In terms <strong>of</strong> capital construction, a detailed investigation report<br />
on geologic conditions <strong>of</strong> the observatory site was obtained in<br />
March. In May, the construction headquarters entered into a<br />
construction drawing design contract <strong>of</strong> site excavation with<br />
manufacturer and performed quality inspection on drawing<br />
design <strong>of</strong> site excavation in November. In terms <strong>of</strong> technology,<br />
several R&D projects, including a prototype <strong>of</strong> the fully<br />
aluminum-structured reflector unit, were carried out to make<br />
preparations for the construction <strong>of</strong> the technological system.<br />
Aerial Remote Sensing System<br />
Construction work has been in full swing since January. Airplane<br />
modification enters into preliminary design stage, and eight sets<br />
<strong>of</strong> self-developed remote sensing devices have been designed and<br />
put into production. Contract <strong>of</strong> two remote sensing devices was<br />
signed; and in December, ground data comprehensive treatment<br />
and management system was put into operation. A multi-use<br />
remote sensing building started to be built.<br />
National Protein Science Research (Shanghai)<br />
Facility<br />
With feasibility study got approved in July, preparation for<br />
construction was carried out smoothly. Finishing procedures<br />
<strong>of</strong> design, budget and construction permit, contractors <strong>of</strong><br />
construction-installation design and supervision, investigation,<br />
pile foundation construction and investment supervision were<br />
decided through biddings. In building light beam lines station<br />
Progress <strong>of</strong> EAST<br />
In 2010, physical experiment <strong>of</strong> the<br />
Experimental Advanced Superconducting<br />
Tokamak (EAST), the world’s first fully<br />
superconducting tokamak, has recorded a<br />
maximum plasma current <strong>of</strong> 1MA, highconfinement<br />
mode <strong>of</strong> a duration over 60<br />
times <strong>of</strong> energy confinement time, and<br />
long-pulse diverted plasma discharges<br />
<strong>of</strong> 0.25MA and the world’s longest<br />
100-second duration.<br />
CHINESE ACADEMY OF SCIENCES<br />
for the Facility, contracts were<br />
signed and initiated.<br />
Spallation Neutron<br />
Source(SNS)<br />
The preparation work prior<br />
to starting construction was<br />
completed, and pre-study and<br />
studies <strong>of</strong> key technology and<br />
prototypes prefabrication for<br />
each system were completed.<br />
Leveling <strong>of</strong> construction site<br />
started in April and entered into<br />
side slope supporting stage by<br />
the end <strong>of</strong> the year. Reviewed<br />
by experts at home and<br />
abroad and based on further<br />
argumentation and optimal<br />
design by project management<br />
department, the cost <strong>of</strong> overall<br />
construction increased, and a<br />
revised fearibility study was resubmitted.<br />
About 115 persons<br />
recruited for the project were<br />
settled down in Dongguan.<br />
ANNUAL REPORT / [ 71 ]