07.06.2014 Views

Challenge A: A more and more energy efficient railway Substation ...

Challenge A: A more and more energy efficient railway Substation ...

Challenge A: A more and more energy efficient railway Substation ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Challenge</strong> A: A <strong>more</strong> <strong>and</strong> <strong>more</strong> <strong>energy</strong> <strong>efficient</strong> <strong>railway</strong><br />

The simulation results show the interest of a combination of storage systems with batteries <strong>and</strong> ultra<br />

capacitors. In fact, the battery will provide or store the power fluctuations in order to obtain the<br />

output of the power converter P charge of 7Kw.<br />

Profiles of real power from renewable generators are very volatile. The battery will undergo very<br />

large changes in its terminals. Yet, it is not expected to produce as many rounds in such a short<br />

time. We must, therefore, put in place in the supervision of the filtering equation powers to smooth<br />

these variations in order not to reduce the lifetime of this storage system.<br />

Figure 5 : Model concept of MATLAB / SIMULINK system<br />

The figure here below shows the management of the slow component from the battery <strong>and</strong> the<br />

management of the fast component by ultra capacitors.<br />

Curve of power sent to<br />

the battery<br />

Curve of power sent to<br />

the ultra capacitor<br />

Figure 6 : Monitoring <strong>and</strong> filtering of all battery ultra capacitors

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!