Bolt Test Test Date Hole Length Hole Angle Comments<br />

No.<br />

26(27) 8 th Sept. „09 1.2m (Actual<br />

bolt Length<br />

20 deg<br />

(Sidewall)<br />

0.3m encapsulation at<br />

the toe<br />

1.4m)<br />

28(29) 8 th Sept. „09 2.05m 20 deg<br />

(Sidewall)<br />

1.0m encapsulation at<br />

the toe<br />

2-6 16 th Oct. „09 2.0m 75 deg<br />

(Backs)<br />

1.0m encapsulation at<br />

the toe – Pull Testing<br />

conducted at 4, 6, 10 and<br />

12.5 tonnes<br />

9 - 15 16 th Oct. „09 2.03m 75 deg<br />

(Backs)<br />

0.5m encapsulation at<br />

the toe - Pull Testing<br />

conducted at 4, 6, 8, 10<br />

and 12.5 tonnes<br />

23(24) 8 th Sept. „09 2.0m 20 deg<br />

(Sidewall)<br />

0.5m encapsulation at<br />

the toe<br />

22 8 th Sept. „09 2.0m 20 deg<br />

(Sidewall)<br />

Full encapsulation<br />

Table 7 – Friction Bolts Calibration Set-up.<br />

Bolt Test Test Date Hole Length Hole Angle Comments<br />

No.<br />

30 8 th Sept. „09 2.4m 20 deg<br />

(Sidewall)<br />

Standard installation<br />

(Damaged grind at 1.2m)<br />

31 (32) 8 th Sept. „09 2.4m 20 deg Standard installation<br />

(Sidewall)<br />

35 8 th Sept. „09 2.4m 20 deg Standard installation<br />

(Sidewall)<br />

34 8 th Sept. „09 2.4m 20 deg<br />

(Sidewall)<br />

Standard installation<br />

(Damaged slots cut at<br />

1.2m)<br />

Table 8 – Single Strand Cable Bolts test result summary.<br />