Spectacle of Lights - PLSN.com
Spectacle of Lights - PLSN.com
Spectacle of Lights - PLSN.com
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
NEWS<br />
Folger Theatre Back Up with Industry Help<br />
MIDDLETON, WI —When a fire recently resulted<br />
in water damage to the theatre in the<br />
Folger Shakespeare Library, ETC and dealer<br />
Barbizon Capitol, as well as the stage <strong>com</strong>munity<br />
at large, went into high gear to make sure<br />
that the theatre would not be dark for long.<br />
Fabric ignited in a third-floor costume storage<br />
area above the theatre on Saturday, October<br />
14. The fire was swiftly extinguished and<br />
contained, but the theatre’s dimming systems<br />
were only 20 feet away from <strong>of</strong> the fire and<br />
were directly affected by the downpour from<br />
the sprinkler system. The 13-year-old dimmers<br />
had also been on at the time, in preparation for<br />
a tech run-through <strong>of</strong> the up<strong>com</strong>ing production<br />
<strong>of</strong> A Midsummer Night’s Dream and would<br />
have to be immediately replaced.<br />
Barbizon Capitol technician Blair Van Oot<br />
inspected the damaged dimmers that day. On<br />
Monday, Barbizon Systems division manager<br />
Barry Gawinski surveyed the damage and<br />
contacted ETC. Phil Sens and Ted Ozimek at<br />
ETC quoted new dimmers, secured owners’<br />
approvals on Tuesday, and set in motion the<br />
air shipment <strong>of</strong> two ETC Sensor+ racks populated<br />
with 72 modules, with another 24 modules<br />
to arrive later by ground. The new ETC<br />
racks were installed on Friday by contractors<br />
from Cooper Electric and were ready that afternoon<br />
for a new tech run-through.<br />
Eric Grims, Folger production manager<br />
and technical director, voiced gratitude to<br />
those who rallied around the Theatre: “There<br />
was never any doubt about whether or not<br />
they would be able to get us back up and running<br />
in what seemed like a nearly impossible<br />
amount <strong>of</strong> time.”<br />
Van Oot adds that the response <strong>of</strong> the<br />
local stage <strong>com</strong>munity was also extraordinary<br />
and laudable: “Theatre techs from<br />
almost every theatre in the area showed<br />
up to help out with the damage and to get<br />
the show up – Kennedy Center, Arena, Lincoln,<br />
Woolly Mammoth, Shakespeare, Signature,<br />
Center Stage <strong>of</strong> Baltimore – just to<br />
mention a few.”<br />
The rescheduled first preview <strong>of</strong> Folger<br />
Theatre’s A Midsummer Night’s Dream took<br />
place on Tuesday, October 24. Folger is confident<br />
that no lasting damage remains to<br />
the landmark.<br />
Erik Magnuson Dies<br />
continued from cover<br />
A memorial service took place Sunday,<br />
December 10 at the Atlanta Botanical<br />
Garden.<br />
The family requests that in lieu <strong>of</strong> flowers<br />
donations be made to the new industry<br />
charity Behind the Scenes (http://<br />
www.estafoundation.org/bts.htm), or to<br />
the Appalachian Trail Conservancy.<br />
ESTA issued a statement saying that<br />
Magnuson “will be greatly missed by all<br />
<strong>of</strong> us. Our thoughts and prayers are with<br />
his wife Linda, his son Todd and daughter<br />
Ingrid, and with the staff <strong>of</strong> The Magnum<br />
Companies.”<br />
Public Proposed<br />
Standards<br />
NEW YORK — ESTA has extended the<br />
public review period for a standards proposal,<br />
and has announced another’s deadline.<br />
The deadline for the review period for<br />
both BSR E1.27-2, Entertainment Technology-Standard<br />
for Permanently Installed<br />
Control Cables for Use with ANSI E1.11<br />
(DMX512-A) and USITT DMX512/1990<br />
Products, and BSR E1.6-1, Entertainment<br />
Technology–Powered Winch Hoist Systems,<br />
is now December 25.<br />
The BSR E1.27-2 draft standard describes<br />
the types <strong>of</strong> cable to be used to<br />
interconnect products that <strong>com</strong>ply with<br />
ANSI E1.11-2004 (DMX512-A) or with USITT<br />
DMX512/1990 in permanent installations.<br />
The description includes definitions <strong>of</strong> acceptable<br />
cable and connector types and<br />
the ways in which they may be used. The<br />
draft standard and its supporting public<br />
review materials are available at http://<br />
www.esta.org/tsp/documents/public_review_docs.php.<br />
The next meeting at which the public<br />
<strong>com</strong>ments will be considered, is scheduled<br />
for Saturday, January 20, at the Dallas/Ft.<br />
Worth Airport Marriott South in Ft. Worth,<br />
Texas.<br />
The draft standard, BSR E1.6-1 deals with<br />
powered winch systems that do not use<br />
serially manufactured electric chain hoists,<br />
and is intended to establish requirements<br />
for the design, manufacture, inspection<br />
and maintenance <strong>of</strong> powered winch hoist<br />
systems for lifting and suspending loads<br />
in theatres and other places <strong>of</strong> public assembly.<br />
The public review materials are<br />
available on the ESTA website at http://<br />
www.esta.org/tsp/documents/public_review_docs.php.<br />
For more information, please contact<br />
Karl G. Ruling, Technical Standards Manager,<br />
ESTA, 875 Sixth Avenue, Suite 1005, New<br />
York, NY 10001, standards@esta.org<br />
TOMCAT Aquired<br />
continued from cover<br />
TOMCAT USA, Inc., TOMCAT UK, Ltd., TOM-<br />
CAT de Mexico and TOMCAT’s sister <strong>com</strong>pany,<br />
Brilliant Stages, in Hitchen, Herts, United<br />
Kingdom, acquired in 1998. The <strong>com</strong>pany<br />
also has two distribution hubs: one in Las Vegas,<br />
Nev. and one in Nashville, Tenn., where<br />
the <strong>com</strong>pany plans to expand its manufacturing<br />
capabilities.<br />
Ad info:http:// www.plsn.<strong>com</strong>/instant-info