Congestion Management between Baltic states - Konkurentsiamet

Congestion Management between Baltic states - Konkurentsiamet

Congestion Management between Baltic states - Konkurentsiamet

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Estlink 1<br />

• Cable in commercial use until 2013, when it will be bought out by<br />

transmission network operators<br />

NPS <strong>Baltic</strong> project was launched in November 2007 in order for<br />

Elering and Fingrid to rent or buy a part of or the entire cable for<br />

allocation on NPS<br />

• Aim:<br />

‣ A base for a joint <strong>Baltic</strong> and Nordic energy market<br />

‣ A price area at the southern end of the Estlink 1 cable<br />

‣ More efficient use of the Estlink 1 cable<br />

‣ A more reliable market price for electricity<br />

THE STATUS TODAY:<br />

Estlink 1 cable rented by Elering and Fingrid:<br />

EE – FI: 262.5 MW<br />

FI – EE: 252.7 MW<br />

Capacity is allocated by NPS.