Objective: Establish practical design<br />

procedures that account for effects of time<br />

on the axial bearing capacity of piles<br />

Elements:<br />

‣ Collect and sumarise available data on time effects axial bearing<br />

capacity<br />

‣ Perform new pile load tests in the field, with specific focus on time<br />

effects:<br />

• 6 test sites<br />

• Pile tested: Open pipe piles, typically D=400 mm, L= 20 m<br />

‣ Develop new design procedures<br />

‣ Disseminate results to ensure that they get incorporated into<br />

national and international design guidelines and codes