30.03.2014 Views

Budget Activity 7 - Army Financial Management - U.S. Army

Budget Activity 7 - Army Financial Management - U.S. Army

Budget Activity 7 - Army Financial Management - U.S. Army

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

UNCLASSIFIED<br />

Exhibit R-2, RDT&E <strong>Budget</strong> Item Justification: PB 2014 <strong>Army</strong> DATE: April 2013<br />

APPROPRIATION/BUDGET ACTIVITY<br />

2040: Research, Development, Test & Evaluation, <strong>Army</strong><br />

BA 7: Operational Systems Development<br />

COST ($ in Millions)<br />

All Prior<br />

FY 2014<br />

Years FY 2012 FY 2013 # Base<br />

R-1 ITEM NOMENCLATURE<br />

PE 0305235A: UAS Modifications/Product Improvement Program<br />

FY 2014 FY 2014<br />

OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018<br />

Cost To<br />

Complete<br />

Total Program Element - 4.000 2.387 0.000 - 0.000 0.000 0.000 0.000 0.000 Continuing Continuing<br />

P20: MQ-18 - 4.000 2.387 0.000 - 0.000 0.000 0.000 0.000 0.000 Continuing Continuing<br />

#<br />

FY 2013 Program is from the FY 2013 President's <strong>Budget</strong>, submitted February 2012<br />

##<br />

The FY 2014 OCO Request will be submitted at a later date<br />

Note<br />

Funds transferred from 0603820/D20. FY2012, $3,500 taken by ABO as OMNIBUS bill payer.<br />

A. Mission Description and <strong>Budget</strong> Item Justification<br />

The <strong>Army</strong> has a requirement to provide Intelligence, Surveillance, and Reconnaissance (ISR) platforms capable of operating in and near unfriendly territories/areas of<br />

conflict. The system shall be a rotary wing unmanned vertical takeoff and landing(VTOL) aircraft system not conducive to standard airfields but forward deployable to<br />

support extended operations in austere environment. The aircraft system will be made up of multiple aircraft (minimum of 4) that incorporates high value technologies<br />

in the airframe, propulsion, datalink systems, communications systems, and avionics systems. The system will be common with the <strong>Army</strong> selection of the Line of Sight<br />

and Beyond Line of Sight Tactical Common Data Link and the Universal Ground Control Station. The aircraft will simultaneously carry multi-functional payloads such<br />

as SIGINT, EO/IR/LD, and Wide Area Surveillance without degrading time on station. This system will provide dramatic improvements in operational flexibility and<br />

mission performance.<br />

FY 2014: No Funding<br />

B. Program Change Summary ($ in Millions) FY 2012 FY 2013 FY 2014 Base FY 2014 OCO FY 2014 Total<br />

Previous President's <strong>Budget</strong> 7.500 2.387 51.019 - 51.019<br />

Current President's <strong>Budget</strong> 4.000 2.387 0.000 - 0.000<br />

Total Adjustments -3.500 0.000 -51.019 - -51.019<br />

• Congressional General Reductions - -<br />

• Congressional Directed Reductions - -<br />

• Congressional Rescissions - -<br />

• Congressional Adds - -<br />

• Congressional Directed Transfers - -<br />

• Reprogrammings - -<br />

• SBIR/STTR Transfer - -<br />

• Adjustments to <strong>Budget</strong> Years -3.500 - -51.019 - -51.019<br />

Total<br />

Cost<br />

PE 0305235A: UAS Modifications/Product Improvement Program UNCLASSIFIED<br />

<strong>Army</strong> Page 1 of 6 R-1 Line #183<br />

358

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!