30.03.2014 Views

Budget Activity 7 - Army Financial Management - U.S. Army

Budget Activity 7 - Army Financial Management - U.S. Army

Budget Activity 7 - Army Financial Management - U.S. Army

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

UNCLASSIFIED<br />

Exhibit R-2A, RDT&E Project Justification: PB 2014 <strong>Army</strong> DATE: April 2013<br />

APPROPRIATION/BUDGET ACTIVITY<br />

2040: Research, Development, Test & Evaluation, <strong>Army</strong><br />

BA 7: Operational Systems Development<br />

R-1 ITEM NOMENCLATURE<br />

PE 0203801A: Missile/Air Defense Product<br />

Improvement Program<br />

PROJECT<br />

DT5: Stinger Product Improvement<br />

C. Other Program Funding Summary ($ in Millions)<br />

Line Item FY 2012 FY 2013<br />

FY 2014<br />

Base<br />

FY 2014<br />

OCO<br />

FY 2014<br />

Total FY 2015 FY 2016 FY 2017 FY 2018<br />

Cost To<br />

Complete Total Cost<br />

• PE0604869A: Proj M06,<br />

389.630 400.861 0.000 790.491<br />

Patriot.MEADS Compined<br />

Aggregate Program (CAP)<br />

• PE0605456A: Proj PA3, Pac-3/ 88.909 69.029 69.175 69.175 130.348 63.975 65.771 66.638 Continuing Continuing<br />

MSE Missile<br />

• SSN C53101: MSE Missile 74.953 12.850 546.210 546.210 541.584 560.687 566.757 671.624 Continuing Continuing<br />

• PE0102419A: Proj E55, JLENS 327.338 190.422 64.450 64.450 32.100 23.850 24.330 0.000 662.490<br />

• PE0605455A: Proj S35,<br />

1.529 0.000 1.529<br />

SLAMRAAM<br />

• PE 0604319A: Proj DU3, IFPC2 9.269 76.039 79.232 79.232 107.587 146.463 151.769 159.700 Continuing Continuing<br />

(FY 2011/2012 PE0603305A IFPC<br />

II- Intercept)<br />

• PE0605457A: Proj S40, <strong>Army</strong> 270.180 262.211 345.410 345.410 372.000 222.940 143.196 80.103 Continuing Continuing<br />

Integrated Air and Missile Defense<br />

(AIAMD)<br />

• SSN BZ5075: <strong>Army</strong> IAMD Battle<br />

20.980 20.980 101.830 327.100 492.820 455.390 Continuing Continuing<br />

Command system (IBCS)<br />

• PE 0208053: Proj 635, Joint Tact 27.586 31.738 14.109 14.109 2.903 8.134 7.642 8.957 Continuing Continuing<br />

Grd Station - PI (MIP)<br />

• PE 0604820A: Proj E10, Sentinel 2.885 3.486 1.944 1.944 1.927 2.953 3.007 3.053 Continuing Continuing<br />

• PE 0604741A: Proj 126, 146, 82.932 73.333 37.409 37.409 14.670 15.171 14.409 7.315 Continuing Continuing<br />

149; Air Defense C2I Eng Dev<br />

Remarks<br />

This program is a supporting system of the <strong>Army</strong> Integrated Air and Missile Defense (IAMD) architecture.<br />

D. Acquisition Strategy<br />

In FY 2012 the Stinger Based Systems (SBS) Product Office awarded a Proximity Fuze (Prox Fuze) development contract for the design, development, test and<br />

integration of a Proximity Fuze into existing Stinger Block I missiles. The Proximity Fuze will improve system effectiveness against the evolving UAS threat. Unmanned<br />

Aerial System Defense (UAS-D) is a requirement of the Operational Requirements Document (ORD) for the Stinger Guided Missile System.<br />

E. Performance Metrics<br />

Performance metrics used in the preparation of this justification material may be found in the FY 2010 <strong>Army</strong> Performance <strong>Budget</strong> Justification Book, dated May 2010.<br />

PE 0203801A: Missile/Air Defense Product Improvement Program UNCLASSIFIED<br />

<strong>Army</strong> Page 11 of 14 R-1 Line #167<br />

184

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!