02.06.2014 Views

AUGREEN Block Wall System

AUGREEN Block Wall System

AUGREEN Block Wall System

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Presentation of<br />

“<strong>AUGREEN</strong>”<br />

BLOCK WALL SYSTEM<br />

For<br />

Green Council<br />

By: CaSO (HK) Eng. Co. Ltd<br />

Date: 15 August 2008


Why ?<br />

“<strong>AUGREEN</strong> Gypsum block”<br />

=<br />

“Green” product


Environmental Friendly<br />

GYPSUM BLOCK<br />

VS<br />

CONCRETE BLOCK


Environmental Friendly<br />

8 benefits to our society and<br />

construction industry<br />

Regulate relative humidity (R.H.)<br />

Reuse of Sulphur dioxide(SO 2 )<br />

Energy efficient<br />

Light weight


Environmental Friendly<br />

8 benefits to our society and<br />

construction industry<br />

Less construction waste<br />

Recyclable<br />

Less “wet-trade”<br />

No harm to health


(1) Regulate relative humidity<br />

Absorb moist from air and<br />

release out when R.H.<br />

drops<br />

Stop running water on wall<br />

during February to May


(2) Reuse of Sulphur Dioxide<br />

CaCO 3 + SO 2 CaSO 4 · ½ H 2 O<br />

(i.e. 50% of gypsum block is made by the de-<br />

sulphur gypsum. China light will build FGD<br />

plant to reuse of SO 2 in 2009!)<br />

Prevent production of acid rain


(3) Energy-efficient<br />

efficient<br />

50% saving of energy during<br />

production process for gypsum<br />

than cement<br />

70% more materials can be used<br />

of same tonnage (i.e. Coverage)<br />

>> 70% of production energy<br />

saving per tonnage.


(4) Light-weight<br />

780kg/m 3 - 900kg / m 3<br />

1,950kg / m 3<br />

VS<br />

Less than 1000MT dead load for<br />

20 storey building >> Longer life!!


(5) Less rubbish<br />

Less rubbish from plastering<br />

>> Save $$ on handling<br />

construction waste.


(6) Recyclable<br />

Hydrated gypsum Calcined<br />

gypsum<br />

Recycling process can be done<br />

under heat and pressure


(7) Less “Wet-trade”<br />

Better site environment<br />

Less wastage


(8) No harm to health


Benefits for the<br />

developer<br />

1. More spacious<br />

2. Sound insulation<br />

3. Fire protection<br />

4. Light weighted


Benefits for the<br />

development<br />

5. Good alignment<br />

6. Environment friendly<br />

7. Easy to be maintained<br />

8. Cost savings


1. More spacious<br />

80 mm Vs 130mm (100 mm concrete<br />

block wall with 2 layers of 15mm plasters)<br />

thickness each wall with 2 hrs FRP<br />

100mm Vs 265mm (225mm concrete<br />

block wall with 2 layers of 15mm plasters)<br />

for basement with 4 hrs FRP


2. Sound Insulation<br />

STC From 37dB – 41dB by single<br />

layer, STC 66dB can be achieved by<br />

double wall system<br />

It had been used in Newport cinema<br />

to be the sound insulation partition;<br />

band rooms for BGCA.


3. Fire Protection<br />

2 hrs – 4 hrs FRP can be achieved by<br />

80mm and 100mm gypsum block<br />

It has achieved BD approval in 2005.<br />

www.bd.gov.hk/english/inform/CDB/C<br />

DBOFRP.pdf (Our ref.# BD - E003;<br />

E226)


4. Light Weight<br />

780kg / m 3 of Gypsum Vs 1,950kg /<br />

m 3 of concrete<br />

It is suitable for A&A works for loading<br />

calculation.<br />

It can save some steel rebar at<br />

“footing”


5. Good alignment<br />

Due to the precise “Tongue & Groove”<br />

joint, flat and smooth surface can be<br />

achieved (0.5 mm tolerance)<br />

It does not require plastering so that<br />

painting, wall-paper or tiles can be put<br />

directly on gypsum block


6. Environmental Friendly<br />

It is contribution to our environment<br />

and society without additional cost<br />

It is the worldwide responsibility to<br />

support environmental friendly and it<br />

can obtain more worthwhile<br />

recognition


7. Easy to be maintained<br />

Less wastage; around 1-2% 1<br />

Remedial work for de-bonding of<br />

plastering


8. Cost savings<br />

20% than concrete block with 3m height<br />

because of eliminating 2 layers of<br />

plastering<br />

100% than concrete block with 7m height<br />

because of eliminating steel stiffeners and<br />

plastering<br />

170% than non-structural RC wall


Benefits for the contractors<br />

1. Minimize “wet trade”<br />

2. Construction time saving<br />

3. Good on “load-bearing”<br />

4. Flexible to be changed


Benefits for the<br />

contractors<br />

5. Larger span<br />

6. Less coordination<br />

work<br />

7. Cost savings


1. Minimize “Wet-Trade”<br />

No plastering needed on Gypsum<br />

<strong>Block</strong><br />

Less construction waste and better<br />

site condition


2. Construction Time Saving<br />

It can be built at 25m 2 /manday<br />

It can be built independently before<br />

installation of pipes and services<br />

Does not require plastering and steel<br />

stiffeners under 7m height


3. Good on Load-bearing<br />

Pull out test and shear test are 1.4kN &<br />

2.3kN, they prove the loading capacity is<br />

the same as 30MPa concrete, 4-54<br />

5 times<br />

than light weighted blocks<br />

Each anchor can be hanged more than<br />

100lbs with 5 (FOS) Factor of Safety


4. Flexible for pipe &<br />

services installation<br />

Any opening or slots can be filled by small<br />

pieces of gypsum block and gypsum<br />

adhesive<br />

Partition can be built even the fitting out<br />

design haven’t t yet finalized


5 Bigger Span<br />

100mm thick gypsum block wall can be<br />

build up to 7m height partition without any<br />

steel stiffener support<br />

(i.e Based on DIN 4103 part2 and ICE<br />

calculations)<br />

It can replace non-structure R.C. wall


6. Less coordination work<br />

It has no plastering needed, it can<br />

•<br />

save coordination work<br />

It can make an “extra” straight and<br />

•<br />

smooth surface of the wall, there<br />

will be no argument with printing<br />

contractor


7. Cost saving<br />

Besides $$ savings as mentioned, the<br />

intangible cost savings are as follows:-<br />

Rubbish and construction waste handling<br />

Steel stiffeners if required<br />

Replace non-structure R.C. wall<br />

Construction time(30m 2 /manday)<br />

Remedial work on defects handling by de-<br />

bonded plaster


Job Reference in HK & Macau<br />

60+ projects since 2004, including:<br />

Residential<br />

Commercial Offices<br />

Cinema<br />

Shopping Malls<br />

MTR Station<br />

Airport projects<br />

Institutional


2. IFC Phase II<br />

(June 2004)


6. Proposed Residential at<br />

Discovery Bay, Phase 13<br />

(October 2004)


7. Kam Sing Cinema Redevelopment<br />

(November 2004)


9. Goodview Commercial Centre<br />

(February 2005)


15. SkyPlaza Building Works in Airport<br />

(September 2005)


20. Proposed Shopping Mall at Wing Fung Street, Wan Chai -<br />

Swire Properties Project<br />

(December 2005)


23. Station Commercial Works at Diamond Hill<br />

MTR Station<br />

(January 2006)


34. ASD Project – Redevelopment of Yuen Long<br />

Chamber of Commerce Primary School (May<br />

2007)


36. Residential Redevelopment at 38 Shelley<br />

Street, Sheung Wan.<br />

(May 2007)


37. Residential Development at 354 Un Chau Street,<br />

Cheung Sha Wan.<br />

(July 2007)


39. MTRC TKO South Station.<br />

(August 2007)


47.SKYCITY Marriott Hotel Project – October 2007<br />

Airport Authority Project


50. Student Hostel of University of Science and<br />

Technology of Hong Kong (April 2008)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!