<strong>New</strong> <strong>Motorway</strong> <strong>in</strong> <strong>Denmark</strong><br />
Silkeborg is located <strong>in</strong> Central Jutland Region, <strong>Denmark</strong>.<br />
Landscape around the area is dom<strong>in</strong>ated by big lakes<br />
and forests.To ease the traffic overload on road No.<strong>15</strong><br />
it was decided to build a new motorway from Silkeborg<br />
to Aarhus. The road- and bridgework is scheduled to<br />
be ready by 2016.<br />
One of the contactors <strong>in</strong>volved <strong>in</strong> the project is MT<br />
Højgaard A/S, one of the lead<strong>in</strong>g contractors <strong>in</strong> the<br />
Nordic countries. As a part of the big motorway project<br />
MT Højgaard is <strong>in</strong> charge of a new bridge construction<br />
over the Silkeborg Lake close to road <strong>15</strong> near Silkeborg.<br />
The first step <strong>in</strong> build<strong>in</strong>g the bridge was to stabilize the<br />
ground at the shorel<strong>in</strong>e to enable cranes, which are<br />
needed for the basement construction of the bridge<br />
pillars, enter the job site. For this purpose MT Højgaard<br />
used over 2000 timber piles up to 16 meters <strong>in</strong> length<br />
and up to 300mm <strong>in</strong> diameter. This basement serves as<br />
a bailey bridge for the construction mach<strong>in</strong>ery.<br />
The timber piles were driven with Movax SP-70 Sidegrip<br />
vibrator <strong>in</strong> comb<strong>in</strong>ation with a drop hammer. The<br />
cofferdam for the pillar basement is composed of double<br />
sheet piles Type AZ 17-700 and 12 meter <strong>in</strong> length.<br />
For the sheet pil<strong>in</strong>g MT Højgaard uses a Movax SP-70<br />
mounted on a 34 ton excavator equipped with Movax<br />
Automatic Steer<strong>in</strong>g system. Whilst pil<strong>in</strong>g, the excavator<br />
is positioned on a pontoon.<br />
On the cover:<br />
<strong>MOVAX</strong> <strong>M<strong>in</strong>i</strong> <strong>Leader</strong> <strong>Rig</strong> <strong>MLR</strong>-<strong>15</strong><br />
<strong>Leader</strong> mounted Side-Grip vibro<br />
for 7 - 21 ton excavators<br />
<strong>New</strong>est member of Movax-family, <strong>MLR</strong>-<strong>15</strong>, is made for<br />
<strong>in</strong>stallation of tubular micropiles, H-piles or timber piles.<br />
It is designed to meet the high position accuracy and<br />
straightness demands for example at solar panel fields.<br />
<strong>MLR</strong>-<strong>15</strong> can use lightweight pil<strong>in</strong>g material because it<br />
is able to take side-grip of pile close to ground level <strong>in</strong><br />
which case the flexibility of pile does not disturb the<br />
driv<strong>in</strong>g process. Us<strong>in</strong>g lightweight pil<strong>in</strong>g material and<br />
standard midi excavator for pil<strong>in</strong>g process reduces costs<br />
of a micro pil<strong>in</strong>g project.<br />
Movax <strong>MLR</strong>-<strong>15</strong> can grip pile ly<strong>in</strong>g on the ground, lift it<br />
up to vertical position, locate it and then drive it <strong>in</strong>to<br />
the ground with a straight l<strong>in</strong>ear movement. <strong>MLR</strong>-<strong>15</strong><br />
is easy to attach to standard excavators allow<strong>in</strong>g easy<br />
swap from carrier to another.<br />
Side-grip clamps are quick change -type, which enables<br />
fast change between different pil<strong>in</strong>g materials. There<br />
are clamps available for steel tubes, H-beams and timber<br />
piles. Customer can also request clamps for other<br />
special pile profiles.