Signature_split_system - Paramount Pools
Signature_split_system - Paramount Pools
Signature_split_system - Paramount Pools
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Pools</strong> & Spas<br />
SPLIT<br />
SYSTEM<br />
Introducing the<br />
new <strong>Signature</strong><br />
‘SPLIT-SYSTEM’<br />
an ideal<br />
alternative<br />
for restricted<br />
access or indoor<br />
environments.<br />
<strong>Signature</strong> <strong>Pools</strong><br />
have pioneered and<br />
developed the first ever<br />
Split-tiled Pool System.<br />
Incorporating all of the<br />
major benefits of<br />
their one-piece<br />
swimming pool, the<br />
<strong>split</strong>-<strong>system</strong> enables<br />
the pool contractor to<br />
gain access to difficult<br />
domestic or commercial<br />
properties where site<br />
access is restricted.<br />
10 x 4.5m one-piece<br />
conventional pool delivery<br />
Same pool placed within a 40ft<br />
container<br />
Not only does the <strong>Signature</strong> ‘Split System’<br />
enable you more versatility in design<br />
concept and delivery methods, the<br />
<strong>system</strong> also saves you money!<br />
As one-piece pools have to be shipped<br />
via a flat rack <strong>system</strong>, logistical costs are<br />
far higher. Providing the site access can<br />
accept a 20/40ft container lorry then<br />
savings in excess of 25% can be achieved<br />
even after the added labour cost of<br />
jointing the pool on site!<br />
<strong>Signature</strong> Swimming <strong>Pools</strong> | Telephone 01256 748388<br />
“savings in excess<br />
of 25% can be achieved”<br />
Pool project can be installed within<br />
two weeks!
The <strong>Signature</strong> Split-System Process<br />
Sectional drawing specification<br />
Pool mould cut in half ready for<br />
tiling & insulation preparation<br />
All sections bolted together and<br />
then tiled leaving a 600mm gap<br />
All sections un-bolted and<br />
packed ready for shipment<br />
GRP laminate finish applied to<br />
all joints by approved contractor<br />
Pool loaded into 20/40ft<br />
container<br />
46m Millennium Hotel Project<br />
Pool sections delivered to site<br />
and bolted together<br />
Tried and tested!<br />
The Millennium Hotel project<br />
- 46m x 26m (widest part) the<br />
largest composite pool in the<br />
world along with two<br />
22m x 4.8m Infinity Edge<br />
beachfront pools linked together.<br />
Manufactured to ISO 9001 status.<br />
Installed within days.<br />
Epoxy Adhesive & Grout used on all pools.<br />
Insulated to Part L requirements.<br />
100% Waterproof.<br />
No inclemental weather delays<br />
Stronger than concrete<br />
No building delays<br />
No pool fittings to install on site<br />
No reliance on sub-contractors<br />
<strong>Signature</strong> Swimming <strong>Pools</strong> | & Telephone Spas 0044 (0)1256 748388