A PLAN OF TRAINING FOR BRICKLAYER OCCUPATION Approved
A PLAN OF TRAINING FOR BRICKLAYER OCCUPATION Approved
A PLAN OF TRAINING FOR BRICKLAYER OCCUPATION Approved
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Bricklayer Occupation<br />
MAJOR TASKS / SUBTASKS (SKILLS):<br />
1. Construct chimneys with single flues<br />
a. Set a clean-out<br />
b. Cut chimney liner to receive a thimble<br />
c. Cut chimney liners, using a brick hammer<br />
d. Calculate offsets on flue linings<br />
e. Set a thimble<br />
f. Cut flashing to fit pitch of roofs<br />
g. Cut lines to construct chimney<br />
h. Set liners in chimney<br />
i. Install flue thimble in breastwork<br />
j. Install chimney flashing<br />
k. Install flue thimble and clean-out door<br />
l. Install chimney tops (brick and concrete)<br />
Note: Single flue chimney construction should include the following:<br />
- above thimble heights<br />
- exposed above thimble heights<br />
- exposed on gable end<br />
- unexposed on slope roof<br />
- unexposed on ridge of roof<br />
2. Construct chimneys with multiple flues<br />
a. Cut offset flue liners for multiple flue chimneys<br />
b. Corbel brickwork<br />
c. Set liners in multiple flue chimneys<br />
d. Install chimney tops (brick and concrete)<br />
Note: Chimney Construction should include:<br />
1. Multiple flue chimney containing clean-outs and thimbles.<br />
2. Multiple flue chimney topped out and flashed on a flat roof with a projected<br />
masonry cap.<br />
3. Multiple flue chimney containing offsets.<br />
EVALUATION:<br />
Written reports and/or tests.<br />
Competence in simulated work and/or experiential endorsements.<br />
LEAD INSTITUTION:<br />
DEVELOPMENT HISTORY:<br />
Date Developed: October 1994<br />
INSTRUCTOR'S NOTES:<br />
Provincial Apprenticeship Board - June, 2000 Page 43