07.03.2014 Views

Exploration for and Pre-feasibility of mining Polymetallic Sulphides ...

Exploration for and Pre-feasibility of mining Polymetallic Sulphides ...

Exploration for and Pre-feasibility of mining Polymetallic Sulphides ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Trial Mining – crust vs sulphides<br />

• A trial <strong>mining</strong> program may entail <strong>mining</strong> 1 million<br />

tonnes trialling a 2mtpa <strong>mining</strong> system.<br />

• 1 million tonnes <strong>of</strong> crust covers a surface area <strong>of</strong> 8<br />

square KILOMETRES whereas 1 million tonnes <strong>of</strong><br />

polymetallic sulphides to 20m deep disturbs only<br />

140 METRES square <strong>of</strong> surface area.<br />

• Trial <strong>mining</strong> production should be allowed to be<br />

sold to a processor to determine process<br />

characteristics, recover costs <strong>of</strong> trial <strong>and</strong> ensure<br />

material from trial is not wasted but used by man.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!