29.10.2012 Views

00559 Interim PDF Edition - Champex-Linden

00559 Interim PDF Edition - Champex-Linden

00559 Interim PDF Edition - Champex-Linden

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

54<br />

An oval can also provide as many operating possibilities as point-to-point<br />

layouts. For example, this big oval (Layout 5) is a folded figure-eight with a<br />

big passing siding and four stub sidings. With it, you can have lots of<br />

operating fun, but since it's still an oval, you can just sit back, relax and<br />

watch the trains run.<br />

The one disadvantage of oval layouts is their size. At a minimum, every<br />

oval layout must include a full circle of track for continuous operation, and<br />

no matter how you bend or shape it, an oval layout will always be at least<br />

two tracks wide. That's a problem, especially in situations where the track<br />

has to run along walls or fences.<br />

Layout 5<br />

1210000 2 10080<br />

7 10150<br />

2 10152<br />

7 10153<br />

2010600 3111000 2 12050<br />

4 12150

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!