<strong>Challenge</strong> A: A <strong>more</strong> <strong>and</strong> <strong>more</strong> <strong>energy</strong> <strong>efficient</strong> <strong>railway</strong><br />
The simulation results show the interest of a combination of storage systems with batteries <strong>and</strong> ultra<br />
capacitors. In fact, the battery will provide or store the power fluctuations in order to obtain the<br />
output of the power converter P charge of 7Kw.<br />
Profiles of real power from renewable generators are very volatile. The battery will undergo very<br />
large changes in its terminals. Yet, it is not expected to produce as many rounds in such a short<br />
time. We must, therefore, put in place in the supervision of the filtering equation powers to smooth<br />
these variations in order not to reduce the lifetime of this storage system.<br />
Figure 5 : Model concept of MATLAB / SIMULINK system<br />
The figure here below shows the management of the slow component from the battery <strong>and</strong> the<br />
management of the fast component by ultra capacitors.<br />
Curve of power sent to<br />
the battery<br />
Curve of power sent to<br />
the ultra capacitor<br />
Figure 6 : Monitoring <strong>and</strong> filtering of all battery ultra capacitors