supply ductwork in Rooms 154, 153 and 150 where indicated on the<br />

drawings.<br />

ALTERNATE 2<br />

1. Remove existing supply diffusers and take-offs in overhead duct in Main Hall as shown<br />

on the drawings. Provide new drum louver directional diffusers in overhead duct in<br />

Main Hall as shown on the drawings. Patch and paint ductwork to match existing.<br />

Provide balancing services to adjust airflows to quantities as shown on the drawings.<br />

SP‐1