22.03.2014 Views

November 8-10, 1991 - Klofas.com

November 8-10, 1991 - Klofas.com

November 8-10, 1991 - Klofas.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table <strong>10</strong> <br />

Summary of Validation Criteria Measurements <br />

for Multiple Replications <br />

Sallple No. 7<br />

-­ Run No. 1 -­ -­ Run No. 2 -­ -­ Run No. 3 -­<br />

% of % of % of<br />

Actual % of Actual % of Actual % of<br />

Total or Sill. Total or Sill. Total or Sill.<br />

Category Total Category Total Category Total<br />

Total Bytes -7.7 -7.0 -6.4<br />

File Server -14.9 47.6 -13.7 47.9 -13.3 47.8<br />

Broadcasting -0.4 45.9 -0.6 45.5 +0.3 45.6<br />

Telemetry +5.8 6.5 +5.7 6.5 +5.8 6.5<br />

Sallple No. 8<br />

Total Bytes -2.2 -3.1 -0.7<br />

File Server -11. 5 48.4 -14.1 47.4 -<strong>10</strong>.6 48.2<br />

Broadcasting +11.0 45.0 +12.2 45.9 +13.6 45.3<br />

Telemetry -6.0 6.6 -5.9 6.7 -6.1 6.5<br />

Each run in Table <strong>10</strong> consists of <strong>10</strong> replications of each<br />

visibility period in the actual data sample. For sample no. 7<br />

each run is ten replications of the 20 visibility periods and for<br />

sample no. 8 each run is <strong>10</strong> replications of the 8 visibility<br />

periods. The data in Table <strong>10</strong> shows good agreement of byte<br />

counts in the actual and simulated data for sample no. 7 except<br />

for file server traffic. The percentage of file server traffic<br />

is also lower than in the actual data for sample no. 8. However,<br />

due to the satellite software testing mentioned earlier, the<br />

sample no. 7 data should provide a more accurate <strong>com</strong>parison.<br />

20<br />

SIMULATION OF ALTERNATIVE SYSTEM OPERATIONS AND CONFIGURATIONS<br />

Since the simulator is driven by tracking data for a<br />

specific location, it is easy to predict how much data of each<br />

particular type--file server, broadcasting, and telemetry--it<br />

will be possible to receive. However, the simulator is also<br />

useful for assessing the effects of changes made to the original<br />

design or to current operating parameters. The results of some<br />

simulated operational changes are described in this section.<br />

When studying the simulated operating conditions presented<br />

in this section, the reader is reminded that they are heavily<br />

dependent on hardware and software capabilities both at the<br />

spacecraft and at the ground station. Furthermore, the simu­

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!