02.06.2014 Views

AUGREEN Block Wall System

AUGREEN Block Wall System

AUGREEN Block Wall System

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Presentation of<br />

“<strong>AUGREEN</strong>”<br />

BLOCK WALL SYSTEM<br />

For<br />

Green Council<br />

By: CaSO (HK) Eng. Co. Ltd<br />

Date: 15 August 2008


Why ?<br />

“<strong>AUGREEN</strong> Gypsum block”<br />

=<br />

“Green” product


Environmental Friendly<br />

GYPSUM BLOCK<br />

VS<br />

CONCRETE BLOCK


Environmental Friendly<br />

8 benefits to our society and<br />

construction industry<br />

Regulate relative humidity (R.H.)<br />

Reuse of Sulphur dioxide(SO 2 )<br />

Energy efficient<br />

Light weight


Environmental Friendly<br />

8 benefits to our society and<br />

construction industry<br />

Less construction waste<br />

Recyclable<br />

Less “wet-trade”<br />

No harm to health


(1) Regulate relative humidity<br />

Absorb moist from air and<br />

release out when R.H.<br />

drops<br />

Stop running water on wall<br />

during February to May


(2) Reuse of Sulphur Dioxide<br />

CaCO 3 + SO 2 CaSO 4 · ½ H 2 O<br />

(i.e. 50% of gypsum block is made by the de-<br />

sulphur gypsum. China light will build FGD<br />

plant to reuse of SO 2 in 2009!)<br />

Prevent production of acid rain


(3) Energy-efficient<br />

efficient<br />

50% saving of energy during<br />

production process for gypsum<br />

than cement<br />

70% more materials can be used<br />

of same tonnage (i.e. Coverage)<br />

>> 70% of production energy<br />

saving per tonnage.


(4) Light-weight<br />

780kg/m 3 - 900kg / m 3<br />

1,950kg / m 3<br />

VS<br />

Less than 1000MT dead load for<br />

20 storey building >> Longer life!!


(5) Less rubbish<br />

Less rubbish from plastering<br />

>> Save $$ on handling<br />

construction waste.


(6) Recyclable<br />

Hydrated gypsum Calcined<br />

gypsum<br />

Recycling process can be done<br />

under heat and pressure


(7) Less “Wet-trade”<br />

Better site environment<br />

Less wastage


(8) No harm to health


Benefits for the<br />

developer<br />

1. More spacious<br />

2. Sound insulation<br />

3. Fire protection<br />

4. Light weighted


Benefits for the<br />

development<br />

5. Good alignment<br />

6. Environment friendly<br />

7. Easy to be maintained<br />

8. Cost savings


1. More spacious<br />

80 mm Vs 130mm (100 mm concrete<br />

block wall with 2 layers of 15mm plasters)<br />

thickness each wall with 2 hrs FRP<br />

100mm Vs 265mm (225mm concrete<br />

block wall with 2 layers of 15mm plasters)<br />

for basement with 4 hrs FRP


2. Sound Insulation<br />

STC From 37dB – 41dB by single<br />

layer, STC 66dB can be achieved by<br />

double wall system<br />

It had been used in Newport cinema<br />

to be the sound insulation partition;<br />

band rooms for BGCA.


3. Fire Protection<br />

2 hrs – 4 hrs FRP can be achieved by<br />

80mm and 100mm gypsum block<br />

It has achieved BD approval in 2005.<br />

www.bd.gov.hk/english/inform/CDB/C<br />

DBOFRP.pdf (Our ref.# BD - E003;<br />

E226)


4. Light Weight<br />

780kg / m 3 of Gypsum Vs 1,950kg /<br />

m 3 of concrete<br />

It is suitable for A&A works for loading<br />

calculation.<br />

It can save some steel rebar at<br />

“footing”


5. Good alignment<br />

Due to the precise “Tongue & Groove”<br />

joint, flat and smooth surface can be<br />

achieved (0.5 mm tolerance)<br />

It does not require plastering so that<br />

painting, wall-paper or tiles can be put<br />

directly on gypsum block


6. Environmental Friendly<br />

It is contribution to our environment<br />

and society without additional cost<br />

It is the worldwide responsibility to<br />

support environmental friendly and it<br />

can obtain more worthwhile<br />

recognition


7. Easy to be maintained<br />

Less wastage; around 1-2% 1<br />

Remedial work for de-bonding of<br />

plastering


8. Cost savings<br />

20% than concrete block with 3m height<br />

because of eliminating 2 layers of<br />

plastering<br />

100% than concrete block with 7m height<br />

because of eliminating steel stiffeners and<br />

plastering<br />

170% than non-structural RC wall


Benefits for the contractors<br />

1. Minimize “wet trade”<br />

2. Construction time saving<br />

3. Good on “load-bearing”<br />

4. Flexible to be changed


Benefits for the<br />

contractors<br />

5. Larger span<br />

6. Less coordination<br />

work<br />

7. Cost savings


1. Minimize “Wet-Trade”<br />

No plastering needed on Gypsum<br />

<strong>Block</strong><br />

Less construction waste and better<br />

site condition


2. Construction Time Saving<br />

It can be built at 25m 2 /manday<br />

It can be built independently before<br />

installation of pipes and services<br />

Does not require plastering and steel<br />

stiffeners under 7m height


3. Good on Load-bearing<br />

Pull out test and shear test are 1.4kN &<br />

2.3kN, they prove the loading capacity is<br />

the same as 30MPa concrete, 4-54<br />

5 times<br />

than light weighted blocks<br />

Each anchor can be hanged more than<br />

100lbs with 5 (FOS) Factor of Safety


4. Flexible for pipe &<br />

services installation<br />

Any opening or slots can be filled by small<br />

pieces of gypsum block and gypsum<br />

adhesive<br />

Partition can be built even the fitting out<br />

design haven’t t yet finalized


5 Bigger Span<br />

100mm thick gypsum block wall can be<br />

build up to 7m height partition without any<br />

steel stiffener support<br />

(i.e Based on DIN 4103 part2 and ICE<br />

calculations)<br />

It can replace non-structure R.C. wall


6. Less coordination work<br />

It has no plastering needed, it can<br />

•<br />

save coordination work<br />

It can make an “extra” straight and<br />

•<br />

smooth surface of the wall, there<br />

will be no argument with printing<br />

contractor


7. Cost saving<br />

Besides $$ savings as mentioned, the<br />

intangible cost savings are as follows:-<br />

Rubbish and construction waste handling<br />

Steel stiffeners if required<br />

Replace non-structure R.C. wall<br />

Construction time(30m 2 /manday)<br />

Remedial work on defects handling by de-<br />

bonded plaster


Job Reference in HK & Macau<br />

60+ projects since 2004, including:<br />

Residential<br />

Commercial Offices<br />

Cinema<br />

Shopping Malls<br />

MTR Station<br />

Airport projects<br />

Institutional


2. IFC Phase II<br />

(June 2004)


6. Proposed Residential at<br />

Discovery Bay, Phase 13<br />

(October 2004)


7. Kam Sing Cinema Redevelopment<br />

(November 2004)


9. Goodview Commercial Centre<br />

(February 2005)


15. SkyPlaza Building Works in Airport<br />

(September 2005)


20. Proposed Shopping Mall at Wing Fung Street, Wan Chai -<br />

Swire Properties Project<br />

(December 2005)


23. Station Commercial Works at Diamond Hill<br />

MTR Station<br />

(January 2006)


34. ASD Project – Redevelopment of Yuen Long<br />

Chamber of Commerce Primary School (May<br />

2007)


36. Residential Redevelopment at 38 Shelley<br />

Street, Sheung Wan.<br />

(May 2007)


37. Residential Development at 354 Un Chau Street,<br />

Cheung Sha Wan.<br />

(July 2007)


39. MTRC TKO South Station.<br />

(August 2007)


47.SKYCITY Marriott Hotel Project – October 2007<br />

Airport Authority Project


50. Student Hostel of University of Science and<br />

Technology of Hong Kong (April 2008)

Hooray! Your file is uploaded and ready to be published.