Solar PV Atlas: Solar Power in Harmony with Nature - WWF
Solar PV Atlas: Solar Power in Harmony with Nature - WWF
Solar PV Atlas: Solar Power in Harmony with Nature - WWF
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Solar</strong> <strong>PV</strong> <strong>Atlas</strong><br />
<strong>Solar</strong> <strong>PV</strong><br />
POPULATION DENSITY<br />
SOLAR RESOURCE<br />
As can be seen on the solar map, the<br />
conditions for solar <strong>PV</strong> are excellent<br />
across the island. The prevail<strong>in</strong>g<br />
trade w<strong>in</strong>ds that come from the east<br />
result <strong>in</strong> a small reduction <strong>in</strong> solar<br />
irradiance on the w<strong>in</strong>dward side of<br />
Madagascar. Overall however, the<br />
solar resource <strong>in</strong> Madagascar is very<br />
strong, <strong>with</strong> over two-thirds of the<br />
island hav<strong>in</strong>g an annual average <strong>in</strong>solation<br />
greater than 6 kWh/m 2 /day.<br />
Even on the ra<strong>in</strong>y side of Madagascar<br />
annual <strong>in</strong>solation is greater than 5<br />
kWh/m 2 /day.<br />
Four and a half square kilometres of<br />
solar panels would generate enough<br />
electricity to meet Madagascar’s<br />
total current electricity generation.<br />
Because population and per capita<br />
electricity consumption are expected<br />
to rise <strong>in</strong> the com<strong>in</strong>g decades, 780<br />
square kilometres of land dedicated<br />
to solar production would be<br />
required to meet to meet 100 per<br />
cent of Madagascar’s total electricity<br />
needs <strong>in</strong> 2050. Concentrated <strong>in</strong>to<br />
one location, this land would repre-<br />
Land required for<br />
<strong>PV</strong> to meet 100 per<br />
cent of electricity<br />
production<br />
In the year 2010<br />
In the year 2050<br />
Protected Areas<br />
Population<br />
Density > 100/km 2<br />
Population<br />
Density > 1000/km 2<br />
2 4 6 8<br />
kWh / m 2 / day<br />
18<br />
MADAGASCAR<br />
Land required for<br />
<strong>PV</strong> to meet 100 per<br />
cent of electricity<br />
production<br />
In the year 2010<br />
In the year 2050