Feasibility study on a capital-based income generation scheme for ...
Feasibility study on a capital-based income generation scheme for ...
Feasibility study on a capital-based income generation scheme for ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Appendix 8: Costs and m<strong>on</strong>thly net <strong>income</strong><br />
projected from participati<strong>on</strong> in <strong>income</strong> generating<br />
projects offered by Save the Children in<br />
Trincomalee District<br />
Activity<br />
Total cost<br />
in Rs<br />
Cost of activity<br />
Logistical and admin<br />
cost<br />
Rs %<br />
Numbers<br />
of HHs<br />
benefiting<br />
Cost per<br />
HH<br />
Forecast<br />
return per<br />
m<strong>on</strong>th<br />
6,000 in<br />
CfW 1, 081 ,818 248,818 23 135<br />
6,000<br />
average<br />
2,000-<br />
Poultry 5,290,322 2,010,322 38 164 20,000<br />
3,000<br />
Paddy<br />
15,000- 3,000-<br />
29,853,225 11,344,225 38 666<br />
cultivati<strong>on</strong><br />
50,000 5,000<br />
Home<br />
2,000-<br />
1,451,613 551,613 38 36 25,000<br />
gardening<br />
3,000<br />
Goat<br />
2,500-<br />
3,000,000 1,140,000 38 93 20,000<br />
rearing<br />
3,000<br />
Tools <strong>for</strong><br />
7,500-<br />
1,258,065 478,065 38 39 20,000<br />
mas<strong>on</strong>ry<br />
10,000<br />
Tools <strong>for</strong><br />
5,000-<br />
1,935,484 735,484 38 48 25,000<br />
carpentry<br />
7,000<br />
Sewing<br />
2,500-<br />
1,516,129 576,129 38 47 20,000<br />
machine<br />
3,000<br />
Bullock<br />
8,000-<br />
967,742 367,742 38 12 50,000<br />
carts<br />
10,000<br />
Fishing<br />
5,000-<br />
1,854,839 704,839 38 23 50,000<br />
canoes<br />
6,000<br />
Fishing<br />
10,000-<br />
241,935 91,935 38 1 150,000<br />
FRP<br />
15,000<br />
Small<br />
3,000-<br />
6,814,516 2,589,516 38 169 25,000<br />
business<br />
4,000<br />
Bakery<br />
7,000-<br />
80,645 30,645 38 1 50,000<br />
business<br />
8,000<br />
Total 55,345,333 20,869,333 38 1,434 - -<br />
Note: Current budget analysis of expenditure patterns show that the administrati<strong>on</strong> and logistical costs are<br />
varying at different levels within the organisati<strong>on</strong>. At the central level the cost is equivalent to 13 per cent of the<br />
total programme cost and at the district level the cost is equivalent to ten per cent of the programme cost.<br />
Administrati<strong>on</strong> and logistical costs incurred by partners are equivalent to 15 per cent of the total project cost.<br />
67