30.04.2014 Views

Zintars Z. Zadins - US Nuclear Waste Technical Review Board

Zintars Z. Zadins - US Nuclear Waste Technical Review Board

Zintars Z. Zadins - US Nuclear Waste Technical Review Board

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Environmental West Valley Demonstration Impact Project Statement (EIS) – Record of<br />

Decision (ROD)<br />

• Phased Decisionmaking Alternative<br />

– Two Phases<br />

• Phase 1<br />

– Expected to begin July 2011<br />

– Relocate HLW Canisters to a new on-site storage pad<br />

– Remove major facilities: Main Plant Process Building (Main Plant) and Vitrification<br />

Facility<br />

– Remove North Plateau Groundwater Plume source area<br />

– Remove Remote Handled <strong>Waste</strong> Facility and wastewater treatment facilities<br />

• Phase 2<br />

– Final decommissioning of remaining facilities<br />

» HLW Tank Farm<br />

» NRC-licensed Disposal Area<br />

» Construction and Demolition Debris Landfill<br />

» Non-source area of plume<br />

» State-licensed Disposal Area<br />

www.wv.doe.gov<br />

20957_2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!