AUGREEN Block Wall System
AUGREEN Block Wall System
AUGREEN Block Wall System
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Presentation of<br />
“<strong>AUGREEN</strong>”<br />
BLOCK WALL SYSTEM<br />
For<br />
Green Council<br />
By: CaSO (HK) Eng. Co. Ltd<br />
Date: 15 August 2008
Why ?<br />
“<strong>AUGREEN</strong> Gypsum block”<br />
=<br />
“Green” product
Environmental Friendly<br />
GYPSUM BLOCK<br />
VS<br />
CONCRETE BLOCK
Environmental Friendly<br />
8 benefits to our society and<br />
construction industry<br />
Regulate relative humidity (R.H.)<br />
Reuse of Sulphur dioxide(SO 2 )<br />
Energy efficient<br />
Light weight
Environmental Friendly<br />
8 benefits to our society and<br />
construction industry<br />
Less construction waste<br />
Recyclable<br />
Less “wet-trade”<br />
No harm to health
(1) Regulate relative humidity<br />
Absorb moist from air and<br />
release out when R.H.<br />
drops<br />
Stop running water on wall<br />
during February to May
(2) Reuse of Sulphur Dioxide<br />
CaCO 3 + SO 2 CaSO 4 · ½ H 2 O<br />
(i.e. 50% of gypsum block is made by the de-<br />
sulphur gypsum. China light will build FGD<br />
plant to reuse of SO 2 in 2009!)<br />
Prevent production of acid rain
(3) Energy-efficient<br />
efficient<br />
50% saving of energy during<br />
production process for gypsum<br />
than cement<br />
70% more materials can be used<br />
of same tonnage (i.e. Coverage)<br />
>> 70% of production energy<br />
saving per tonnage.
(4) Light-weight<br />
780kg/m 3 - 900kg / m 3<br />
1,950kg / m 3<br />
VS<br />
Less than 1000MT dead load for<br />
20 storey building >> Longer life!!
(5) Less rubbish<br />
Less rubbish from plastering<br />
>> Save $$ on handling<br />
construction waste.
(6) Recyclable<br />
Hydrated gypsum Calcined<br />
gypsum<br />
Recycling process can be done<br />
under heat and pressure
(7) Less “Wet-trade”<br />
Better site environment<br />
Less wastage
(8) No harm to health
Benefits for the<br />
developer<br />
1. More spacious<br />
2. Sound insulation<br />
3. Fire protection<br />
4. Light weighted
Benefits for the<br />
development<br />
5. Good alignment<br />
6. Environment friendly<br />
7. Easy to be maintained<br />
8. Cost savings
1. More spacious<br />
80 mm Vs 130mm (100 mm concrete<br />
block wall with 2 layers of 15mm plasters)<br />
thickness each wall with 2 hrs FRP<br />
100mm Vs 265mm (225mm concrete<br />
block wall with 2 layers of 15mm plasters)<br />
for basement with 4 hrs FRP
2. Sound Insulation<br />
STC From 37dB – 41dB by single<br />
layer, STC 66dB can be achieved by<br />
double wall system<br />
It had been used in Newport cinema<br />
to be the sound insulation partition;<br />
band rooms for BGCA.
3. Fire Protection<br />
2 hrs – 4 hrs FRP can be achieved by<br />
80mm and 100mm gypsum block<br />
It has achieved BD approval in 2005.<br />
www.bd.gov.hk/english/inform/CDB/C<br />
DBOFRP.pdf (Our ref.# BD - E003;<br />
E226)
4. Light Weight<br />
780kg / m 3 of Gypsum Vs 1,950kg /<br />
m 3 of concrete<br />
It is suitable for A&A works for loading<br />
calculation.<br />
It can save some steel rebar at<br />
“footing”
5. Good alignment<br />
Due to the precise “Tongue & Groove”<br />
joint, flat and smooth surface can be<br />
achieved (0.5 mm tolerance)<br />
It does not require plastering so that<br />
painting, wall-paper or tiles can be put<br />
directly on gypsum block
6. Environmental Friendly<br />
It is contribution to our environment<br />
and society without additional cost<br />
It is the worldwide responsibility to<br />
support environmental friendly and it<br />
can obtain more worthwhile<br />
recognition
7. Easy to be maintained<br />
Less wastage; around 1-2% 1<br />
Remedial work for de-bonding of<br />
plastering
8. Cost savings<br />
20% than concrete block with 3m height<br />
because of eliminating 2 layers of<br />
plastering<br />
100% than concrete block with 7m height<br />
because of eliminating steel stiffeners and<br />
plastering<br />
170% than non-structural RC wall
Benefits for the contractors<br />
1. Minimize “wet trade”<br />
2. Construction time saving<br />
3. Good on “load-bearing”<br />
4. Flexible to be changed
Benefits for the<br />
contractors<br />
5. Larger span<br />
6. Less coordination<br />
work<br />
7. Cost savings
1. Minimize “Wet-Trade”<br />
No plastering needed on Gypsum<br />
<strong>Block</strong><br />
Less construction waste and better<br />
site condition
2. Construction Time Saving<br />
It can be built at 25m 2 /manday<br />
It can be built independently before<br />
installation of pipes and services<br />
Does not require plastering and steel<br />
stiffeners under 7m height
3. Good on Load-bearing<br />
Pull out test and shear test are 1.4kN &<br />
2.3kN, they prove the loading capacity is<br />
the same as 30MPa concrete, 4-54<br />
5 times<br />
than light weighted blocks<br />
Each anchor can be hanged more than<br />
100lbs with 5 (FOS) Factor of Safety
4. Flexible for pipe &<br />
services installation<br />
Any opening or slots can be filled by small<br />
pieces of gypsum block and gypsum<br />
adhesive<br />
Partition can be built even the fitting out<br />
design haven’t t yet finalized
5 Bigger Span<br />
100mm thick gypsum block wall can be<br />
build up to 7m height partition without any<br />
steel stiffener support<br />
(i.e Based on DIN 4103 part2 and ICE<br />
calculations)<br />
It can replace non-structure R.C. wall
6. Less coordination work<br />
It has no plastering needed, it can<br />
•<br />
save coordination work<br />
It can make an “extra” straight and<br />
•<br />
smooth surface of the wall, there<br />
will be no argument with printing<br />
contractor
7. Cost saving<br />
Besides $$ savings as mentioned, the<br />
intangible cost savings are as follows:-<br />
Rubbish and construction waste handling<br />
Steel stiffeners if required<br />
Replace non-structure R.C. wall<br />
Construction time(30m 2 /manday)<br />
Remedial work on defects handling by de-<br />
bonded plaster
Job Reference in HK & Macau<br />
60+ projects since 2004, including:<br />
Residential<br />
Commercial Offices<br />
Cinema<br />
Shopping Malls<br />
MTR Station<br />
Airport projects<br />
Institutional
2. IFC Phase II<br />
(June 2004)
6. Proposed Residential at<br />
Discovery Bay, Phase 13<br />
(October 2004)
7. Kam Sing Cinema Redevelopment<br />
(November 2004)
9. Goodview Commercial Centre<br />
(February 2005)
15. SkyPlaza Building Works in Airport<br />
(September 2005)
20. Proposed Shopping Mall at Wing Fung Street, Wan Chai -<br />
Swire Properties Project<br />
(December 2005)
23. Station Commercial Works at Diamond Hill<br />
MTR Station<br />
(January 2006)
34. ASD Project – Redevelopment of Yuen Long<br />
Chamber of Commerce Primary School (May<br />
2007)
36. Residential Redevelopment at 38 Shelley<br />
Street, Sheung Wan.<br />
(May 2007)
37. Residential Development at 354 Un Chau Street,<br />
Cheung Sha Wan.<br />
(July 2007)
39. MTRC TKO South Station.<br />
(August 2007)
47.SKYCITY Marriott Hotel Project – October 2007<br />
Airport Authority Project
50. Student Hostel of University of Science and<br />
Technology of Hong Kong (April 2008)