12.04.2014 Views

Petzl Sport 2012 Catalog

Petzl Sport 2012 Catalog

Petzl Sport 2012 Catalog

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ROCK CLIMBING<br />

Rappelling on multi-pitch routes<br />

On a rappel descent, the rope techniques require<br />

vigilance and organization. All maneuvers at the<br />

belay must be done while tethered to the belay.<br />

Installing the rope in the anchor<br />

1. Make sure that the rappel station consists of two connected<br />

points. Tie an overhand bend. Tighten the knot connecting the<br />

two rope ends well.<br />

30 cm<br />

minimum<br />

Install the self-jamming device and the<br />

descender<br />

2. The self-jamming device holds the user if he needs to<br />

release his hands during the rappel (falling rocks, knots in<br />

rope...). Installing the self-jamming device below the descender<br />

creates slack which allows easy installation of the descender.<br />

Attach the self-jamming device to the belay loop of the harness<br />

with a girth hitch, so it can not be lost.<br />

Note: A knot at the end of the rope is a necessary precaution<br />

in a variety of situations (long rappel, poor visibility, fatigue...).<br />

+<br />

+<br />

Information is non-exhaustive. Refer to the other pages as well as to the user instructions and technical manuals. Technical training is essential.<br />

© Lafouche<br />

18<br />

Contents

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!