15.05.2014 Views

Addendum 5 - Pavilion Construction

Addendum 5 - Pavilion Construction

Addendum 5 - Pavilion Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Addendum</strong><br />

<strong>Addendum</strong> No.: 005<br />

Date: 9-26-2011<br />

Project: Mountain View Apartments<br />

Project No.: 10-0131<br />

From:<br />

To:<br />

Dekker/Perich/Sabatini<br />

7601 Jefferson St. NE, Suite 100<br />

Albuquerque, NM 87109<br />

All Prospective Bidders and Plan Holders<br />

This <strong>Addendum</strong> forms a part of the Bid Documents and modifies the Bid Documents issued by<br />

Dekker/Perich/Sabatini (D/P/S) and dated 8-31-2011. Acknowledge receipt of this <strong>Addendum</strong> on the Bid Form.<br />

Failure to do so may subject the Bidder to disqualification. All other provisions of the Bid Documents shall remain<br />

unchanged. This <strong>Addendum</strong> contains a total of 7- 8 ½”x11” pages and 0- 24” x 36” sheets.<br />

1. BIDDING REQUIREMENTS:<br />

1.1. 00 41 13 – BID FORM<br />

1.1.1. Replace this section in its entirety.<br />

2. GENERAL:<br />

2.1. Asphalt Surface Treatment<br />

2.1.1. Existing asphalt paving shall be resurfaced with a “Fog Sealer” (slurry type) and restriped.<br />

3. SPECIFICATIONS:<br />

3.1. 32 92 23 –PART 2 – GRASS SODDING<br />

3.1.1. Replace this part of Section 32 92 23 with the attached text.<br />

3.2. 32 92 23 –PART 3 – GRASS SODDING<br />

3.2.1. Replace this part of Section 32 92 23 with the attached text.<br />

All other provisions of the Contract Documents shall remain unchanged. This addendum is hereby made a part of the<br />

Contract Documents to the same extent as those provisions contained in the original documents and all itemized listings<br />

thereof.<br />

End of <strong>Addendum</strong><br />

H:\10-0131 Mtn View-MFA\<strong>Construction</strong>\Bidding\ADD-005.doc


Mountain View Apartments<br />

1101 Shelly Dr.<br />

Deming, NM 88030<br />

DOCUMENT 00 41 13 - BID FORM<br />

1.1 BID INFORMATION<br />

A. Bidder:<br />

(ADDRESS)<br />

B. Project Name: Mountain View Apartments<br />

C. Project Location: 1101 Shelly Drive, Deming, New Mexico 88030<br />

D. Owner: YES Mountain View Apartments Limited Partnership, LLLP<br />

E. Architect: Dekker/Perich/Sabatini, Ltd.<br />

1.2 CERTIFICATIONS AND BASE BID<br />

A. Bidder declares that the only person or parties interested in the bid as principals are those named herein;<br />

that the bid is made without collusion with any firm or corporation; that Bidder has carefully examined<br />

all contract documents and has made a personal examination of the site of the work; that Bidder shall<br />

furnish all necessary machinery, tools, apparatus and other means of construction, and Bidder will do all<br />

the work and provide all the materials specified in the manner and the time prescribed.<br />

B. Base Bid, Single-Prime (All Trades) Contract: The undersigned (hereinafter called "Bidder"), in<br />

compliance with your invitation for bids, having carefully examined the contract documents and the site<br />

of the proposed work, and being familiar with all conditions surrounding the construction of the proposed<br />

project including the availability of materials and labor, hereby proposes to provide all labor, materials,<br />

and supplies, and to construct the project in accordance with the contract documents, within the time set<br />

forth herein, and at the lump sum prices stated below. These prices shall cover all expenses incurred in<br />

performing the work required under the contract documents of which this proposal is a part. All amounts<br />

shall be shown in both words and figures. In case of discrepancies, the amount shown in words will<br />

govern.<br />

C. Bidder agrees to perform the Work described as the Base Bid in the specifications and shown on the<br />

drawings for the stipulate- sum price of:<br />

(Dollars)($)<br />

(not including NMGRT - Reimbursement for NMGRT will be added on certificates for payment)<br />

D. Alternate Number One: Bidder agrees to perform the Work described as Alternate Number One in<br />

Section 01 23 00 and described in the report by Horizon Mechanical, Inc. for the lump- sum price of:<br />

(Dollars)($)<br />

(not including NMGRT - Reimbursement for NMGRT will be added on certificates for payment)<br />

00 41 13-1


1.3 ACKNOWLEDGMENT OF ADDENDA<br />

A. Bidder acknowledges receipt of the following addenda to the drawings and project manuals, all of the<br />

provisions and requirements of which addenda have been taken into consideration in the preparation of<br />

this proposal.<br />

<strong>Addendum</strong> No. Dated <strong>Addendum</strong> No. Dated<br />

<strong>Addendum</strong> No. Dated <strong>Addendum</strong> No. Dated<br />

<strong>Addendum</strong> No. Dated <strong>Addendum</strong> No. Dated<br />

1.4 BID GUARANTEE<br />

A. Bidder agrees that this Bid Proposal may not be withdrawn for a period of thirty (30) calendar days after<br />

the Bid Opening. If the contract is to be awarded, Owner will give the successful Bidder a Notice of<br />

Award within thirty (30) days after the Bid opening.<br />

B. Bidder hereby agrees to execute the said contract and bond within ten (10) days, or such other time as<br />

may be allowed in writing by the Owner, after receiving notification of acceptance of bid. It is hereby<br />

mutually understood and agreed that in case the undersigned does not, Bidder forfeits the full amount of<br />

the accompanying check or bid bond to the Owner as liquidated damages, and said Owner may proceed<br />

to award the contract to others.<br />

C. Bidder tenders herewith, as a Bid Security (section 00 21 13), for which receipt has been given, a<br />

certified check or bid bond, in the amount of:_________________________ Dollars ($____________)<br />

drawn to the benefit of the Owner.<br />

1.5 SUBCONTRACTORS AND SUPPLIERS<br />

A. The following companies shall execute subcontracts for the portions of the Work indicated:<br />

1. Concrete Work: ________________________________________________________.<br />

2. Roofing Work: _________________________________________________________.<br />

3. Gypsum Board Work: ___________________________________________________.<br />

4. Plumbing Work: ________________________________________________________.<br />

5. HVAC Work: __________________________________________________________.<br />

6. Electrical Work: ________________________________________________________.<br />

1.6 TIME OF COMPLETION<br />

A. Bidder agrees to commence the work within ten (10) days, or such further time as may be allowed in<br />

writing by the Owner, after receiving a Notice to Proceed. Bidder agrees that all work items shall be<br />

completed within two hundred ten (210) consecutive calendar days (section 00 73 00).<br />

B. Bidder hereby agrees to pay the Owner the sum of Five Hundred Dollars ($500.00) as liquidated<br />

damages (section 00 73 00) for each consecutive calendar day of delay until the Work is substantially<br />

complete.<br />

00 41 13 - 2


1.7 PERFORMANCE AND PAYMENT BONDS<br />

A. Bidder proposes to furnish a Performance Bond and Payment Bond (section 00 73 00) in the amount of<br />

100% of the Contract Sum as surety conditioned for the full, complete, and faithful performance of this<br />

contract, and to indemnify and save harmless the Owner from any damage or loss for which the Owner<br />

may become liable by the default of Bidder, or by reason of any neglect or carelessness on the part of<br />

Bidder, Bidder’s agents or employees, or by or on account of any act of omission of said contractor,<br />

Bidder’s servants, agents or employees, or subcontractors, in performance of this contract.<br />

B. Bidder shall guarantee all work performed under these drawings, specifications and contract, and shall<br />

repair and maintain same until the date of acceptance by the Owner.<br />

C. Bidder agrees within ten (10) days after the agreement is executed, to deliver to the Owner the<br />

certificates of insurance and original insurance policies required in the General Conditions and<br />

Supplementary General Conditions (section 00 73 00).<br />

1.8 SUBMISSION OF BID<br />

This Bid Proposal is hereby respectfully submitted. The signatory hereto certifies and warrants that<br />

he/she has full authority to submit this Bid Proposal on behalf of Bidder.<br />

(Name of Bidder)(Type or Print)<br />

(Specify if sole proprietorship, partnership,<br />

or corporation, and state of incorporation)<br />

By (Signature) Date<br />

Corporate Seal:<br />

(Name)<br />

(Title)<br />

(Print Name & Title of Bidder’s Authorized Representative)<br />

(Address of Bidder)<br />

(Telephone Number of Bidder<br />

(Bidder’s New Mexico Contractor’s<br />

License No. and Classification)<br />

END OF DOCUMENT<br />

00 41 13 - 3


Replace Part 2-Products text on Pages 5 and 6 of specification 32 92 23 Grass Sodding with the following<br />

text:<br />

2.2 INORGANIC SOIL CONDITIONER<br />

A. Sulfur: Granular, biodegradable, containing a minimum of 90 percent sulfur, and with a<br />

minimum of 99 percent passing through No. 6 (3.35-mm) sieve and a maximum of 10 percent<br />

passing through No. 40 (0.425-mm) sieve.<br />

2.3 ORGANIC SOIL AMENDMENTS<br />

A. Compost: Well-composted, stable, and weed-free organic matter, pH range of 5.5 to 8;<br />

moisture content 35 to 55 percent by weight; 100 percent passing through 3/4-inch (19-mm)<br />

sieve; soluble salt content of 5 to 10 decisiemens/m; not exceeding 0.5 percent inert<br />

contaminants and free of substances toxic to plantings; and as follows:<br />

1. Organic Matter Content: 50 to 60 percent of dry weight.<br />

2. Feedstock: Agricultural, food, or industrial residuals; biosolids; yard trimmings; or<br />

source-separated or compostable mixed solid waste.<br />

B. Manure: Well-rotted, unleached, stable or cattle manure containing not more than 25 percent by<br />

volume of straw, sawdust, or other bedding materials; free of toxic substances, stones, sticks,<br />

soil, weed seed, and material harmful to plant growth.<br />

2.4 PLANTING SOILS<br />

A. Planting Soil: ASTM D 5268 topsoil, with pH range of 5.5 to 7, a minimum of 4 percent<br />

organic material content; free of stones 1 inch (25 mm) or larger in any dimension and other<br />

extraneous materials harmful to plant growth. Mix ASTM D 5268 topsoil with the following<br />

soil amendments in the following quantities to produce planting soil:<br />

1. Ratio of Loose Compost to Topsoil by Volume: 1:3.<br />

2.5 WATER<br />

A. Water for maintaining sod shall be clean and free from pollutants, which would be harmful to<br />

plant growth or contaminate the environment.<br />

Replace part 3- Execution text on pages 6-8 of specification 32 92 23 Grass Sodding with the following<br />

text:<br />

3.1 EXAMINATION


A. Examine areas to be planted for compliance with requirements and other conditions affecting<br />

performance.<br />

1. Verify that no foreign or deleterious material or liquid such as paint, paint washout,<br />

concrete slurry, concrete layers or chunks, cement, plaster, oils, gasoline, diesel fuel,<br />

paint thinner, turpentine, tar, roofing compound, or acid has been deposited in soil within<br />

a planting area.<br />

2. Do not mix or place soils and soil amendments in frozen, wet, or muddy conditions.<br />

3. Suspend soil spreading, grading, and tilling operations during periods of excessive soil<br />

moisture until the moisture content reaches acceptable levels to attain the required results.<br />

4. Uniformly moisten excessively dry soil that is not workable and which is too dusty.<br />

B. Proceed with installation only after unsatisfactory conditions have been corrected.<br />

C. If contamination by foreign or deleterious material or liquid is present in soil within a planting<br />

area, remove the soil and contamination as directed by Architect and replace with new planting<br />

soil.<br />

3.2 PREPARATION<br />

A. Protect structures, utilities, sidewalks, pavements, and other facilities, trees, shrubs, and<br />

plantings from damage caused by planting operations.<br />

1. Protect grade stakes set by others until directed to remove them.<br />

B. Install erosion-control measures to prevent erosion or displacement of soils and discharge of<br />

soil-bearing water runoff or airborne dust to adjacent properties and walkways.<br />

3.3 TURF AREA PREPARATION<br />

A. Limit turf subgrade preparation to areas to be planted.<br />

B. Newly Graded Subgrades: Loosen subgrade to a minimum depth of 6 inches (100 mm).<br />

Remove stones larger than 1 inch (25 mm) in any dimension and sticks, roots, rubbish, and<br />

other extraneous matter and legally dispose of them off Owner's property.<br />

1. Spread planting soil to a depth of 4 inches (100 mm) but not less than required to meet<br />

finish grades after light rolling and natural settlement. Do not spread if planting soil or<br />

subgrade is frozen, muddy, or excessively wet.<br />

a. Spread planting soil, organic soil amendments, and soil conditioner over loosened<br />

subgrade. Mix thoroughly into top 6 inches (100 mm) of subgrade.<br />

b. Reduce elevation of planting soil as necessary to allow for soil thickness of sod.<br />

C. Unchanged Subgrades: If turf is to be planted in areas unaltered or undisturbed by excavating,<br />

grading, or surface-soil stripping operations, prepare surface soil as follows:<br />

1. Remove existing grass, vegetation, and turf. Do not mix into surface soil.


2. Loosen surface soil to a depth of at least 8 inches (200 mm). Apply soil amendments and<br />

fertilizers according to planting soil mix proportions and mix thoroughly into top 6 inches<br />

(100 mm) of soil. Till soil to a homogeneous mixture of fine texture.<br />

3. Remove stones larger than 1 inch (25 mm) in any dimension and sticks, roots, trash, and<br />

other extraneous matter.<br />

4. Legally dispose of waste material, including grass, vegetation, and turf, off Owner's<br />

property.<br />

D. Finish Grading: Grade planting areas to a smooth, uniform surface plane with loose, uniformly<br />

fine texture. Grade to within plus or minus 1/2 inch (13 mm) of finish elevation. Roll and rake,<br />

remove ridges, and fill depressions to meet finish grades. Limit finish grading to areas that can<br />

be planted in the immediate future.<br />

E. Moisten prepared area before planting if soil is dry. Water thoroughly and allow surface to dry<br />

before planting. Do not create muddy soil.<br />

F. Before planting, obtain Architect's acceptance of finish grading; restore planting areas if eroded<br />

or otherwise disturbed after finish grading.<br />

3.4 SODDING<br />

A. Lay sod within 24 hours of harvesting. Do not lay sod if dormant or if ground is frozen or<br />

muddy.<br />

B. Lay sod to form a solid mass with tightly fitted joints. Butt ends and sides of sod; do not stretch<br />

or overlap. Stagger sod strips or pads to offset joints in adjacent courses. Avoid damage to<br />

subgrade or sod during installation. Tamp and roll lightly to ensure contact with subgrade,<br />

eliminate air pockets, and form a smooth surface. Work sifted soil or fine sand into minor<br />

cracks between pieces of sod; remove excess to avoid smothering sod and adjacent grass.<br />

1. Lay sod across angle of slopes exceeding 1:3.<br />

2. Anchor sod on slopes exceeding 1:6 with wood pegs spaced as recommended by sod<br />

manufacturer but not less than 2 anchors per sod strip to prevent slippage.<br />

C. Saturate sod with fine water spray within two hours of planting. During first week after<br />

planting, water daily or more frequently as necessary to maintain moist soil to a minimum depth<br />

of 1-1/2 inches (38 mm) below sod.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!