Implementing OpenADR2.0 with<br />

PJM Interconnection, LLC<br />

May 24 <strong>2012</strong><br />

Robert Nawy<br />

Managing Director & CFO<br />

<strong>Jim</strong> <strong>Boch</strong><br />

Principal Electrical Engineer<br />

IPKeys Technologies, LLC<br />

540-657-4715<br />

jboch@ipkeys.com<br />

<strong>ConnectivityWeek</strong> <strong>2012</strong><br />

#ConnWeek Santa Clara, CA May 22-24, <strong>2012</strong> 1


PJM / IPKeys Pilot<br />

#ConnWeek Santa Clara, CA May 22-24, <strong>ConnectivityWeek</strong> <strong>2012</strong> <strong>2012</strong>2


Participants and Roles<br />

NIST<br />

Solar<br />

IPKeys NJ<br />

Lighting<br />

PJM<br />

EISS<br />

IPKeys VA<br />

American<br />

PowerNet<br />

EISS<br />

Redners<br />

HVAC<br />

Lighting<br />

Walmart<br />

EIServer<br />

Walmart<br />

Store<br />

HVAC<br />

Perfectly Green/<br />

Fast Food<br />

Restaurant<br />

Gen<br />

<strong>ConnectivityWeek</strong> <strong>2012</strong><br />

#ConnWeek Santa Clara, CA May 22-24, <strong>2012</strong> 3


Use Cases<br />

• Demand Response Event<br />

– OpenADR 2.0 event called and confirmation received<br />

• Price Based Demand Response<br />

– Preset price levels at the end point are exceeded and<br />

confirmation returned to the server<br />

• Verification with Telemetry<br />

– Event and price based load shed verified with near<br />

real time (NRT) meter telemetry<br />

<strong>ConnectivityWeek</strong> <strong>2012</strong><br />

#ConnWeek Santa Clara, CA May 22-24, <strong>2012</strong> 4


Web Services<br />

• Events and price distribution done using the<br />

EiEvent service<br />

• REST is used (RE<strong>presentation</strong>al State Transfer)<br />

– Poll – most participants<br />

– Push – EnergyICT / Walmart<br />

<strong>ConnectivityWeek</strong> <strong>2012</strong><br />

#ConnWeek Santa Clara, CA May 22-24, <strong>2012</strong> 5


End Device Integration<br />

• We needed an OpenADR 2.0a-compliant endpoint<br />

to complete all use cases – IPKeys’ EISSBox VEN was<br />

the solution<br />

• NIST is a virtual participant<br />

• IPKeys’ lighting and HVAC are signaled <strong>by</strong> direct load<br />

control via dry contact<br />

• Redners signaling is <strong>for</strong> manual DR (breaker panel)<br />

• Walmart signaling is done using OpenADR 2.0<br />

integration into EnergyICT’s EIServer energy<br />

management system to a Novar BMS<br />

• Perfectly Green is signaled <strong>by</strong> dry contact<br />

integration into Niagara framework<br />

<strong>ConnectivityWeek</strong> <strong>2012</strong><br />

#ConnWeek Santa Clara, CA May 22-24, <strong>2012</strong> 6


Manual DR and OpenADR<br />

• Cost of building automation<br />

• Replacing BMS vs EISS adaptor concept<br />

• The case <strong>for</strong> manual DR<br />

#ConnWeek Santa Clara, CA May 22-24, <strong>ConnectivityWeek</strong> <strong>2012</strong> <strong>2012</strong>7


Meter Telemetry<br />

• EiReport service will be used to provide<br />

standards-based telemetry in the future<br />

• Data collected <strong>by</strong> pulses, CT and shunt<br />

• Four (4) second telemetry with two (2) second<br />

latency<br />

<strong>ConnectivityWeek</strong> <strong>2012</strong><br />

#ConnWeek Santa Clara, CA May 22-24, <strong>2012</strong> 8


Security – Risk VTN<br />

Use Case 1: Malicious disruption of OADR2 messages leaving the server (VTN)<br />

Actor 1, Utility (VTN)<br />

Risk Category<br />

Message Type A I C N<br />

Demand Response Events 3 3 1 1<br />

Price Conveyance Public Data 1 1 1 1<br />

Price Conveyance Private Data 2 2 2 2<br />

Price Conveyance with PRD 3 3 2 2<br />

Feedback (Meter telemetry or other) 2 2 2 2<br />

Energy Transactions 3 3 3 3<br />

Risk Categories<br />

1. Inconvenient but no detrimental effect to either<br />

customer or grid<br />

2. Disturbance to utility or customers, but not to grid<br />

3. Grid Instability<br />

[1]<br />

There are programs that tie load shed to prices<br />

[2]<br />

Not substation or state estimation devices, client devices only<br />

[3]<br />

Buying and selling, with calls to per<strong>for</strong>m<br />

<strong>ConnectivityWeek</strong> <strong>2012</strong><br />

#ConnWeek Santa Clara, CA May 22-24, <strong>2012</strong> 9


Security – Risk VEN<br />

Use Case 2: Malicious disruption of OADR2 messages leaving the client (VEN)<br />

Actor 2, Client(VEN)<br />

Risk Category<br />

Message Type A I C N<br />

Demand Response Events 1 1 1 1<br />

Price Conveyance Public Data 1 1 1 1<br />

Price Conveyance Private Data 1 1 1 1<br />

Price Conveyance with PRD 1 1 1 1<br />

Feedback (Meter telemetry or other) 2 2 2 2<br />

Energy Transactions 3 3 3 3<br />

Risk Categories<br />

1. Inconvenient but no detrimental effect to either<br />

customer or grid<br />

2. Disturbance to utility or customers, but not to grid<br />

3. Grid Instability<br />

[1]<br />

There are programs that tie load shed to prices<br />

[2]<br />

Not substation or state estimation devices, client devices only<br />

[3]<br />

Buying and selling, with calls to per<strong>for</strong>m<br />

<strong>ConnectivityWeek</strong> <strong>2012</strong><br />

#ConnWeek Santa Clara, CA May 22-24, <strong>2012</strong> 10


Account/Resource/Asset/Program<br />

#ConnWeek Santa Clara, CA May 22-24, <strong>ConnectivityWeek</strong> <strong>2012</strong> <strong>2012</strong>11


Events<br />

#ConnWeek Santa Clara, CA May 22-24, <strong>ConnectivityWeek</strong> <strong>2012</strong> <strong>2012</strong>


Confirmation<br />

#ConnWeek Santa Clara, CA May 22-24, <strong>ConnectivityWeek</strong> <strong>2012</strong> <strong>2012</strong>13


Verification<br />

#ConnWeek Santa Clara, CA May 22-24, <strong>ConnectivityWeek</strong> <strong>2012</strong> <strong>2012</strong>14


Real Time Pricing<br />

#ConnWeek Santa Clara, CA May 22-24, <strong>ConnectivityWeek</strong> <strong>2012</strong> <strong>2012</strong>15


Lessons Learned<br />

• Considerable cost savings are available in the<br />

wholesale market, but with risk<br />

• Cost of building automation is a major factor<br />

• Inexpensive endpoints speed implementation<br />

• Verification is the key feature<br />

• Most DR is still telephone based<br />

<strong>ConnectivityWeek</strong> <strong>2012</strong><br />

#ConnWeek Santa Clara, CA May 22-24, <strong>2012</strong> 16

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!