14.04.2014 Views

Land use plan - Manchester Airport

Land use plan - Manchester Airport

Land use plan - Manchester Airport

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Development Appraisal<br />

• Redevelopment: Establish whether existing<br />

developed sites within the Operational Area are<br />

suitable for the location of the development. This<br />

includes the redevelopment of previously <strong>use</strong>d or<br />

under <strong>use</strong>d sites, ‘in fill’ and the redevelopment or<br />

extension of existing buildings if economically viable.<br />

• Operational Area: Are appropriate sites available<br />

within the Operational Area?<br />

• Environment: How can the proposed development<br />

be undertaken whilst minimising the environmental<br />

impact?<br />

This sequential approach will be <strong>use</strong>d along with a set of<br />

criteria for site assessment. It will also ensure that any<br />

development proposal is in line with our Master Plan as<br />

well as our Ground Transport Plan and Environment Plan.<br />

Location requirements will play a key role in our site<br />

assessments. A number of <strong>use</strong>s will require direct access<br />

to the airfield and the terminals. In preparing our <strong>Land</strong><br />

Use Plan, development will be directed to appropriate<br />

locations within the Operational Area. Safety and security<br />

and the needs of our customers are also key<br />

considerations when identifying future land <strong>use</strong>s and<br />

airport activity.<br />

16

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!