14.05.2014 Views

Installation guide - Paramount Pools

Installation guide - Paramount Pools

Installation guide - Paramount Pools

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

INSTALLATION<br />

STEP 35<br />

Put three layers of duct tape over all joints.<br />

If you are using foam coves, clip them at the base of<br />

the panel. There should be no gaps between them.<br />

If you don’t have foam coves, use sand instead.<br />

If you are using sand, bank the sand against the wall to<br />

form a cove 15.24 cm high (6”) and 15.24 cm wide (6”)<br />

at ground level. Water the sand to compact it and use<br />

a trowel to spread it evenly.<br />

58

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!