14.03.2014 Views

Major Congestion-Reducing Highway Projects (PDF format)

Major Congestion-Reducing Highway Projects (PDF format)

Major Congestion-Reducing Highway Projects (PDF format)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Appendix . <strong>Major</strong> <strong>Congestion</strong>-<strong>Reducing</strong> <strong>Highway</strong> <strong>Projects</strong> Urban Areas with Populations > 50,000. 12/4/2006<br />

Cost per<br />

Added<br />

Lane Mile,<br />

K<br />

Plan<br />

Lane-<br />

Existing Future Lanes Miles Proj<br />

Est Fut<br />

Traffic ADT Est Fut DVMT<br />

Est<br />

DVHT<br />

Type Work Type Key Route/City From To Description Lanes Lanes Added Added Length Est. Cost, K<br />

Affected Affected Saved<br />

Hickory<br />

TIP 4-Frwy U-2532 Southern Loop I-40 at SR 1124 US 321 in Multi-lanes on new 0 4 4 42.40 10.60 68,500 1,616 1 65,923 698,783 1,165<br />

Widening<br />

Newton location<br />

TIP<br />

Widen to six lanes 4 6 2 14.60 7.30 62,542 4,284 3 19,520 142,495 244<br />

5-Urb Art<br />

Widening<br />

U-4700<br />

(part 1)<br />

TIP 2-New Arterial U-2307<br />

(part 2)<br />

McDonald<br />

Parkway<br />

TIP 2-New Arterial U-2531 Hickory North<br />

Crosstown Loop<br />

US 321 US 70 in Hickory Through<br />

map<br />

selection<br />

US 70-321 NC 127 Multi-lanes on new<br />

location<br />

NC 127 NC 16 Multi-lanes on new<br />

location<br />

Funct<br />

Class<br />

1=Int<br />

2=OFE<br />

3=PAMA<br />

4=LOC<br />

Coll<br />

0 4 4 9.76 2.44 53,081 5,439 3 19,520 47,629 38<br />

0 4 4 30.80 7.70 51,850 1,683 3 19,520 150,303 121<br />

TIP<br />

5-Urb Art<br />

Widening<br />

U-2404 NC 16 Newton-<br />

Conover Loop<br />

NC 16 South of<br />

Newton<br />

NC 16 North<br />

of Conover<br />

Widen to four lane<br />

divided<br />

2 4 2 11.60 5.80 47,345 4,081 3 19,520 113,215 566<br />

TIP<br />

6-Rural Art<br />

Widening<br />

R-3100 NC 16 Tower Road (SR<br />

1895)<br />

TIP 5-Urb Art<br />

Widening<br />

U-2307<br />

(part 1)<br />

McDonald<br />

Parkway<br />

TIP 2-New Arterial U-3614 US 321 - NC 127<br />

Connector<br />

Blacksmith<br />

Rd. (SR<br />

1800)<br />

Southeast<br />

of Newton<br />

Widen to multilanes<br />

2 4 2 18.20 9.10 46,498 2,555 3 19,520 177,631 197<br />

US 70-321 NC 127 Multi-lanes 2 4 2 8.12 4.06 34,935 4,302 3 19,520 79,251 396<br />

US 321 NC 127 Two lanes on four<br />

lane right of way,<br />

some new location<br />

0 2 2 7.40 3.70 21,800 2,946 4 5,000 18,500 41<br />

TIP<br />

6-Rural Art<br />

Widening<br />

R-3603<br />

(part 1)<br />

NC 127<br />

Cloninger Mill Rd. US 64-NC<br />

(SR 1400)-SR 90 in<br />

1351 (1st St. NW) Alexander<br />

in Catawba<br />

Upgrade two lanes<br />

and provide some<br />

multi-lane curb and<br />

gutter (through<br />

map selection)<br />

2 4 2 8.04 4.02 16,782 2,087 3 19,520 78,470 87<br />

TIP<br />

5-Urb Art<br />

Widening<br />

U-2528<br />

(part 1)<br />

TIP 2-New Arterial U-2529<br />

(part 3)<br />

TIP 2-New Arterial U-2529<br />

(part 2)<br />

Northwest Loop<br />

Fairgrove Church<br />

Road Extension<br />

Fairgrove Church<br />

Road Extension<br />

33rd Street at I 40 Airport Road<br />

at US 321<br />

NC 10 Southwest<br />

of Newton<br />

Fairgrove Church<br />

Road<br />

Fairgrove<br />

Church<br />

Road<br />

Section<br />

House Road<br />

(SR 1491)<br />

Multi-lane<br />

improvements,<br />

connector on new<br />

location<br />

Multi-lane<br />

connector on new<br />

location.<br />

Multi-lane<br />

connector on new<br />

location.<br />

2 4 2 7.60 3.80 13,475 1,773 3 19,520 74,176 371<br />

0 4 4 5.84 1.46 12,360 2,116 3 19,520 28,499 23<br />

0 4 4 15.28 3.82 10,193 667 3 19,520 74,566 60<br />

TIP<br />

3-New<br />

Exit/Ramp<br />

U-2528<br />

(part 2)<br />

Northwest Loop SR 1124 I 40 New interchange I-<br />

40<br />

4 4 0 0.00 0.50 10,000 5,000 3 19,520 9,760 20<br />

Page 65 of 98 Pages

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!